Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Cambian Childcare Limited in Cambridgeshire

Inspected 15 Apr 2025 · published 26 Jun 2025 · URN 1257796

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Cambian Childcare Limited

  • Inspection date verified

    15 Apr 2025

  • Inspectors verified

    Deirdra Keating, Mark Anderton, Mary Costello

  • Helped and protected verified

    Requires improvement to be good

  • Leadership and management verified

    Inadequate

  • Overall effectiveness verified

    Requires improvement to be good

  • Name on report verified

    1257796

  • URN verified

    1257796

Page 1 of 11
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Grade profile

Hollow rings show the previous inspection, 2024.

  • OverallRI to be good
  • Helped and protectedRI to be good
  • Leadership and managementInadequate

13% of comparable inspections in the last three years were graded Requires improvement to be good (12,716 inspections).

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−73Very criticalmore positive than 3% of reports of this type graded Requires improvement to be good
OutstandingGoodRIInadequate

Reads more critically than most reports of this type graded Requires improvement to be good.

Markers show where typical reports of each grade sit.

Praiseeffectivepositiveextremelyindependentconfidentpromptlyconfidentlysafe
Criticismconcernspoorharmunsafeconcernfailedlimitedinadequate

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1653w−80
  • What needs to improve658w−31

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
11
Words of findings
2,291
about usual (typical 1899)
Reading level
Hard
Flesch 49, typical 50
Average sentence
15 words
Next steps
4
typical 8
Hedged sentences
7%
“some”, “not always”, “most”…

Where the words go

Findings 62%What needs to improve 25%About the inspection 14%

Full report text

Inspection report children’s home: 1257796 1 Registered provider: Cambian Childcare Limited

p.1

Full inspection Inspected under the social care common inspection framework

p.1

Information about this children’s home

This home is owned by a private company. It provides care for up to 12 children with ongoing mental health needs who may not be able to live in the community without continued support.

p.1

Information about this children’s home

There is a separately registered school on site. The inspectors only inspected the social care provision.

p.1

Information about this children’s home

The registered manager left the home in October 2024.

p.1

Overall experiences and progress of

children and young people, taking into account

p.1

requires improvement to be good

How well children and young people are helped and protected requires improvement to be good

p.1

requires improvement to be good

The effectiveness of leaders and managers inadequate

p.1

requires improvement to be good

The children’s home is not yet delivering good help and care for children and young people. However, there are no serious or widespread failures that result in their welfare not being safeguarded or promoted.

p.1

requires improvement to be good

Overall judgement at last inspection: good

p.1

requires improvement to be good

Enforcement action since last inspection: At a monitoring visit on 7 November 2024, Ofsted served a restriction of accommodation notice and compliance notices under the protection of children and the leadership and management of the home. On 16 December 2024, Ofsted identified that the restriction of accommodation notice had been adhered to and sufficient action to address the steps outlined in both compliance notices had been made. Therefore, the restriction of accommodation was lifted. Inspection report children’s home: 1257796 2

p.1

Inspection date Inspection type Inspection judgement

03/04/2024 Full Good 16/01/2024 Full Good 13/12/2022 Full Good 20/04/2021 Full Good Inspection report children’s home: 1257796 3

p.2

improvement to be good

This inspection was brought forward to address concerns that have been sent to Ofsted in notifications. At the time of this inspection, there were seven children living at the home. Inspectors spoke to two children and spent time with others who preferred not to share their views.

p.3

improvement to be good

Since the last monitoring inspection, three children have moved into the home. One of these children moved on from the home in an unplanned move after a short time. This was because staff could not meet their needs safely. The home has recently been through an extremely turbulent period with group dynamics that led to escalating incidents. This has led to instability and uncertainty for several children. Leaders and managers have failed to maintain effective oversight during this time. This has adversely affected children’s experiences and reduced the quality of care provided. Despite this, some children have reduced their risks of self-harm and are responding well to the therapeutic support provided.

p.3

improvement to be good

The decision to take new children with other children lacks logic and fails to assess the combined risks. Children expressed that they were concerned with how quickly other children were moving in. Three children moved into the home in quick succession over the course of three weeks. The depth and quality of the planning arrangements for one child were poor. Leaders and managers did not ensure all of the available information was assessed thoroughly. This fails to support the decision-making for the child to move to the home. Consequently, the group tensions increased. This led to children leaving the home together and experiencing harm. The staff could not respond safely and required police assistance on several occasions.

p.3

improvement to be good

Children’s attendance to the onsite school is very low. Most children have experienced gaps in their education before moving to the home. All children have education plans. However, there is limited support to improve children’s sleep routines and low school attendance. It is not clear how staff are working with children to improve their confidence to re-engage in education. One staff member said that previous boundaries and incentives to support children’s attendance have reduced.

p.3

improvement to be good

Although children’s progress and day-to-day experiences are variable, some children do make clear progress in their independence and life skills. There are plans for two children to move on to less supported environments due to the progress they have made.

p.3

improvement to be good

Staff support children’s health. Appropriate referrals are made for children to help with smoking cessation and substance misuse. Staff support and guide children in relation to their sexual health. Inspection report children’s home: 1257796 4 All children have access to an independent advocate to assist them in sharing their wider views and feelings. Children regularly participate in house meetings and one-to-one discussions with staff. Children are confident in sharing concerns with staff.

p.3

improvement to be good

A consultant psychiatrist and on-site psychology team work with children and staff. Most children engage in weekly therapy sessions. One child has been able to benefit from therapy for the first time. Staff regularly meet with the clinical team to ensure there is a joined-up approach.

p.4

improvement to be good

Staff offer children a range of activities that support their interests. Children have taken part in horse-riding sessions and trips to theme parks.

p.4

improvement to be good

On one occasion, leaders and managers failed to follow the safeguarding procedures when concerns were raised about staff. There was a significant delay of 37 days in referring an allegation of harm involving staff members to the local authority designated officer (LADO). This meant protective safeguards were not considered and external oversight was not in place when it should have been. The child retracted their concerns. However, the long delay has reduced the reliability of the resulting enquiries and investigation.

p.4

improvement to be good

There have been several other instances when leaders and managers have followed safeguarding procedures. When children have raised allegations of harm, LADO referrals have been made, and concerns have been appropriately investigated. Recent issues of poor staff practice have been identified and addressed promptly.

p.4

improvement to be good

Leaders and managers ensure most children’s risk management plans are appropriately reviewed and include individual strategies for staff to follow. However, when significant risks of self-harm for one child emerged, written guidance for staff to reduce this risk was not provided. This can limit staff’s alertness to the risk and lead to inconsistencies in how staff safely respond to the child.

p.4

improvement to be good

Frequent conflicts between children have occurred. Staff respond to conflicts between individual children. They document their concerns and explore children’s feelings. However, reparative work between children is limited. There is a failure to address the direct impact children’s actions have had on each other. As a result, children have not had always had adequate opportunities to resolve their differences.

p.4

improvement to be good

Children have high levels of complex mental health needs. There has been a cycle of high-risk behaviours among children. This has led to necessary restraints and an increase in instances when children are missing from the home. Although, staff are intervening in line with agreed plans most of the time, they have been unable to de- escalate unsafe situations confidently and safely. Reliance on police intervention is common. Inspection report children’s home: 1257796 5 There are notable gaps in some of the staff’s recording of incidents. These have reduced the assurances needed to verify staff’s actions in response to risks and incidents of concern. These include incidents when staff have used restraint, responded to self-harm or when children are missing from the home. This shortfall is compounded by the acute vulnerability of children in these circumstances.

p.4

The effectiveness of leaders and managers: inadequate

The home has not had a registered manager since October 2024. A new manager was appointed in January 2025. The manager has demonstrated a lack of knowledge in managing a large home for children with complex mental health needs. Following a management review the manager has left without registering with Ofsted. A new experienced manager has been appointed and is applying to register.

p.5

The effectiveness of leaders and managers: inadequate

Despite an awareness of most of the shortfalls identified at this inspection and plans to address these, the seriousness of these failures has the potential to significantly undermine the safe care and support provided to children. Leaders and managers have not been effective in prioritising the improvements that are necessary.

p.5

The effectiveness of leaders and managers: inadequate

Leaders and managers oversight and monitoring of the home are weak. There are several recommendations highlighted from the independent person’s monthly monitoring visits which are not actioned within an appropriate time frame. This has led to some of the recommendations being restated and staff practice not improving. There are numerous delays in staff compiling full records in relation to the use of physical intervention and response to children going missing from the home. Several records are poor quality and unclear. This has meant that the extent of staff’s support to de-escalate incidents in accordance with the model of support adopted at the home is unclear. Leaders and managers analysis and review of these incidents are either absent or poor. This has hindered the identification of any learning that is needed.

p.5

The effectiveness of leaders and managers: inadequate

The on-call systems for staff who need direct assistance does not always work. At times, when several children have left the home together and been in unsafe situations staff have been unable to contact the home for some time to request urgent support to manage a crisis.

p.5

The effectiveness of leaders and managers: inadequate

Leaders and managers have not ensured that court directed reports for one child have been shared with a social worker as required. Other social workers have reported that important information regarding recent incidents has not been shared within expected time frames. There is no suggestion that these issues have directly affected children’s safety. However, not sharing information in line with agreements can impede on multi- agency responses designed to reduce the risk of harm to children.

p.5

The effectiveness of leaders and managers: inadequate

Leaders and managers oversee a complaints procedure in response to children’s complaints. However, one parent raised a recent concern. In this instance, there has been an unreasonable delay in leaders and managers handling and responding to this complaint in accordance with the complaint’s procedure. Inspection report children’s home: 1257796 6 Generally, leaders and managers have ensured notifications are made to Ofsted when required. However, one allegation against a staff member was not notified without delay. This meant that Ofsted’s ability to monitor safeguards on this occasion was reduced.

p.5

The effectiveness of leaders and managers: inadequate

Professional feedback is mixed. Professionals have raised several concerns in relation to children’s poor routines and staff’s inability to manage the combined risks between children safely. One social worker was positive about a child’s overall progress in managing their emotions and building their independence.

p.6

The effectiveness of leaders and managers: inadequate

Despite the serious shortfalls identified at this inspection in relation to the leadership and management of the home. Staff said that generally they feel supported. Staff receive regular supervision and attend planned training. Further training has been identified by leaders and managers to support staff in improving their care of children. Inspection report children’s home: 1257796 7

p.6

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.

p.7

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.7

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.7

Requirement Due date

assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child;

p.7

Requirement Due date

are familiar with, and act in accordance with, the home’s child protection policies;

p.7

Requirement Due date

take effective action whenever there is a serious concern about a child’s welfare. (Regulation 12 (1) (2)(a)(i)(vi)(vii))

p.7

Requirement Due date

leaders and managers must ensure that referrals are made without delay to the local authority designated officer when allegations of abuse are made against staff;

p.7

Requirement Due date

leaders and managers must ensure that risk management plans are suitably reviewed when emerging risks for children are known. 30 May 2025

p.7

Requirement Due date

The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that—

p.7

Requirement Due date

helps children aspire to fulfil their potential; and

p.7

Requirement Due date

promotes their welfare. 30 May 2025 Inspection report children’s home: 1257796 8 In particular, the standard in paragraph (1) requires the registered person to—

p.7

Requirement Due date

lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose;

p.8

Requirement Due date

ensure that staff work as a team where appropriate;

p.8

Requirement Due date

use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1)(a)(b) (2)(a)(b)(h))

p.8

Requirement Due date

leaders and managers must monitor and ensure that records in relation to the matters outlined in regulation 36 schedule 3 are completed by staff;

p.8

Requirement Due date

leaders and managers must thoroughly review incidents of concern to ensure that any issues regarding the clarity of information provided or concerns about staff practice can be promptly identified and actioned;

p.8

Requirement Due date

leaders and managers must ensure internal emergency on-call procedures for staff are effective;

p.8

Requirement Due date

leaders and managers must ensure that the communication and sharing of information agreed with professionals, are adhered to.

p.8

Requirement Due date

The care planning standard is that children—

p.8

Requirement Due date

receive effectively planned care in or through the children’s home; and

p.8

Requirement Due date

have a positive experience of arriving at or moving on from the home. (Regulation 14 (1)(a)(b))

p.8

Requirement Due date

In particular, leaders and managers must implement a more effective system to understand the combined risks of children living together. 30 May 2025

p.8

Requirement Due date

The registered person must ensure that a record is made of any complaint, the action taken in response, and the outcome of any investigation. 30 May 2025 Inspection report children’s home: 1257796 9 (Regulation 39 (3))

p.8

Requirement Due date

The education standard is that children make measurable progress towards achieving their educational potential and are helped to do so.

p.9

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.9

Requirement Due date

help each child to achieve the child’s education and training targets, as recorded in the child’s relevant plans;

p.9

Requirement Due date

understand the barriers to learning that each child may face and take appropriate action to help the child to overcome any such barriers;

p.9

Requirement Due date

help each child to attend education or training in accordance with the expectations in the child’s relevant plans. (Regulation 8 (1) (2)(a)(i)(iii)(x)) 30 May 2025

p.9

Recommendations

 The registered person should ensure that conflicts between children are fully addressed. Specifically, they should ensure children consistently have opportunities to resolve their differences. (‘Guide to the Children’s Homes Regulations, including the quality standards’, page 39, paragraph 8.16)  The registered person should ensure that there is a system in place so that all allegations of abuse are notified to Ofsted, within 24 hours. (‘Guide to the Children’s Homes Regulations, including the quality standards’, page 63, paragraph 14.13)

p.9

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people, using the social care common inspection framework. This inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Inspection report children’s home: 1257796 10

p.9

Children’s home details

Registered provider: Cambian Childcare Limited

p.10

Children’s home details

Registered provider address: 5th Floor, Metropolitan House, 3 Darkes Lane, Potters Bar, Hertfordshire EN6 1AG

p.10

Inspectors

Mark Anderton, Social Care Inspector Mary Costello, Social Care Inspector Deirdra Keating, Social Care Inspector Inspection report children’s home: 1257796 11 achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection.

p.10

Inspectors

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.11

Inspectors

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.11

Inspectors

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.11

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion