Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 5 Sept 2007

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

    Page 1 of 3
    Page 1 of the report

    Deep dive

    What this report says

    In plain English

    Join free to get a short, plain-English summary of any report.

    Tone of the report

    How positive or critical the inspectors' language is, from the words they chose. No AI involved.

    +22Mostly positivemore positive than 36% of reports of this type

    In line with other reports of this type.

    Praiseimprovedsuccessfuleffectivelyclearlysuccessfullyimprovingconfidentclear
    Criticisminadequateslownot clearnot consistently

    How the report reads, start to finish

    Every paragraph in order, sized by length. Tap one to see it on the page.

    Findings positive critical

    Strengths

    Quoted from the report. Tap to see it on the page.

    No standout praise found.

    Concerns

    Quoted from the report. Tap to see it on the page.

    Next steps

    Quoted from the report. Tap to see it on the page.

    No next steps set out.

    What the report dwells on

    Topics by how often they come up, coloured by how they are described. Open one for an example.

    Anatomy of the report

    How the report is built, against others of the same type and grade.

    Pages
    3
    Words of findings
    728
    shorter than usual (typical 1049)
    Reading level
    Hard
    Flesch 32, typical 45
    Average sentence
    16 words
    Next steps
    0
    typical 5
    Hedged sentences
    4%
    “some”, “not always”, “most”…

    Where the words go

    Findings 100%

    Full report text

    Context

    This visit follows the inspection in March 2006 at which TheLightBulb Ltd (TLB) was graded as satisfactory for leadership and management and for its arrangements for equality of opportunity. Quality improvement was judged inadequate. Business administration and law were judged good and construction, planning and the built environment were judged satisfactory. Overall effectiveness was satisfactory and inspectors judged the provider was in a good position to make improvements. Since that inspection TLB has moved to new premises in Basildon. It no longer provides vocationally related qualifications (VRQs) and now provides train to gain programmes in customer service, plant operations, team leading, and information technology (IT), and national vocational qualifications (NVQs) in site logistics at level 2 and site supervisor at level 3.

    p.1

    progress

    At the previous inspection achievement rates on business administration VRQs, the largest area of provision, were high. However, for some learners on specialist plant operations programmes progress in completing the NVQ was slow, although all achieved their NVQs at level 2. Since the start of the train to gain programme in January 2007, all 34 learners have completed their NVQ on time. TLB has made significant progress in setting challenging and individual target dates for learners to complete their qualification.

    p.1

    progress

    The provider has made reasonable progress in implementing literacy, numeracy and language support. Systems for enrolment and initial assessment have been standardised. TLB is successful at networking with other providers and has established a quality improvement group. Tutors work well to ensure the teaching of basic skills as an integral part of all learning programmes and record effectively the support they provide. Staff attend training to develop their awareness and understanding of skills for life. Suitable resources to support learning on and off site are being developed. Although all learners complete a satisfactory initial assessment, information collected is not used sufficiently to meet their support needs. Learners are referred to other providers that provide specialist support, although few take advantage of this.

    p.1

    progress

    At the previous inspection TLB had no skills for life strategy. A clear strategy now exists and includes satisfactory background information identifying strategic priorities. TLB clearly recognises the challenges facing employers and employees nationally. The strategy successfully highlights the importance of raising awareness among staff of ensuring skills for life are taught as an integral part of the main vocational programme. However, the strategy does not provide clear direction regarding the challenges and benefits of promoting skills for life to employers and learners. It includes statistics showing regional skills for life needs, but does not indicate whether TLB’s learners have a similar level of need. There are no clear goals to support learners, or targets to indicate the numbers of learners who require support for their literacy, numeracy and language skills or qualifications.

    p.2

    progress

    The provider has made significant progress in improving the management of its subcontractor. A clearly recorded joint approach exists to quality assure programme delivery and improve the learner experience. Both parties have regular monthly meetings and frequent communication to review and share ideas and discuss any problems. Improved initial assessment is jointly managed and learners’ individual programmes contain realistic targets for completion. A useful monitoring system helps staff to monitor progress against the targets. An improved audit system is planned from September.

    p.2

    progress

    Reasonable progress has been made in improving internal verification systems since inspection. At inspection TLB had no consistently applied arrangements for sampling or standardisation. Now all TLB’s candidates are sampled twice by a contracted internal verifier. The assessor, trainee assessor and internal verifier have standardisation meetings to discuss assessment decisions. The subcontractor now has satisfactory sampling and internal verification systems. Standardisation decisions are discussed at monthly meetings, which review the progress of all learners.

    p.2

    progress

    At the previous inspection the self-assessment report and development plan were satisfactory and inspectors were broadly confident with the self-assessment process. The current report is more realistic in grading sector subject areas based on relevant information. Although some judgement statements are good, others are not substantiated and some are no more than normal practice. The post inspection action plan is good and links well to the self-assessment report. The company identifies well which actions need prioritising. The development plan contains updates that provide sufficient information of progress.

    p.3

    progress

    provided that the information quoted is reproduced verbatim without adaptation, and the source and date of publication are stated. Inspection reports are available on the Ofsted website (www.ofsted.gov.uk).

    p.3

    Discuss this inspection

    Members compare notes on inspectors and inspections here. Join free to read and post.

    Join the discussion