Social care · Social care assurance visit
Children's Home, Residential special school run by Kisimul Group Limited in Lincolnshire
Summary
Zoey Lee (lead), Lizette Watts, Thirza Smith
What we read, and from where
Click a reading to see it highlighted in the report.
- Group verified
Kisimul Group Limited
- Inspection date verified
6 Mar 2025
- Inspectors verified
Lizette Watts, Thirza Smith, Zoey Lee
- Name on report verified
SC044562
- URN verified
SC044562
Deep dive
What this report says
In plain English
Join free to get a short, plain-English summary of any report.
Tone of the report
How positive or critical the inspectors' language is, from the words they chose. No AI involved.
In line with other reports of this type.
How the report reads, start to finish
Every paragraph in order, sized by length. Tap one to see it on the page.
Strengths
Quoted from the report. Tap to see it on the page.
No standout praise found.
Concerns
Quoted from the report. Tap to see it on the page.
No strong criticism found.
Next steps
Quoted from the report. Tap to see it on the page.
- This specifically relates to ensuring that staff always know the whereabouts of each child. p.5
- There must be clear communication in the team when a staff member needs to leave an area so that everyone knows they are responsible for supervising and caring for the child. 7 April 2025 p.5
- The registered person should have systems in place so that all staff receive supervision of their practice from an appropriately qualified and experienced professional, which allows them to reflect on their practice and the needs of the children assigned to their care. p.5
Anatomy of the report
How the report is built, against others of the same type and grade.
- Pages
- 7
- Words of findings
- 258
- shorter than usual (typical 479)
- Reading level
- Hard
- Flesch 48, typical 47
- Average sentence
- 18 words
- Next steps
- 3
- typical 4
- Hedged sentences
- 0%
- “some”, “not always”, “most”…
Where the words go
Full report text
Assurance inspection report for children’s home: SC044562 1 SC044562
p.1
Registered provider: Kisimul Group Limited
p.1
Inspected under the social care common inspection framework
p.1
Information about this children’s home
This service is privately owned and is registered as a children’s home and a residential special school.
p.1
Information about this children’s home
The inspectors only inspected the social care provision. At the time of this inspection, the home was providing care for 29 disabled children.
p.1
Information about this children’s home
The manager is registered with Ofsted and is suitably experienced and qualified.
p.1
Inspection date: 6 March 2025
Judgement at last inspection: requires improvement to be good
p.1
Inspection date: 6 March 2025
Enforcement action since last inspection: none
p.1
Information about this inspection
At this inspection, the inspectors evaluated:
p.1
Information about this inspection
the care of children the safety of children the effectiveness of leaders and managers. Inspectors have looked closely at the experiences and progress of children, using the social care common inspection framework. This assurance inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Assurance inspection report for children’s home: SC044562 2
p.1
Findings from the inspection
We did not identify any serious or widespread concerns in relation to the care or protection of children at this assurance inspection.
p.2
Findings from the inspection
Children live in a warm, homely and inviting environment. Children have been supported to further personalise their bedrooms to reflect their preferences and interests. This demonstrates that children’s views and wishes are valued and acted on. Large photos of group activities are among the canvases that are now displayed in the corridors, giving a homely feel to the communal areas.
p.2
Findings from the inspection
Staff receive safeguarding training alongside specific training in relation to children’s individual needs. The registered manager and service manager have identified a gap in training and have acted swiftly to arrange specific training to meet individual children’s needs. The manager has also carried out a training analysis for the team and is consulting with night staff to ensure that training is more accessible for shift workers.
p.2
Findings from the inspection
Staff have a good understanding of the specific risks associated with each child. Risk assessments have been streamlined, offering clear and consistent guidance. Plans and assessments are regularly reviewed, updated, and shared with the team. As a result, staff have clear direction during incidents and established plans to follow.
p.2
Findings from the inspection
With a view to minimising the use of floor holds, leaders and managers have modified the model of restraint to make it the least restrictive. Physical intervention is only used when necessary to protect the children or those around them. Such interventions are proportionate to the situation. All incidents are thoroughly recorded, reviewed and monitored by the manager. Importantly, the child’s perspective is sought, and staff revisit these discussions to ensure that the child’s voice is heard.
p.2
Findings from the inspection
The manager regularly reflects on the care provided to children and is keen to implement changes where areas for improvement are identified. Leaders and managers have used various tools to gather feedback from staff to drive ongoing improvements in the home. As a result, changes have already been made to shift patterns to include a handover period for staff. While this will take time to fully embed, it is expected to improve communication and consistency.
p.2
Findings from the inspection
Managers oversee the correct staffing levels for children. Recent changes have been made in the teams to ensure that skills and experience are equally distributed, with a designated deputy manager in each area of the home to provide increased direction and oversight. Despite efforts to improve staff vigilance, two incidents were being reviewed at the time of this inspection. Therefore, further work is required in this area. Assurance inspection report for children’s home: SC044562 3 In general, staff receive regular supervision. However, new employees do not have additional opportunities for supervision to support their transition to the organisation. The quality of supervision records varies. Some provide detailed accounts that thoroughly cover all agenda items, offering good support to staff. However, others lack depth; while they acknowledge each agenda item, they fail to explore staff practices in detail. As a result, valuable opportunities are missed to
p.2
Findings from the inspection
There has been positive progress in managing peer-on-peer incidents, with fewer occurrences and improved handling when they do arise. Meetings are held with the team around the child, particularly when there is concern about the stability of the child’s placement. This proactive approach helps in addressing any underlying issues early on and ensures that everyone involved is aligned with the best course of action for the child’s well-being. Assurance inspection report for children’s home: SC044562 4
p.3
Inspection date Inspection type Inspection judgement
13/08/2024 Full Requires improvement to be good 06/06/2023 Full Good 23/11/2022 Full Good 09/06/2021 Full Good Assurance inspection report for children’s home: SC044562 5
p.4
Statutory requirements
This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.
p.5
Requirement Due date
The protection of children standard is that children are protected from harm and enabled to keep themselves safe.
p.5
Requirement Due date
In particular, the standard in paragraph (1) requires the registered person to ensure—
p.5
Requirement Due date
understand the roles and responsibilities in relation to protecting children that are assigned to them by the registered person;
p.5
Requirement Due date
that the home’s day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm. (Regulation 12 (1) (2)(a)(v)(b))
p.5
Requirement Due date
This specifically relates to ensuring that staff always know the whereabouts of each child. There must be clear communication in the team when a staff member needs to leave an area so that everyone knows they are responsible for supervising and caring for the child. 7 April 2025
p.5
Recommendation
The registered person should have systems in place so that all staff receive supervision of their practice from an appropriately qualified and experienced professional, which allows them to reflect on their practice and the needs of the children assigned to their care. (‘Guide to the Children’s Homes Regulations, including the quality standards’, page 61, paragraph 13.2) Assurance inspection report for children’s home: SC044562 6
p.5
Children’s home details
Provision sub-type: Residential special school
p.6
Children’s home details
Registered provider: Kisimul Group Limited
p.6
Children’s home details
Registered provider address: The Old Vicarage, High Street, Swinderby, Lincoln LN6 9LU
p.6
Inspectors
Zoey Lee, Social Care Inspector Thirza Smith, Social Care Inspector Lizette Watts, Social Care Inspector Assurance inspection report for children’s home: SC044562 7 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.
p.6
Inspectors
If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk .
p.7
Inspectors
You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .
p.7
Inspectors
Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .
p.7
Inspectors
T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted
p.7
Discuss this inspection
Members compare notes on inspectors and inspections here. Join free to read and post.
Join the discussion