Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Social care monitoring visit

Children's home run by Cambian Childcare Limited in Hammersmith and Fulham

Inspected 27 May 2026 · URN SC035657

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Sam Saxby-Brown

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Cambian Childcare Limited

  • Inspection date verified

    27 May 2026

  • Inspectors verified

    Sam Saxby-Brown

  • Name on report verified

    SC035657

  • URN verified

    SC035657

Page 1 of 8
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−71Very criticalmore positive than 8% of reports of this type

Reads more critically than most reports of this type.

Praisesafeeffectiveeffectivelypositivecleardelay
Criticismharmat riskseriousconcernlimited

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings24w−33
  • What needs to improve611w−69

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
8
Words of findings
635
about usual (typical 566)
Reading level
Hard
Flesch 47, typical 46
Average sentence
17 words
Next steps
6
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 2%What needs to improve 42%About the inspection 57%

Full report text

Inspection report for children’s home - monitoring visit: SC035657 1 SC035657

p.1

Registered provider: Cambian Childcare Limited

p.1

Inspected under the social care common inspection framework

p.1

Information about this children’s home

This home is owned and operated by a private provider. It offers care for up to 7 children who may experience social or emotional difficulties.

p.1

Information about this children’s home

The manager registered with Ofsted in May 2026.

p.1

Information about this children’s home

No children were living at the home at the time of this visit.

p.1

This monitoring visit

This home was judged ‘inadequate’ at the full inspection on 9 and 10 September 2025. Serious concerns were identified relating to children’s safety and welfare and to the effectiveness of leaders and managers. Compliance notices were issued in respect of Regulations 12 and 13.

p.1

This monitoring visit

A monitoring visit was completed on 14 November 2025. The provider had not met the steps in the compliance notices. At the time, no children were living at the home. Ofsted imposed a condition on the home’s registration. This required the provider to notify Ofsted 3 months before it intends to move any children into the home.

p.1

This monitoring visit

On 13 March 2026, the provider notified Ofsted of its intention to reopen. This monitoring visit took place to ensure that the home is ready to open and that it can provide safe care for children.

p.1

This monitoring visit

The provider has complied with its conditions of registration, and no children have been living in the home.

p.1

This monitoring visit

Leaders have completed a full refurbishment of the home. It is an attractive and welcoming environment in which children can live. The home is well maintained, with no obvious damage or disrepair. Inspection report for children’s home - monitoring visit: SC035657 2 The interim manager is now permanent and has registered with Ofsted. They are supported by a qualified deputy manager and a responsible individual with significant experience.

p.1

This monitoring visit

Leaders at all levels show a clear commitment to improving the standard of care for children. They are open and reflective on the concerns identified previously. Leaders have strengthened the quality of management oversight in response.

p.2

This monitoring visit

The manager is driven and ambitious about what they want to achieve for children and staff. They have high expectations of their staff. They outline these in regular staff meetings and supervision. The manager is a strong advocate for children. They offer challenge to senior leaders where needed.

p.2

This monitoring visit

Most of the previous staff have been either redeployed or have left the organisation. Those remaining share the manager’s desire to make improvements. Leaders have given staff a high level of training and support. Staff have gained further experience and skills by working in other homes owned by the provider.

p.2

This monitoring visit

The manager has ensured the safe recruitment of new staff. They have led interviews of candidates to ensure they are a good fit for the home. The number of staff recruited aligns with plans to move children into the home in a gradual way.

p.2

This monitoring visit

The manager is aware of the need for staff to be qualified to the appropriate level. They have taken action to address this.

p.2

This monitoring visit

Leaders have taken positive steps toward addressing all of the requirements issued at the last inspection. The requirements issued in respect of Regulations 13 and 6 have been met.

p.2

This monitoring visit

As no children have been accommodated, leaders are unable to evidence that the requirements in respect of Regulations 12, 7, 40 and 36 have been met. As a result, these have been restated. Inspection report for children’s home - monitoring visit: SC035657 3

p.2

Inspection date Inspection type Inspection judgement

09/09/2025 Full Inadequate 15/01/2025 Full Good 05/12/2023 Full Good 06/09/2022 Full Good Inspection report for children’s home - monitoring visit: SC035657 4

p.3

Statutory requirements

This section sets out the actions that the registered person must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person must comply with the given timescales.

p.4

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.4

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.4

Requirement Due date

assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child;

p.4

Requirement Due date

have the skills to identify and act upon signs that a child is at risk of harm;

p.4

Requirement Due date

understand the roles and responsibilities in relation to protecting children that are assigned to them by the registered person;

p.4

Requirement Due date

take effective action whenever there is a serious concern about a child’s welfare; and

p.4

Requirement Due date

that the home’s day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm; and

p.4

Requirement Due date

that the effectiveness of the home’s child protection policies is monitored regularly. (Regulation 12 (1) (2)(a)(i)(iii)(v)(vi)(b)(e))

p.4

Requirement Due date

Specifically, the registered person must ensure that staff take action to safeguard children following incidents.

p.4

Requirement Due date

The registered person must ensure that children’s risk assessments give staff clear guidance to follow to safeguard children. 27 August 2026 Inspection report for children’s home - monitoring visit: SC035657 5 Additionally, the registered person must ensure that staff understand their roles and responsibilities to safeguard children, particularly regarding exploitation, substance misuse and being missing from the home.

p.4

Requirement Due date

The children’s views, wishes and feelings standard is that children receive care from staff who—

p.5

Requirement Due date

develop positive relationships with them;

p.5

Requirement Due date

take their views, wishes and feelings into account in relation to matters affecting the children’s care and welfare and their lives.

p.5

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.5

Requirement Due date

help each child to express views, wishes and feelings;

p.5

Requirement Due date

help each child to understand how the child’s views, wishes and feelings have been taken into account and give the child reasons for decisions in relation to the child;

p.5

Requirement Due date

make each child aware of and, if necessary, remind them of each of the matters in sub-paragraph (d)(i) to (iii); and

p.5

Requirement Due date

is enabled to provide feedback to, and raise issues with, a relevant person about the support and services that the child receives. (Regulation 7 (1)(a)(b)(c) (2)(a)(ii)(iii)(vii)(b)(i))

p.5

Requirement Due date

Specifically, the registered person must ensure that children who speak English as an additional language have regular opportunities to share their views, wishes and feelings and that they receive information about their care in their first language.

p.5

Requirement Due date

This requirement has been restated. 27 August 2026 Inspection report for children’s home - monitoring visit: SC035657 6 The registered person must notify HMCI and each other relevant person without delay if—

p.5

Requirement Due date

an incident requiring police involvement occurs in relation to a child which the registered person considers to be serious; and

p.6

Requirement Due date

there is any other incident relating to a child which the registered person considers to be serious. (Regulation 40 (4)(b)(e))

p.6

Requirement Due date

This requirement has been restated. 27 August 2026

p.6

Requirement Due date

The registered person must maintain records (“case records”) for each child which—

p.6

Requirement Due date

include the information and documents listed in Schedule 3 in relation to each child; and

p.6

Requirement Due date

are kept up to date. (Regulation 36 (1)(a)(b))

p.6

Requirement Due date

Specifically, the registered person must ensure that children’s plans are updated and contain relevant information.

p.6

Requirement Due date

In addition, the registered person must ensure that all records contain staff actions to monitor their welfare when children are absent from the home.

p.6

Requirement Due date

This requirement has been restated. 27 August 2026

p.6

Information about this inspection

The purpose of this visit was to monitor the action taken and the progress made by the children’s home since its last Ofsted inspection.

p.6

Information about this inspection

This inspection was carried out under the Care Standards Act 2000. Inspection report for children’s home - monitoring visit: SC035657 7

p.6

Children’s home details

Registered provider: Cambian Childcare Limited

p.7

Children’s home details

Registered provider address: Caretech, Parkview, 82 Oxford Road, Uxbridge UB8 1UX

p.7

Inspector

Sam Saxby-Brown, Social Care Regulatory Inspector Inspection report for children’s home - monitoring visit: SC035657 8 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection.

p.7

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.8

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.8

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.8

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion