Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Aspris Children’s Services Limited in Herefordshire

Inspected 7 Nov 2023 · published 21 Dec 2023 · URN SC402406

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

RI to be good

Stacie Sharpe

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Aspris Children’s Services Limited

  • Inspection date verified

    7 Nov 2023

  • Inspectors verified

    Stacie Sharpe

  • Helped and protected verified

    Requires improvement to be good

  • Leadership and management verified

    Requires improvement to be good

  • Overall effectiveness verified

    Requires improvement to be good

  • Name on report verified

    SC402406

  • URN verified

    SC402406

Page 1 of 12
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Grade profile

Hollow rings show the previous inspection, 2022.

  • OverallRI to be good
  • Helped and protectedRI to be good
  • Leadership and managementRI to be good

13% of comparable inspections in the last three years were graded Requires improvement to be good (12,716 inspections).

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−40Criticalmore positive than 33% of reports of this type graded Requires improvement to be good
OutstandingGoodRIInadequate

In line with other reports of this type graded Requires improvement to be good.

Markers show where typical reports of each grade sit.

Praisepositivefailuresengagingeffectiveskilledpositivelysafeimproved
Criticismseriousinconsistentfailedrequires improvementunsafenot alwaysnot consistentlyconcern

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1148w−40
  • What needs to improve936w−33

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
12
Words of findings
2,065
about usual (typical 1899)
Reading level
Fairly hard
Flesch 52, typical 50
Average sentence
16 words
Next steps
8
typical 8
Hedged sentences
4%
“some”, “not always”, “most”…

Where the words go

Findings 47%What needs to improve 39%About the inspection 14%

Full report text

Inspection report for children’s home: SC402406 1 SC402406 Registered provider: Aspris Children’s Services Limited Full inspection Inspected under the social care common inspection framework

p.1

Information about this children’s home

The home provides care for three children up to the age of 18 years who experience social and emotional difficulties.

p.1

Information about this children’s home

The registered manager post has been vacant since 11 May 2023.

p.1

Overall experiences and progress of

children and young people, taking into account

p.1

requires improvement to be good

How well children and young people are helped and protected requires improvement to be good

p.1

requires improvement to be good

The effectiveness of leaders and managers requires improvement to be good

p.1

requires improvement to be good

The children’s home is not yet delivering good help and care for children and young people. However, there are no serious or widespread failures that result in their welfare not being safeguarded or promoted.

p.1

requires improvement to be good

Date of last inspection: 18 October 2022

p.1

requires improvement to be good

Overall judgement at last inspection: good

p.1

requires improvement to be good

Enforcement action since last inspection: none Inspection report for children’s home: SC402406 2

p.1

Inspection date Inspection type Inspection judgement

18/10/2022 Full Good 19/10/2021 Full Good 05/02/2020 Full Good 11/07/2018 Full Good Inspection report for children’s home: SC402406 3

p.2

improvement to be good

No children have moved in to or out of the home since the last inspection. However, one child has been spending a considerable amount of time with their family and has not returned to the home for several weeks. During the inspection, it was confirmed that the child would be moving to semi-independent accommodation and would not be returning to the home.

p.3

improvement to be good

The progress that children make is variable. One child is making progress with their personal care and social skills, and now takes care of their personal hygiene without being prompted. This is helped by the trusted relationships that the child is building with staff. However, one child has not made the expected progress in relation to their independence skills. Furthermore, the staff do not always capture in the records or through monitoring the progress that children make.

p.3

improvement to be good

Staff support children to attend education. One child is engaging well and is benefiting from a programme of agriculturally based learning that is better suited to their learning needs. Another child struggled to settle into college and decided to end the placement. This reduces the scope for the child’s continued learning.

p.3

improvement to be good

The children have individualised care plans. Staff offer children some encouragement to be involved in the development and review of their plans. However, this is not far reaching enough. Consequently, children remain reluctant to contribute. This limits opportunities for children to set personal goals and understand their progress. In addition, staff do not consider all aspects of the children’s care when evaluating children’s progress and the effectiveness of the care delivered.

p.3

improvement to be good

There have been no children’s meetings since May 2023. This reduces the opportunities for children to express their wishes and feelings about the care that they receive, or to make suggestions for improvement.

p.3

improvement to be good

Children’s bedrooms are personalised to their individual tastes. However, there are areas of the home that require improvement. For example, the home has not had mains heating or hot water for almost three weeks. Alternative arrangements are in place to ensure that heating and hot water are available. In addition, some areas of the home were observed to be cluttered, and an old mattress was seen at the side of the annex. Shortfalls in the physical environment detract from children living in a comfortable and well-equipped environment that easily supports their day-to-day living. Inspection report for children’s home: SC402406 4

p.3

improvement to be good

The children have individual risk assessments and risk management plans that are reviewed and updated regularly. Staff understand and respond well to risk. For example, staff acted quickly when one child went missing, and completed direct work with the child following the incident. This helped to raise the child’s awareness of the risks of going missing. However, staff do not consistently undertake work with children to help them to understand risk. For example, it is unclear how the staff helped one child to understand the risk of unprotected sex.

p.4

improvement to be good

There have been very few incidents and no use of physical intervention. However, one child has received a high number of sanctions. Managers have reviewed this and identified that some sanctions were not proportionate. Since the new manager has been in post, a more-balanced approach has been adopted and more rewards are being used to encourage positive behaviour.

p.4

improvement to be good

Bullying between children has been a concern, and staff have completed work with the children to try to address this. However, meaningful work has not been completed with the children to help them to rebuild their relationships.

p.4

improvement to be good

The approach to rules and boundaries is inconsistent. Staff work in sub-teams and this contributes to children receiving inconsistent responses in relation to the expectations for behaviour. Inconsistent messages have the potential to make children feel unsafe. The manager has started to address this.

p.4

improvement to be good

Following the identification of a serious medication error by the previous manager, action has been taken to improve the system for the administration of medication. The new system is effective and there have been no further errors. Furthermore, all staff revisited their medication training to help to improve their vigilance.

p.4

good

The interim manager is suitably skilled and experienced and has been in post for several weeks. She has recently shared with her manager that she is unable to register as planned. However, she is staying in the post until a permanent manager is recruited. This creates further instability for children as she is the third manager that has been in post this year. Despite this, she has quickly identified shortfalls and is implementing the changes needed to improve children’s care.

p.4

good

The manager has prioritised building positive relationships with the children, their families and the professionals involved in their care. The manager offers good professional challenge and advocacy when children are not getting the support and resources that they need. Professionals are positive about the communication with staff. Inspection report for children’s home: SC402406 5 The manager has identified that monitoring systems have failed to identify some shortfalls in the care provided to children. She is working hard to improve monitoring systems, including the oversight and evaluation of children’s records.

p.4

good

Despite the changes in management arrangements, staff have received regular supervision and their appraisals are up to date. In addition, staff have completed mandatory training and training that is specific to children’s needs.

p.5

good

There are plans for this home to close and for the child and the staff to move to a new home that is undergoing renovation. Changes in the manager and uncertainty about the timescales for the move have contributed to low staff morale and staff feeling in ‘limbo’. Despite this, the staff speak positively about the current manager and report feeling supported.

p.5

good

The manager has failed to appropriately report significant events to Ofsted. In addition, Ofsted has not been provided with an updated statement of purpose to reflect changes to the management arrangements. Shortfalls in communication with the regulator reduce the external oversight of the operation of the home.

p.5

good

Ofsted has been told that there has been a change in the responsible individual. The provider intends to make an official notification. Inspection report for children’s home: SC402406 6

p.5

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.

p.6

Requirement Due date

The quality and purpose of care standard is that children receive care from staff who—

p.6

Requirement Due date

understand the children’s home’s overall aims and the outcomes it seeks to achieve for children;

p.6

Requirement Due date

use this understanding to deliver care that meets children’s needs and supports them to fulfil their potential.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.6

Requirement Due date

help each child to develop resilience and skills that prepare the child to return home, to live in a new placement or to live independently as an adult;

p.6

Requirement Due date

provide to children living in the home the physical necessities they need in order to live there comfortably. (Regulation 6 (1)(a)(b) (2)(b)(vi)(vii))

p.6

Requirement Due date

In particular, the registered person must ensure that children are ready for independence, and have access to mains heating and hot water. 1 December 2023

p.6

Requirement Due date

The children’s views, wishes and feelings standard is that children receive care from staff who—

p.6

Requirement Due date

take their views, wishes and feelings into account in relation to matters affecting the children’s care and welfare and their lives.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.6

Requirement Due date

ensure that staff— 1 December 2023 Inspection report for children’s home: SC402406 7 help each child to express views, wishes and feelings;

p.6

Requirement Due date

help each child to understand how the child’s views, wishes and feelings have been taken into account and give the child reasons for decisions in relation to the child;

p.7

Requirement Due date

regularly consult children, and seek their feedback, about the quality of the home’s care. (Regulation 7 (1) (c)(2)(a)(ii)(iii)(iv))

p.7

Requirement Due date

In particular, the registered person must ensure that children are encouraged and enabled to share their opinions and feedback and that these are acted on.

p.7

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.7

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.7

Requirement Due date

help each child to understand how to keep safe;

p.7

Requirement Due date

manage relationships between children to prevent them from harming each other. (Regulation 12 (1) (2)(a)(i)(ii)(iv))

p.7

Requirement Due date

This specifically relates to ensuring that children are supported to understand risk, and any bullying is actively addressed. 1 December 2023

p.7

Requirement Due date

The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s that—

p.7

Requirement Due date

helps children aspire to fulfil their potential; and

p.7

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.7

Requirement Due date

lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose; 1 December 2023 Inspection report for children’s home: SC402406 8 ensure that staff work as a team where appropriate;

p.7

Requirement Due date

ensure that staff have the experience, qualifications and skills to meet the needs of each child;

p.8

Requirement Due date

understand the impact that the quality of care provided in the home is having on the progress and experiences of each child and use this understanding to inform the development of the quality of care provided in the home;

p.8

Requirement Due date

demonstrate that practice in the home is informed and improved by taking into account and acting on—

p.8

Requirement Due date

research and developments in relation to the ways in which the needs of children are best met; and

p.8

Requirement Due date

use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1)(a)(b) (2)(a)(b)(c)(f)(g)(i)(h))

p.8

Requirement Due date

This specifically relates to the manager creating a positive culture in the home that is focused on children’s progress. This also relates to ensuring that there is management oversight of all aspects of the operation of the home.

p.8

Requirement Due date

The care planning standard is that children—

p.8

Requirement Due date

receive effectively planned care in or through the children’s home; and

p.8

Requirement Due date

have a positive experience of arriving at or moving on from the home.

p.8

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.8

Requirement Due date

that staff help each child to access and contribute to the records kept by the registered person in relation to the child. (Regulation 14 (1)(a)(b) (2)(f))

p.8

Requirement Due date

In particular, the registered person must ensure that children contribute to their care plans. 1 December 2023

p.8

Requirement Due date

The registered person must compile in relation to the children’s home a statement ("the statement of purpose") which covers the matters listed in Schedule 1.

p.8

Requirement Due date

The registered person must— 1 December 2023 Inspection report for children’s home: SC402406 9 keep the statement of purpose under review and, where appropriate, revise it; and

p.8

Requirement Due date

notify HMCI of any revisions and send HMCI a copy of the revised statement within 28 days of the revision. (Regulation 16 (1) (3)(a)(b))

p.9

Requirement Due date

In particular, the registered person must ensure that the statement of purpose is reviewed, updated and sent to Ofsted.

p.9

Requirement Due date

The registered person must maintain records ("case records") for each child which—

p.9

Requirement Due date

include the information and documents listed in Schedule 3 in relation to each child;

p.9

Requirement Due date

are signed and dated by the author of each entry. (Regulation 36 (1)(a)(b)(c))

p.9

Requirement Due date

This specifically relates to ensuring that children’s paperwork is up to date, and all documents created are signed and dated. 1 December 2023

p.9

Requirement Due date

The registered person must notify HMCI and each other relevant person without delay—

p.9

Requirement Due date

If there is any other incident relating to a child which the registered person considers to be serious. (Regulation 40 (4)(e))

p.9

Requirement Due date

In particular, the registered person must ensure that they notify Ofsted of any serious concerns relating to a child. 10 November

p.9

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people, using the social care common inspection framework. This inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with The Children’s Homes (England) Inspection report for children’s home: SC402406 10 Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Inspection report for children’s home: SC402406 11

p.9

Children’s home details

Registered provider: Aspris Children’s Services Limited

p.11

Children’s home details

Registered provider address: Aspris, The Forge, 43 Church Street West, Woking, Surrey GU21 6HT

p.11

Inspector

Stacie Sharpe, Social Care Inspector Inspection report for children’s home: SC402406 12 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection.

p.11

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.12

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.12

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.12

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion