Social care · Social care assurance visit
Children's home run by Pathways Care Group Limited
Summary
What we read, and from where
Click a reading to see it highlighted in the report.
- Group verified
Pathways Care Group Limited
- Inspection date verified
19 Aug 2025
- Inspectors verified
Sarah Cooper
- Name on report verified
1241897
- URN verified
1241897
Deep dive
What this report says
In plain English
Join free to get a short, plain-English summary of any report.
Tone of the report
How positive or critical the inspectors' language is, from the words they chose. No AI involved.
In line with other reports of this type.
How the report reads, start to finish
Every paragraph in order, sized by length. Tap one to see it on the page.
Strengths
Quoted from the report. Tap to see it on the page.
No standout praise found.
Concerns
Quoted from the report. Tap to see it on the page.
No strong criticism found.
Next steps
Quoted from the report. Tap to see it on the page.
- The measures of control, discipline and restraint may be used in relation to children in the home p.7
- The registered person must notify HMCI and each other relevant person without delay if— p.7
- The registered person must give notice in writing to HMCI, as soon as it is reasonably practicable to do so, if any of the following events take place or are expected by the registered person to take place— p.7
- The registered person should ensure that the children’s home is a nurturing and supportive environment that meets the needs of the children. p.8
- In particular, the registered person should prevent doors from slamming shut and ensure repairs to the home are completed promptly. p.8
- Plans to revamp the home to continue at an appropriate pace. p.8
What the report dwells on
Topics by how often they come up, coloured by how they are described. Open one for an example.
Anatomy of the report
How the report is built, against others of the same type and grade.
- Pages
- 10
- Words of findings
- 916
- longer than usual (typical 479)
- Reading level
- Fairly hard
- Flesch 55, typical 47
- Average sentence
- 17 words
- Next steps
- 6
- typical 4
- Hedged sentences
- 0%
- “some”, “not always”, “most”…
Where the words go
Full report text
Assurance inspection report for children’s home: 1241897 1 Registered provider: Pathways Care Group Limited
p.1
Inspected under the social care common inspection framework
p.1
Information about this children’s home
This privately owned home provides care for up to five children with social, emotional and/or mental health difficulties. At the time of the visit, three children were living at the home.
p.1
Information about this children’s home
The registered manager left in June 2025. An interim manager was appointed in January 2025.
p.1
Information about this children’s home
Judgement at last inspection: requires improvement to be good
p.1
Information about this children’s home
Enforcement action since last inspection: none
p.1
Information about this inspection
At this inspection, the inspector evaluated:
p.1
Information about this inspection
the care of children the safety of children the effectiveness of leaders and managers. The inspector has looked closely at the experiences and progress of children, using the social care common inspection framework. This assurance inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Assurance inspection report for children’s home: 1241897 2
p.1
Findings from the inspection
We identified the following serious and widespread concerns in relation to the care or protection of children at this assurance inspection:
p.2
Findings from the inspection
There are significant shortfalls in the safety and protection of children, and the children’s welfare is not being promoted. Leaders and managers have failed to make effective arrangements to safeguard children.
p.2
Findings from the inspection
Since the last inspection, one child has moved into the home. Two children were spoken with during the inspection.
p.2
Findings from the inspection
Leaders and managers have failed to ensure that staffing ratios are adequate to meet the needs of the children. Children have been left alone and restricted to one side of the house. Staff cannot meet the children’s needs or supervise them safely.
p.2
Findings from the inspection
Children’s plans advise that they need structure and a routine. As children have been unable to use parts of the home, activities have been restricted. The children are bored and unstimulated.
p.2
Findings from the inspection
Leaders and managers have used an environmental restraint to manage a child’s behaviour. This has not had the appropriate assessment or legal consent. These restrictions have prevented children from accessing the kitchen. One child has been distressed by this. Following an incident when staff refused a child access to the kitchen, an incident followed, and the child required hospital treatment.
p.2
Findings from the inspection
Safeguarding concerns are not always reported. When incidents have been reported to the local authority designated officer (LADO), the actions set by the LADO have not been followed through. Leaders and managers have failed to take necessary actions following staff using unrecognised physical interventions. Staff have remained working with children following allegations. This has exposed children to potential harm and gives them the message that their concerns are not valid.
p.2
Findings from the inspection
The house is next to a busy road. The front gate has a large gap between the gate and the fence that the child climbs up. There has been no attempt to minimise this risk by adapting the gate. The gate is guarded by staff when the child spends time in the garden. This issue has not been identified as a significant concern by leaders and managers.
p.2
Findings from the inspection
Police have raised concerns about the home. They said that the communication with the home has reduced. The staff do not always report incidents as required. Staff said that the managers advised them not to report incidents to the police. This means that the staff and children have not accessed necessary support when it was required. Assurance inspection report for children’s home: 1241897 3 There is a divide between staff and senior leaders. Staff do not feel supported or have the appropriate guidance to keep children safe. The turnover of staff is high. Staff are working long hours, often without a break. There is a high use of agency staff. Agency staff have walked out on night shifts as they were not happy with the running of the shift.
p.2
Findings from the inspection
Leaders and managers have failed to ensure that there is effective oversight regarding staff practice and incidents at the home. While the manager was on leave, there was no management oversight at the home. Important records, such as records of physical intervention and allegations, were not reviewed.
p.3
Findings from the inspection
The requirements from the previous inspection were not reviewed at this visit. Therefore, these will be reviewed at the next inspection. Assurance inspection report for children’s home: 1241897 4
p.3
Inspection date Inspection type Inspection judgement
24/06/2025 Full Requires improvement to be good 04/06/2024 Full Good 03/04/2023 Full Good 05/05/2022 Full Good Assurance inspection report for children’s home: 1241897 5
p.4
Statutory requirements
This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.
p.5
Requirement Due date
*The protection of children standard is that children are protected from harm and enabled to keep themselves safe.
p.5
Requirement Due date
In particular, the standard in paragraph (1) requires the registered person to ensure—
p.5
Requirement Due date
assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child;
p.5
Requirement Due date
help each child to understand how to keep safe;
p.5
Requirement Due date
manage relationships between children to prevent them from harming each other;
p.5
Requirement Due date
understand the roles and responsibilities in relation to protecting children that are assigned to them by the registered person;
p.5
Requirement Due date
take effective action whenever there is a serious concern about a child’s welfare; and
p.5
Requirement Due date
that the home’s day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm;
p.5
Requirement Due date
that the premises used for the purposes of the home are designed, furnished and maintained so as to protect each child from avoidable hazards to the child’s health. (Regulation 12 (1) (2)(a)(i)(ii)(iv)(v)(vi)(b)(d)) 22 Sep 2025
p.5
Requirement Due date
*The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that— 22 Sep 2025 Assurance inspection report for children’s home: 1241897 6 helps children aspire to fulfil their potential; and
p.5
Requirement Due date
In particular, the standard in paragraph (1) requires the registered person to—
p.6
Requirement Due date
lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose;
p.6
Requirement Due date
ensure that staff work as a team where appropriate;
p.6
Requirement Due date
ensure that staff have the experience, qualifications and skills to meet the needs of each child;
p.6
Requirement Due date
ensure that the home has sufficient staff to provide care for each child;
p.6
Requirement Due date
ensure that the home’s workforce provides continuity of care to each child;
p.6
Requirement Due date
understand the impact that the quality of care provided in the home is having on the progress and experiences of each child and use this understanding to inform the development of the quality of care provided in the home;
p.6
Requirement Due date
demonstrate that practice in the home is informed and improved by taking into account and acting on—
p.6
Requirement Due date
feedback on the experiences of children, including complaints received; and
p.6
Requirement Due date
use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1)(a)(b) (2)(a)(b)(c)(d)(e)(f)(g)(ii)(h))
p.6
Requirement Due date
*Restraint in relation to a child is only permitted for the purpose of preventing—
p.6
Requirement Due date
injury to any person (including the child);
p.6
Requirement Due date
serious damage to the property of any person (including the child);
p.6
Requirement Due date
restraint in relation to a child must be necessary and proportionate. (Regulation 20 (1)(a)(b) (2)) 22 Sep 2025 Assurance inspection report for children’s home: 1241897 7 The registered person must prepare and implement a policy ("the behaviour management policy") which sets out—
p.6
Requirement Due date
The measures of control, discipline and restraint may be used in relation to children in the home
p.7
Requirement Due date
within 24 hours of the use of a measure of control, discipline or restraint in relation to a child in the home, a record is made which includes—
p.7
Requirement Due date
the date, time and location of the use of the measure;
p.7
Requirement Due date
the name of the person who used the measure ("the user"), and of any other person present when the measure was used;
p.7
Requirement Due date
within 48 hours of the use of the measure, the registered person, or a person who is authorised by the registered person to do so ("the authorised person")—
p.7
Requirement Due date
has spoken to the user about the measure; and
p.7
Requirement Due date
has signed the record to confirm it is accurate; and
p.7
Requirement Due date
within 5 days of the use of the measure, the registered person or the authorised person adds to the record confirmation that they have spoken to the child about the measure. (Regulation 35 (1)(b) (3)(a)(iii)(vi)(b)(i)(ii)(c)) 22 Sep 2025
p.7
Requirement Due date
The registered person must notify HMCI and each other relevant person without delay if—
p.7
Requirement Due date
there is an allegation of abuse against the home or a person working there; and
p.7
Requirement Due date
there is any other incident relating to a child which the registered person considers to be serious. (Regulation 40 (4)(c)(e)) 25 Sep 2025
p.7
Requirement Due date
The registered person must give notice in writing to HMCI, as soon as it is reasonably practicable to do so, if any of the following events take place or are expected by the registered person to take place—
p.7
Requirement Due date
a person other than the registered person carries on or manages the children’s home; 25 Sep 2025 Assurance inspection report for children’s home: 1241897 8 a person ceases to carry on or manage the home. (Regulation 49 (a)(b))
p.7
Requirement Due date
*These requirements are subject to a compliance notice.
p.8
Recommendation
The registered person should ensure that the children’s home is a nurturing and supportive environment that meets the needs of the children. It should be homely. In particular, the registered person should prevent doors from slamming shut and ensure repairs to the home are completed promptly. Plans to revamp the home to continue at an appropriate pace. (‘Guide to the Children’s Homes Regulations, including the quality standards’, page 15, paragraph 3.9) Assurance inspection report for children’s home: 1241897 9
p.8
Children’s home details
Registered provider: Pathways Care Group Limited
p.9
Children’s home details
Registered provider address: Pathways Care Group, Minton Place, Victoria Street, Windsor SL4 1EG
p.9
Inspector
Sarah Cooper, Social Care Inspector Assurance inspection report for children’s home: 1241897 10 regulates and inspects to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked-after children, safeguarding and child protection.
p.9
Inspector
If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk .
p.10
Inspector
You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .
p.10
Inspector
Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .
p.10
Inspector
T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted
p.10
Discuss this inspection
Members compare notes on inspectors and inspections here. Join free to read and post.
Join the discussion