Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 26 Nov 2008

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Sue Aldridge

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Sue Aldridge

  • Postcode verified

    S40 4RD

Page 1 of 2
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

0Mixedmore positive than 24% of reports of this type

In line with other reports of this type.

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspection positive critical

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
2
Words of findings
12
shorter than usual (typical 1049)
Reading level
—
Average sentence
12 words
Next steps
0
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 2%About the inspection 98%

Full report text

Mrs V Fisher Cresswell Support Centre Cuttholme Road Chesterfield Derbyshire S40 4RD

p.1

Ofsted monitoring of Grade 3 schools

Thank you for the help which you and your staff gave me when I inspected your pupil referral unit (PRU) on 5 November, for the time you gave to our ‘phone discussions and for the information which you provided before and during my visit. Please pass on my thanks to those students and representatives of the local authority and the management committee with whom I had helpful discussions.

p.1

Ofsted monitoring of Grade 3 schools

The PRU has experienced challenging circumstances since it was last inspected. These include three changes of leadership, instances of long-term staff illness and 22 days of closure which were the result of several break-ins, insufficient staff to run the centre and health and safety concerns. The local authority (LA) designated the centre as a school causing concern in June 2008.

p.1

Ofsted monitoring of Grade 3 schools

This letter will be posted on the Ofsted website.

p.1

Ofsted monitoring of Grade 3 schools

As a result of the inspection on 14 November 2007, the school was asked to  Improve procedures for assessment to better inform teachers’ planning and self-evaluation  Improve self-evaluation of the centre’s work.  In collaboration with the local authority: - Effect the planned move to new premises - Establish an active management committee that fully meets the requirements of new regulations.

p.1

Ofsted monitoring of Grade 3 schools

Having considered all the evidence I am of the opinion that at this time the school is making satisfactory progress in addressing the issues for improvement and in raising the students’ achievement.

p.1

Ofsted monitoring of Grade 3 schools

Despite the considerable difficulties, staff have demonstrated a strong commitment to the centre. They have rightly focused on stabilising students’ behaviour and maintaining the quality of teaching and learning. The centre continues to provide a Cambridge Education Demeter House Station Road Cambridge CB1 2RS T 08456 40 40 40 enquiries@ofsted.gov.uk www.ofsted.gov.uk Direct T 01223 578500 Direct F 01223 578501 risp.inspections@camb-ed.com Page 2 calm learning environment, where students feel secure. They say that they are learning more here than they did at their previous schools because their behaviour is better. They particularly value the centre’s rewards system, which motivates them well. Although standards on entry are well below average for most students and they remain so by the end of Year 9, inspection evidence suggests that they make sufficient progress in their time at the centre. Progress is good in science. Last year

p.1

Ofsted monitoring of Grade 3 schools

more than half of the students made a gain of one National Curriculum level in this subject.

p.2

Ofsted monitoring of Grade 3 schools

The LA support team, in conjunction with the management committee, has taken suitable action to stabilise staffing at the centre. The secondment of an acting headteacher has accelerated the rate of improvement. She provides clear direction for staff as well as giving them time for development work. There is now a suitable improvement plan, linked to outcomes for students, that is being implemented effectively. Staff know students well and plan suitable work for them. Students are involved effectively in their learning. Teaching ensures that they know what they are learning about and reviews during lessons give students a sense of their own learning and progress. Baseline assessments in reading, writing, comprehension and science have been in place for some time. In the few weeks that the headteacher has been in post, staff have introduced procedures for baseline and ongoing assessment that are being adopted across all subjects. In time this will provide the

p.2

Ofsted monitoring of Grade 3 schools

basis on which student’s progress can be measured and evaluated. Students’ individual assessment files have been started and will include samples of levelled work as supporting evidence.

p.2

Ofsted monitoring of Grade 3 schools

A system for accurately evaluating students’ attendance is being developed, by refining the procedures already in place. Analysis of the percentages of personal targets that students’ achieve has commenced to give a picture for the centre each month. There are suitable plans to encourage greater student involvement in evaluating their behaviour and setting targets for themselves.

p.2

Ofsted monitoring of Grade 3 schools

The move to refurbished premises, delayed by unforeseen circumstances, has now been approved for the end of term. The management committee carries out its work in line with the existing regulations. The LA support team (LAST) have provided timely assistance that has strengthened the centre’s capacity to improve. The LAST monitors the progress of the improvement plan and reports directly to the management committee.

p.2

Ofsted monitoring of Grade 3 schools

I hope that you have found the visit helpful in promoting improvement in your centre.

p.2

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion