Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 12 Jan 2010

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Alan Taylor-Bennett

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Alan Taylor-Bennett

  • Postcode verified

    SW19 8EJ

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

0Mixedmore positive than 24% of reports of this type

In line with other reports of this type.

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspection positive critical

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
20
shorter than usual (typical 1049)
Reading level
—
Average sentence
10 words
Next steps
0
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 2%About the inspection 98%

Full report text

September 2009 PROTECT-INSPECTION Page 1 9 November 2009

p.1

Mrs D Russell Wimbledon Park Primary School Havana Road London SW19 8EJ

p.1

Ofsted monitoring of Grade 3 schools

Thank you for the help which you and your staff gave when I inspected your school on 20 October 2009 and for the information that you provided before and during my visit. I would be grateful if you would also pass my thanks on to the staff, pupils and governors for the warmth of their welcome and the significant part they played in the inspection visit.

p.1

Ofsted monitoring of Grade 3 schools

I note that there have been no significant changes to the staffing or status of the school since the last section 5 inspection. Your retirement at Christmas will involve the current deputy taking responsibility for the leadership of the school from January until a permanent headteacher is appointed next year.

p.1

Ofsted monitoring of Grade 3 schools

As a result of the inspection on 30 September and 1 October 2008, the school was asked to ensure that teachers take necessary actions to ensure that all pupils make good progress, to use information from assessments to plan and to support pupils to achieve well, and that the leadership of the school develop a sharper understanding of important areas for development.

p.1

Ofsted monitoring of Grade 3 schools

Having considered all the evidence, I am of the opinion that at this time the school has made:

p.1

Ofsted monitoring of Grade 3 schools

- satisfactory progress in making improvements

p.1

Ofsted monitoring of Grade 3 schools

- satisfactory progress in demonstrating a better capacity for sustained improvement.

p.1

Ofsted monitoring of Grade 3 schools

Since the last inspection, pupils’ attainment at the end of Key Stage 2 has remained above the national average and there have been improvements in the proportion of pupils achieving Level 5 in mathematics. Although the standard of pupils’ reading is Tribal Group 1-4 Portland Square Bristol BS2 8RR T 08456 40 40 40 enquiries@ofsted.gov.uk www.ofsted.gov.uk

p.1

PROTECT-INSPECTION

September 2009 PROTECT-INSPECTION Page 2 above average, their relatively less well developed writing skills mean that a smaller number than expected achieved two levels of progress in English over the key stage. The school has responded to this by beginning to plan a wider range of opportunities to develop writing skills and there is already evidence of the positive impact of this response. Attainment at Key Stage 1 remains above the national average overall. The strengths identified in the Early Years and Foundation Stage in the previous inspection are still evident.

p.2

PROTECT-INSPECTION

The satisfactory progress that pupils continue to make throughout their time at the school, together with pupils’ above average attainment, means that their overall achievement is satisfactory. Other outcomes for pupils remain strong and the school has maintained its outstanding ethos of care, support and community spirit, and its successful focus on pupils’ well-being and their outstanding personal development.

p.2

PROTECT-INSPECTION

Staff and governors have responded positively and with enthusiasm to the challenges of the last inspection report. Senior leaders have prioritised improving the progress made by pupils, and they now show a clear understanding of what needs to be done. For example, the school now uses a system that records the attainment of all pupils, based on reliable assessment processes, to generate targets for individuals and groups of learners, and to monitor and influence their progress. For example, the data generated make a very useful basis for the regular reviews of pupils’ progress that are undertaken. In addition, teachers are beginning to make use of this assessment data in planning lessons. This development is complemented by a good programme of staff training, regular sharing of expertise, and evaluation of the impact of these developments in classrooms. The combined effect has been to improve the proportion of good and outstanding teaching. However, because the

p.2

PROTECT-INSPECTION

system to monitor progress is still relatively new, it has not yet been able to influence the quality of outcomes in end of key stage tests or to influence the quality of teaching to its full potential. Areas for development still include further refinements in judging the quality of teaching and the use of assessment in classrooms in relation to its impact, and improving the degree of challenge provided for learners.

p.2

PROTECT-INSPECTION

This means that the progress that the school has made in these areas at this time is judged as satisfactory. However, these developments are of such quality, and their introduction has been so well managed, that they clearly have good potential to support further improvements in pupils’ progress. In addition, senior leaders now have a good grasp of what has to be done to improve the school further and the handover to the new leadership from January has been managed well. These factors demonstrate that the school has made progress in demonstrating a better capacity to make further improvements.

p.2

PROTECT-INSPECTION

The satisfactory support provided by the local authority in assisting the school to respond to the findings of the last inspection has been valued. Plans are in place to support the sustained improvement of the school under the interim leadership of the deputy next year.

p.2

PROTECT-INSPECTION

September 2009 PROTECT-INSPECTION Page 3 I hope that you have found the visit helpful in promoting improvement in your school. This letter will be posted on the Ofsted website.

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion