Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 2 Jul 2007

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Peter Toft

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Peter Toft

  • Postcode verified

    CH45 3NF

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+35Positivemore positive than 42% of reports of this type

In line with other reports of this type.

Praisewell plannedhighly effectiveexcellentrigorousenjoyricheffectiveeffectively
Criticismlacklimitedgaps

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionLeadershipWhat needs to improve positive critical
  • Findings560w+11
  • Leadership105w+67
  • What needs to improve139w+60

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
784
shorter than usual (typical 1049)
Reading level
Hard
Flesch 47, typical 45
Average sentence
18 words
Next steps
3
typical 5
Hedged sentences
27%
“some”, “not always”, “most”…

Where the words go

Findings 61%Leadership 11%What needs to improve 15%About the inspection 13%

Full report text

Mr S Smurthwaite Headteacher St George’s Primary School St George’s Road Wallasey Wirral CH45 3NF

p.1

Ofsted survey inspection programme – design and technology

Thank you for your hospitality and co operation, and that of your staff during my visit on 22 May 2007 to look at the work in design and technology.

p.1

Ofsted survey inspection programme – design and technology

The visit provided valuable information which will contribute to our national evaluation and reporting. Published reports are likely to list the names of the contributing institutions, but individual institutions will not be identified in the main text. All feedback letters will be published on the Ofsted website at the end of each half-term.

p.1

Ofsted survey inspection programme – design and technology

The evidence used to inform the judgements made included: interviews with staff and pupils, scrutiny of relevant documentation, analysis of pupils’ work and observation of lessons.

p.1

Design and Technology

Provision for design and technology (D&T) is satisfactory overall, with some good features.

p.1

Achievement and standards

Achievement and standards are satisfactory overall.

p.1

Achievement and standards

 The coverage of D&T activities is good in the foundation stage and pupils progress and achieve well along a broad spectrum of activities.  In Years 1 and 2, pupils reach average, and sometimes above average, standards. They cover the expected range of activities, largely centred on materials such as paper and card with some resistant materials. They design by drawing and are adept at developing ideas as they model them. Some of the design work in Year 2 showed good use of technical vocabulary. Alexandra House 33 Kingsway London WC2B 6SE T 08456 40 40 40 F 0207 421 6855 enquiries@ofsted.gov.uk www.ofsted.gov.uk  In Years 3 and 4, pupils continue to make the progress expected. They clearly improve in the precision of their craftwork but they could be set work based on a more extensive use of resistant materials.  In Years 5 and 6, pupils carry out a range of projects to average and sometimes above average standards. Some of the pupils’ evaluation work seen

p.1

Achievement and standards

in Year 6 was rigorous. As with younger pupils, they benefit from interesting work set which links with the world outside school. Some of the older pupils produce design sketching of quality and imagination.  Overall, however, standards are average. This masks some above average work in parts of the school. It reflects a limited coverage in the curriculum in some stages and a lack of emphasis on resistant materials and systems and control in Key Stage 2.

p.2

Quality of teaching and learning

The quality of teaching and learning is good with some very good features.

p.2

Quality of teaching and learning

 In the lessons observed, teachers displayed very good general pedagogical skills and highly professional approaches to teaching and classroom management.  Subject expertise is sound overall with some good aspects. The gaps in the curriculum noted above, however, reflect a lack of expertise in the more technologically challenging parts of D&T, indicating a need for additional in- service training.  Differentiation is good as are planning and resource management.  The marking of ongoing work is helpful to pupils, especially the oral and written comments which stimulate them to develop their ideas further.  Pupils enjoy D&T very much, especially the scope it gives them to develop their ideas, solve problems and correct mistakes and some older ones are beginning to see the value it might have for them in adult life.

p.2

Quality of curriculum

The quality of the D&T curriculum is satisfactory.

p.2

Quality of curriculum

 Coverage in the foundation stage is good and pupils receive a rich diet of stimulating design and make tasks which develop capability and an understanding of the made world.  Coverage after this is satisfactory. Much of the work is based on the suggestions produced by the Qualifications and Curriculum Authority. The school has adapted these well to link to other work in the curriculum and has made effective use of other schemes to support its planning.  The projects covered are well planned, taught and sequenced.  The curriculum, however, is limited by lack of coverage of some aspects of the subject. Although timetabled time is enhanced by cross-curricular work and other activities, coverage is too restricted to be judged good or better, though the potential for improvement in D&T in this highly effective school is great.

p.2

Quality of leadership and management

The leadership and management of D&T are good.

p.3

Quality of leadership and management

 This very large school is run highly effectively and this creates a benign environment in which the curriculum can be well planned and taught.  The complex leadership of the subjects, divided as it is among four co- ordinators of the creative dimension of the curriculum, works well. This is well supported by the high level of collaboration between staff in the school.  The monitoring of the coverage of the D&T curriculum, and its teaching, is underdeveloped however, though co-ordinators have a good grasp of how well the curriculum is provided in their respective phases.

p.3

Points for improvement, which we discussed, included:

 as the D&T curriculum is developed, planning needs to ensure that the programme of study is properly covered in each year group  when reviewing the curriculum for D&T, consider seeking external guidance and in-service training on the nature of good and excellent practice, and how to achieve it within this foundation subject. This is also needed to develop skills in the more technological aspects of the subject, notably in resistant materials and systems and control  when developing cross-curricular links between subjects, consider how D&T might develop to apply what pupils learn in mathematics and science.

p.3

Points for improvement, which we discussed, included:

I hope these observations are useful as you continue to develop design and technology in the school. A copy of this letter will be sent to your local authority and will be available to the team for your next institutional inspection.

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion