Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 11 Jan 2010

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Linda Rockey

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Linda Rockey

  • Postcode verified

    NN2 6NS

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

0Mixedmore positive than 24% of reports of this type

In line with other reports of this type.

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspection positive critical

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
20
shorter than usual (typical 1049)
Reading level
—
Average sentence
10 words
Next steps
0
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 2%About the inspection 98%

Full report text

PROTECT-INSPECTION

September 2009 PROTECT-INSPECTION Page 1 11 December 2009

p.1

PROTECT-INSPECTION

Jane Brothers Kingsthorpe Grove Primary School Kingsthorpe Grove Northampton Northamptonshire NN2 6NS

p.1

Ofsted monitoring of Grade 3 schools

Thank you for the help which you and your staff gave when I inspected your school on 10 December 2009 and for the information which you provided before and during my visit. Please pass my thanks on to the staff and pupils for taking the time to talk to me.

p.1

Ofsted monitoring of Grade 3 schools

Since the last inspection, under the governance of the school, Kingsthorpe Children’s Centre has opened within the school’s grounds. In April 2009, a large-scale building programme started. This has resulted in significant disruption. On a rolling programme, classes have been moved both off and within the site to allow for refurbishment. However, careful leadership and management have enabled a smooth, phased development which is due to be completed by May 2010. There has been an increase in the number of pupils with autistic spectrum disorders attending the Designated Special Provision Unit.

p.1

Ofsted monitoring of Grade 3 schools

Since September, there have been several staff changes. An assistant headteacher post has been covered internally by a senior member of staff. Additional mathematics and English leaders have been appointed to increase capacity across the key stages. The science leader is on maternity leave. This role is being covered by the former post holder. As a result, more staff are actively involved in school improvement.

p.1

Ofsted monitoring of Grade 3 schools

Following the inspection on 9-10 December 2008, the school was asked to

p.1

Ofsted monitoring of Grade 3 schools

 raise standards in writing and using and applying mathematics throughout the school and ensure that more opportunities are provided for pupils to use these skills in other subjects  ensure that children in the Early Years Foundation Stage have more opportunities to develop their writing and number formation skills through structured play Serco Boundary House Wythall Green Way Wythall B47 6LW T 08456 40 40 40 enquiries@ofsted.gov.uk www.ofsted.gov.uk Direct T 0121 683 2048 Victoria.mortimore2@serco.com

p.1

PROTECT-INSPECTION

September 2009 PROTECT-INSPECTION Page 2  improve the quality of teaching, especially in Years 3 and 4, to ensure that information from assessment is rigorously used to plan the next steps of learning.

p.2

PROTECT-INSPECTION

Having considered all the evidence I am of the opinion that at this time the school has made:

p.2

PROTECT-INSPECTION

satisfactory progress in making improvements.

p.2

PROTECT-INSPECTION

satisfactory progress in demonstrating a better capacity for sustained improvement.

p.2

PROTECT-INSPECTION

You have worked closely with the school’s senior leaders to establish a clear understanding about what the school needs to do to improve. Some staff have left and this has given you the opportunity to restructure and share leadership across the school. Having two subject leaders for both English and mathematics has helped to speed up improvements in the standard of writing and the use of ‘real life’ mathematics across the school.

p.2

PROTECT-INSPECTION

You demonstrate an unequivocal commitment to eradicate inadequate teaching. Shortcomings identified through monitoring and evaluation activities have been addressed systematically and proportionately. New appointments have strengthened the quality of teaching. Where individual teachers need specific support, a targeted approach has been used to address their needs. The leadership team has begun to increase staff accountability for attainment and progress by setting up ‘achievement groups’ and holding pupil progress meetings.

p.2

PROTECT-INSPECTION

Members of the leadership team have delivered appropriate writing training for the whole staff. This approach has been used effectively. For example, establishing an agreed approach to ‘Big Writing’ and providing helpful written and verbal feedback. The constructive guidance that pupils receive is contributing to the improved progress seen in writing throughout the school. The introduction of Assessing Pupil Progress (APP) has aided staff to help pupils take the next step to improve their work. Pupils at Key Stage 2 are beginning to self-evaluate and many are able to articulate their targets.

p.2

PROTECT-INSPECTION

Detailed planning in the Foundation Stage provides opportunities for children to develop their writing and number formation skills. In Reception, children were eagerly practising their letters and sounds on the interactive whiteboard. Progress data show clear evidence that provision is beginning to have an impact on outcomes in communication skills, including writing. Support from the local authority has enabled the Foundation Stage practitioners to moderate the children’s profile assessments and secure an accurate baseline as children start Year 1.

p.2

PROTECT-INSPECTION

September 2009 PROTECT-INSPECTION Page 3 Despite a three year trend of improvement in pupils’ progress, in 2009, there was a decline in attainment in the national assessments for pupils at Year 6. Mathematics and writing, particularly boys’ writing, remain weaker. The school is aware that further work needs to be done to bring about improvements to attainment in English and mathematics. Senior leaders have already put in place appropriate actions to address these issues. The sound progress seen in most pupils’ books indicate that the strategy is beginning to have an impact. The school is demonstrating that it is capable of addressing the shortcomings identified in the last inspection.

p.3

PROTECT-INSPECTION

I hope that you have found the visit helpful in promoting improvement in your school. This letter will be posted on the Ofsted website.

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion