Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 22 Dec 2006

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

  • Name on report verified

    ANNUAL ASSESSMENT VISIT: MAIN FINDINGS

Page 1 of 5
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+7Mostly positivemore positive than 28% of reports of this type

In line with other reports of this type.

Praiseimprovedeffectivesuccessfulstrengthstimelyclearly
Criticisminadequateseriouslyconcernbelowlow

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improve positive critical
  • Findings63w0
  • What needs to improve935w+7

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
5
Words of findings
985
about usual (typical 1049)
Reading level
Hard
Flesch 42, typical 45
Average sentence
16 words
Next steps
8
typical 5
Hedged sentences
5%
“some”, “not always”, “most”…

Where the words go

Findings 6%What needs to improve 94%

Full report text

Date of visit: 21 November 2006

This feedback contains brief findings from the annual assessment visit. It focuses on the themes explored during the visit and does not attempt to give a comprehensive overview of the college’s performance.

p.1

averages?

 Success rates for learners aged 16 to 18 on long courses overall and on level 2 courses in particular continued to improve significantly in 2005/06 and are above national averages.

p.1

provision improved to the national average?

 Success rates for adult learners on long courses overall and on level 1 courses in particular continued to improve significantly in 2005/06 and are above national averages.

p.1

and are they above national averages?

 Success rates for learners on short courses continued to improve significantly in 2005/06 and are above national averages.

p.1

Have they all improved in 2005/06, compared with 2004/05?

 Between 2004/05 and 2005/06, key skills success rates have improved by between 10 and 19 per cent. Wider key skills success rates have also improved and some are well above national averages.

p.1

areas?

 Success rates in engineering, construction and ICT improved in 2005/06 compared with 2004/05 and are above national averages. Work-based learning (WBL) framework success rates in ICT improved significantly between 2003/04 and 2005/06, albeit for a small number of learners.

p.2

engineering and construction improved in 2005/06?

 Overall apprenticeship success rates improved significantly between 2003/04 and 2005/06 and are above the national averages. Overall framework success rates for engineering and construction have improved significantly between 2003/04 and 2005/06. Timely success rates are very low and below national averages in both areas of learning. However, this is partly due to the college taking over the management of other providers’ contracts, which necessitated extensions of learning.

p.2

workplace?

 The college has a large ‘Train 2 Gain’ contract covering regional and national provision and which builds on previous NVQ and employer training pilot (ETP) provision. The college covers a wide range of curriculum areas through dedicated teams. It works with a diverse range of multi-national companies and small and medium sized enterprises. The college manages and monitors the programme well. Quality systems are thorough. Standardisation meetings are regular and managers monitor retention, achievement, attendance and punctuality rigorously. All learners complete an induction and exit questionnaire and the college seeks employers’ views. Financial management is effective. The NVQ success rate is well above the national average for adult learners and just below the national average for learners aged 16 to 18.

p.2

Has enrolment increased in 2006/07?

 The first year of operation has been successful. The overall retention rate is above the college’s average. Success rates on GCE A level subjects are above the national averages, except for biology. Success rates on GCE AS subjects are at national averages, but are not as high as the college wishes. Most learners met or exceeded their minimum target grades, except in biology. Enrolment has increased in 2006/07 compared with 2005/06. Managers have raised the entry requirements and the requirements for progression from GCE AS to GCE A level. The college has resolved the early problems associated with settling into a new building and has made the accommodation more learner-centred. The campus has an increasingly distinctive sixth form centre ethos.

p.3

tutorials observed?

 The proportion of inadequate lesson observations has decreased in 2005/06, compared with the proportions at the last inspection and during 2004/05. Lesson observation outcomes do link to appraisal and staff development, through relevant documentation. Two college staff internally moderated a large sample of lessons in 2005/06, but this team is small for a large college. Their observations reduced the proportion of good or better lessons and increased the proportion of inadequate lessons, compared with the college’s internal lesson observation profile. The number of paired observations to standardise grading is small but is to be increased in 2006/07. Teachers in some areas know when the lesson observation period will be and can prepare accordingly. The college observes and evaluates the performance of additional learning support staff and communications staff thoroughly. Lesson observations include key skills and tutorials

p.3

tutorials observed?

but the college does not analyse these grade outcomes and compare them with the overall observation profile. The college plans to increase the size of the moderation team and to improve its standardisation systems.

p.3

learners?

 The college takes learners’ views very seriously. Managers analyse the main outcomes of induction and exit questionnaires thoroughly and produce a detailed report and comprehensive action plan. The college ensures effective communication of outcomes by informing learner representatives, the student union and the marketing team. Learners value the opportunity to comment anonymously on matters of concern.

p.4

taken to improve key skills provision?

 The college has made significant developments in its management of key skills and has made a major investment in skills for life (SFL), key skills and basic skills. The number of staff in these areas has trebled since 2003 and key appointments include a vice principal responsible for the area and a new SFL operations manager. About one third of new front line staff has level 4 qualifications. All staff are graduates and are teacher trained. The college is a developmental centre for level 4 qualifications. The SFL policy and strategy are well established. The college has seen recent significant improvements in overall key skills success and retention rates.

p.4

identity, qualifications and criminal records checks?

 The college is taking reasonable steps to meet these requirements and has set deadlines for the completion of the checks. It is also taking appropriate steps to ensure that contractors and agencies comply with these requirements.

p.4

monitored and reviewed? Is the SAR accurate?

 The college has completed all the actions from the post-inspection plan. The new and simplified self-assessment process relates clearly to the common inspection framework and to the ECM aspects. Staff at all levels develop the SAR and managers and external consultants assure its quality and accuracy. The recent SAR monitoring process resulted in fewer, but more significant key strengths and areas for improvement. Support staff have moved from service level agreements to self- assessments of the quality of their provision to internal and external clients. This is relatively new and managers aim to refine the process and improve the accuracy of grading judgements.

p.5

monitored and reviewed? Is the SAR accurate?

information quoted is reproduced verbatim without adaptation, and the source and date of publication are stated. Inspection reports are available on the Ofsted website (www.ofsted.gov.uk).

p.5

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion