Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 20 Mar 2008

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

  • Name on report verified

    MONITORING VISIT: MAIN FINDINGS

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+57Positivemore positive than 56% of reports of this type

In line with other reports of this type.

Praiseimprovedoutstandingmake good progressrichstrengthssuccessfulimproving
Criticisminsufficientlydeclinelowernot clear

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

Findings positive critical

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
717
shorter than usual (typical 1049)
Reading level
Hard
Flesch 41, typical 45
Average sentence
15 words
Next steps
0
typical 5
Hedged sentences
14%
“some”, “not always”, “most”…

Where the words go

Findings 100%

Full report text

Context

Leyton Sixth Form College is situated on a single site in the London Borough of Waltham Forest. The college offers GCE A level, AS level and GCSE provision and vocational programmes at levels 1, 2 and 3. In 2006/07 approximately half of the 1953 learners attending courses live locally, most are aged 16-18 and full time. The college is situated in an area of some deprivation.

p.1

Context

Leyton Sixth Form College was last inspected in 2006. Capacity to improve and achievement and standards were judged to be good. Overall effectiveness, quality of provision and leadership and management were graded as satisfactory. Of the five curriculum areas inspected provision was good in three and satisfactory in two. The college also received an annual assessment visit in March 2007

p.1

progress

In 2005-06 overall success rates on long courses improved to 81%. The rate has been maintained in 2006/07 and success rates have improved overall by approximately 6 % in the past four years. Learners make good progress with their studies and value added analyses indicate that achievements overall are above those predicted from prior attainment. Long course success rates at levels 2 and 3 show continued improvement. Level 1 long course success rates show improvement in 2006/07 after a decline in 2005/06. College key skills data shows the success rates overall are improved to 63% in 2006/07 and significantly improved at level 2. Generally, success rates are greater for females than males overall and for the small number of adult learners significantly greater. The data for 2006/2007 also shows that learners from minority ethnic backgrounds continue to achieve above national averages. However, Black Caribbean boys’ success rates are lower compared to

p.1

progress

other minority ethnic learners at the college.

p.1

Progress

Self assessment is improved and is the result of well understood processes across the college. Teachers and curriculum managers contribute well to systematic course reviews. The self assessment report contains sound sources of evidence and links sufficiently to the quality improvement plan. The impact of planned action recorded in the current self assessment report links well to the previous report. The current self assessment report is sufficiently self critical and contains rich judgment. However, a few key strengths and areas for improvement contradict each other and some headlining judgements are no more than normal practice. In addition, some updates and milestones in the post inspection action plan are insufficiently clear to measure progress. Most grades in the self assessment report for 2006/07 are similar to those judged at the previous inspection. Leadership and management are now judged good as is overall effectiveness.

p.2

progress

Significant progress has been made in improving the college’s teaching and learning observation scheme. The structure of observations and moderation is well established. Improved links are made between observations and staff development and appraisal. The culture of quality improvement in teaching and learning is more accepted by all staff. Expertise in classroom observation is being developed well through the evaluation of observation records. Teachers are generally encouraged to support each other and to analyse the characteristics of good and outstanding teaching. The observation data are analysed well in the self assessment process. Useful new partnerships have been formed with local colleges to share practice. The college has recently started peer assessment in curriculum areas where teaching is judged particularly successful. Most curriculum staff recognise the improvement in the use of information learning technology. However, sharing of good practice

p.2

progress

generally across curriculum teams is still under-developed.

p.2

Progress

The college has made reasonable progress with implementing its strategy to improve accommodation for performing arts. Planning approval has been obtained and now funding approval in principle from the Learning and Skills Council. The accommodation plans incorporate sufficient space for the current college performing arts course offer. Consultation has taken place about the level of sound insulation and the configuration of teaching, changing rooms, storage, performance, and rehearsal spaces. Most performing arts provision won’t be affected by construction work and sufficient temporary accommodation is arranged for provision that is affected. Good planning has taken into consideration the equipping of all new accommodation. Performing arts teaching and technical staff are being consulted well on the shape and requirements of the new accommodation.

p.2

Progress

information quoted is reproduced verbatim without adaptation, and the source and date of publication are stated. Inspection reports are available on the Ofsted website (www.ofsted.gov.uk).

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion