Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Social care assurance visit

Children's Home run by Invigor Adolescent Care Limited in Manchester

Inspected 17 Feb 2026 · published 26 Mar 2026 · URN 2605180

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Kimmy Feeley

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Invigor Adolescent Care Limited

  • Inspection date verified

    17 Feb 2026

  • Inspectors verified

    Kimmy Feeley

  • Name on report verified

    2605180

  • URN verified

    2605180

Page 1 of 9
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−28Mixedmore positive than 43% of reports of this type

In line with other reports of this type.

Praisepositiveeffectivelyclearsafeeffectiveconsistentrobustconsistently
Criticismharmat riskconcernconcernslimitedserious

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings22w−33
  • What needs to improve953w−25

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
9
Words of findings
975
longer than usual (typical 479)
Reading level
Hard
Flesch 45, typical 47
Average sentence
19 words
Next steps
8
typical 4
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 1%What needs to improve 50%About the inspection 49%

Full report text

Assurance inspection report for children’s home: 2605180 1 Registered provider: Invigor Adolescent Care Limited

p.1

Inspected under the social care common inspection framework

p.1

Information about this children’s home

This home is operated by a private organisation and provides care for up to 3 children who may experience social and/or emotional difficulties.

p.1

Information about this children’s home

At the time of this inspection, there was no registered manager.

p.1

Information about this children’s home

There were 2 children living at the home at the time of this inspection.

p.1

Inspection date: 17 February 2026

Date of last inspection: 12 November 2025

p.1

Inspection date: 17 February 2026

Judgement at last inspection: requires improvement to be good

p.1

Inspection date: 17 February 2026

Enforcement action since last inspection: none

p.1

Information about this inspection

At this inspection, the inspector evaluated:

p.1

Information about this inspection

 the care of children  the safety of children  the effectiveness of leaders and managers. The inspector looked closely at the experiences and progress of children, using the social care common inspection framework. This assurance inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Assurance inspection report for children’s home: 2605180 2

p.1

Findings from the inspection

We identified the following serious and widespread concerns in relation to the care or protection of children at this assurance inspection:

p.2

Findings from the inspection

 Ineffective safeguarding practice that places children at risk of inadequate protection or significant harm  Instability in leadership and management  Poor placement decisions that do not meet children’s needs  Inconsistent staff practice  Weak allegation management processes  Poor home environment

p.2

Findings from the inspection

There has been no registered manager in post since May 2025, leaving the home without stable or consistent leadership. An interim manager has recently been appointed, however, the new monitoring systems he is introducing are still at a very early stage of development.

p.2

Findings from the inspection

Since the last inspection, 2 children have moved into the home. Leaders and managers did not thoroughly assess all known risks and behaviours before the children moved in. They did not demonstrate effective professional curiosity or ensure that placement decisions were well informed. This meant that the suitability of placements was not fully considered and these shortfalls contributed to the breakdown of one child’s placement.

p.2

Findings from the inspection

Staff hold regular reflective discussions with children following incidents, focusing on the events and the known associated risks. However, despite these conversations, the sessions are not having the intended impact, and the frequency of incidents has continued to increase.

p.2

Findings from the inspection

Staff lack the skills to identify and act effectively when there are signs that children are at risk of harm. Lapses in staff vigilance and inconsistent approaches to risk management have contributed to an escalation in serious incidents. As a result, children’s safety is compromised and their overall level of risk has increased.

p.2

Findings from the inspection

Weak and unclear boundaries, combined with inconsistent practice, mean that children do not receive the structure and routine they need. During the inspection, one child spent the entire day in bed, with little effort or encouragement from staff for them to take part in daily routines or activities. This lack of proactive engagement limits children’s opportunities to develop trust in staff and impacts on them forming positive, meaningful relationships.

p.2

Findings from the inspection

Leaders and managers failed to follow correct procedures for managing allegations. Concerns were not reported to the local authority designated officer or Ofsted within the required timescales, resulting in avoidable delays to safeguarding responses. When concerns about staff practice have been identified, investigations do not routinely take place. Consequently, leaders miss important opportunities to Assurance inspection report for children’s home: 2605180 3 safeguard children effectively and to strengthen the quality of care and experiences provided.

p.2

Findings from the inspection

Children have access to local health services and staff encourage and support children to attend their health appointments. This includes undertaking direct work to help prepare children and reduce any anxieties they may have. As a result, children are supported to improve their health and overall wellbeing.

p.3

Findings from the inspection

The home environment is not consistently well maintained and repairs are not completed in a timely manner. Damage such as broken window restrictors and a hole in the stairwell wall pose safety risks and do not provide children with a secure, safe and homely environment.

p.3

Inspection date Inspection type Inspection judgement

12/11/2025 Full Requires improvement to be good 23/07/2025 Full Inadequate 18/12/2024 Full Requires improvement to be good 27/09/2023 Full Good Assurance inspection report for children’s home: 2605180 4

p.3

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.

p.4

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.4

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.4

Requirement Due date

assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child;

p.4

Requirement Due date

have the skills to identify and act upon signs that a child is at risk of harm;

p.4

Requirement Due date

understand the roles and responsibilities in relation to protecting children that are assigned to them by the registered person;

p.4

Requirement Due date

take effective action whenever there is a serious concern about a child’s welfare;

p.4

Requirement Due date

are familiar with, and act in accordance with, the home’s child protection policies;

p.4

Requirement Due date

that the home’s day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm;

p.4

Requirement Due date

that the premises used for the purposes of the home are designed, furnished and maintained so as to protect each child from avoidable hazards to the child’s health. (Regulation 12 (1) (2)(a)(i)(iii)(v)(vi)(vii)(b))

p.4

Requirement Due date

In particular, the registered person must ensure that when children make allegations about staff, these are shared with 5 April 2026 Assurance inspection report for children’s home: 2605180 5 the appropriate agencies in a timely manner and there are clear processes to investigate and record any concerns about staff practice.

p.4

Requirement Due date

In particular, the registered person must ensure that significant incident records are reviewed thoughtfully and with professional curiosity, to identify learning and improve practice.

p.5

Requirement Due date

In particular, the registered person must ensure that children’s risk management plans include clear strategies to reduce risks and that staff remain vigilant and consistent in their approach to risk management.

p.5

Requirement Due date

In particular, the registered person must ensure that when window restrictors are in use, they are regularly checked to confirm that they are secure and have not been tampered with.

p.5

Requirement Due date

The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that—

p.5

Requirement Due date

helps children aspire to fulfil their potential; and

p.5

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.5

Requirement Due date

lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose;

p.5

Requirement Due date

ensure that staff have the experience, qualifications and skills to meet the needs of each child;

p.5

Requirement Due date

understand the impact that the quality of care provided in the home is having on the progress and experiences of each child and use this understanding to inform the development of the quality of care provided in the home;

p.5

Requirement Due date

use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1) (2)(a)(c)(f)(h)) 5 April 2026 Assurance inspection report for children’s home: 2605180 6 In particular, the registered person must ensure that all staff complete refresher training within timescales and remain up to date with all relevant training.

p.5

Requirement Due date

In particular, the registered person must ensure that they make better use of monitoring and review systems to support continual development and improvement in the care children receive. The care planning standard is that children—

p.6

Requirement Due date

receive effectively planned care in or through the children’s home; and

p.6

Requirement Due date

have a positive experience of arriving at or moving on from the home. (Regulation 14 (1)(a)(b))

p.6

Requirement Due date

In particular, the registered person must ensure that there are clear processes in place to ensure robust information- gathering is undertaken when considering any new placement.

p.6

Requirement Due date

Additionally, the registered person must ensure that the rationale for accepting any placement is clearly recorded, including detailed notes of discussions held with other professionals. 5 April 2026

p.6

Requirement Due date

The positive relationships standard is that children are helped to develop, and to benefit from, relationships based on—

p.6

Requirement Due date

an understanding about acceptable behaviour; and

p.6

Requirement Due date

positive responses to other children and adults.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.6

Requirement Due date

communicate to each child expectations about the child’s behaviour and ensure that the child understands those expectations in accordance with the child’s age and understanding. (Regulation 11 (1)(a)(b)(c) (2)(v))

p.6

Requirement Due date

In particular, the registered person must ensure that staff have the confidence and skills to implement appropriate 5 April 2026 Assurance inspection report for children’s home: 2605180 7 boundaries and expectations, to consistently promote children’s wellbeing.

p.6

Requirement Due date

The quality and purpose of care standard is that children receive care from staff who—

p.7

Requirement Due date

understand the children’s home’s overall aims and the outcomes it seeks to achieve for children;

p.7

Requirement Due date

use this understanding to deliver care that meets children’s needs and supports them to fulfil their potential.

p.7

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.7

Requirement Due date

ensure that the premises used for the purposes of the home are designed and furnished so as to—

p.7

Requirement Due date

enable each child to participate in the daily life of the home. (Regulation 6 (1)(a)(b) (2)(c)(i)(ii))

p.7

Requirement Due date

In particular, the registered person must ensure that the home environment is homely, clean and well cared for and any damage is repaired as quickly as possible. 5 April 2026

p.7

Requirement Due date

The registered person must notify HMCI and each other relevant person without delay if—

p.7

Requirement Due date

there is an allegation of abuse against the home or a person working there;

p.7

Requirement Due date

there is any other incident relating to a child which the registered person considers to be serious. (Regulation 40 (c)(e)) 5 April 2026 Assurance inspection report for children’s home: 2605180 8

p.7

Children’s home details

Registered provider: Invigor Adolescent Care Limited

p.8

Children’s home details

Registered provider address: Warren Bruce Court, Warren Bruce Road, Trafford Park, Manchester M17 1LB

p.8

Inspector

Kimmy Feeley, Social Care Inspector Assurance inspection report for children’s home: 2605180 9 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.

p.8

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk .

p.9

Inspector

You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.9

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.9

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.9

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion