Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted letter

Setting

Inspected — · published 15 Jun 2007

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Paul Joyce

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Paul Joyce

  • Postcode verified

    SN15 3QD

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+89Very positivemore positive than 97% of reports of this type

Reads more warmly than most reports of this type.

Praisestrongeffectivewell plannedwell designedimprovedimprovingpositiverigorous

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improve positive critical
  • Findings592w+88
  • What needs to improve78w+33

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
658
shorter than usual (typical 963)
Reading level
Hard
Flesch 44, typical 48
Average sentence
16 words
Next steps
3
typical 2
Hedged sentences
7%
“some”, “not always”, “most”…

Where the words go

Findings 88%What needs to improve 12%

Full report text

Alexandra House 33 Kingsway Holborn London WC2B 6SE T 08456 404045 F 020 7421 6855 www.ofsted.gov.uk

p.1

Ms Di Dale Principal Wiltshire College Cocklebury Road Chippenham Wiltshire SN15 3QD

p.1

Sector Skills Area 5 – Construction

Thank you for your hospitality and co-operation during my visit on 01 and 02 February 2007. I am particularly grateful to you and all your staff for the hard work that took place to prepare for the visit and for giving up a great deal of time during the visit to meet with me. Please pass on my thanks to all those concerned.

p.1

Sector Skills Area 5 – Construction

This visit is part of a series to provision in SSA 5 graded good or better at its most recent inspection, in order to evaluate how good practice has been brought about, further improved and sustained. The visit provided much useful evidence for the good practice survey in construction. Published reports are likely to list the names of the contributing institutions but should we wish to cite specific aspects of practice we will contact the college first. All letters, following survey visits, will be published on the Ofsted website at the end of each half-term.

p.1

Sector Skills Area 5 – Construction

The evidence used to inform the judgements made included: lesson observations; interviews with staff and learners; scrutiny of the examples of good practice provided including a tour of resources. I agreed to provide a summary of the observations of good practice seen and to suggest some areas for development.

p.1

Good practice observed

 The particularly good support for learners. Staff pay particular interest in the progress made by learners. Most learners speak very highly of the additional support, advice and guidance given by staff. Many staff provide additional ‘catch-up’ sessions for students and assist with portfolio building activities outside normal timetabled lessons.  The strong focus on improving provision. There is good support from the college management team with effective action planning, monitoring and evaluation. Useful staff development provided by both internal and external specialist practitioners has had a positive impact on teaching and learning and has contributed to improving success rates.  The rigorous monitoring of department progress and performance. Quality assurance arrangements are robust and rigorously applied. There is a strong commitment from construction managers and staff to improve provision. Action planning for improvement is detailed, clearly

p.1

Good practice observed

focused, and based on a sound evaluation of department performance.  The well devised tutorial, advice and guidance programme. The college has successfully developed a ‘community campus’ programme that includes many of the every child matters themes with materials produced to support the delivery and integration of these into curriculum area tutorial programmes.  The well planned theory teaching. Learning outcomes are clearly defined and teachers use a variety of strategies to encourage learner participation and engagement. Theory teaching is very closely linked to related practical activities.  The particularly effective arrangements for assessment in the plumbing. Learners have good access to assessors who frequently visit learners in the workplace to conduct assessment. Facilities for assessment in the college are well designed and provide good real-life working environments.  The good development of learners’ practical skills. Learners benefit

p.2

Good practice observed

from gaining skills over and above qualification requirements which are valued by employers in the workplace. The standard of work produced by many learners is high.  The good progression into industry employment or further training. Many learners gain employment within the industry during the period of, or at the end of their course. A significant number of learners also progress to further training, to a course at a higher level or to other courses to broaden their industry skills and knowledge.

p.2

Areas for development, which we discussed, included:

 to improve the physical resources available for teaching, training and assessment  to further develop systems to enable more effective tracking of learner progress across all aspects of their programme. I hope these observations are useful as you continue to develop construction provision in the college.

p.2

Areas for development, which we discussed, included:

As I explained in my previous letter, a copy of this letter will be sent to your LLSC. It will also be available to the team for your next institutional inspection.

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion