Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Cambian Childcare Limited in Derbyshire

Inspected 2 Aug 2023 · published 16 Sept 2023 · URN SC476289

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

RI to be good

Lizette Watts (lead), Helen Gronhaug

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Cambian Childcare Limited

  • Inspection date verified

    2 Aug 2023

  • Inspectors verified

    Helen Gronhaug, Lizette Watts

  • Helped and protected verified

    Requires improvement to be good

  • Leadership and management verified

    Requires improvement to be good

  • Overall effectiveness verified

    Requires improvement to be good

  • Name on report verified

    SC476289

  • URN verified

    SC476289

Page 1 of 9
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Grade profile

Hollow rings show the previous inspection, 2022.

  • OverallRI to be good
  • Helped and protectedRI to be good
  • Leadership and managementRI to be good

13% of comparable inspections in the last three years were graded Requires improvement to be good (12,716 inspections).

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−46Criticalmore positive than 21% of reports of this type graded Requires improvement to be good
OutstandingGoodRIInadequate

In line with other reports of this type graded Requires improvement to be good.

Markers show where typical reports of each grade sit.

Praiseenjoypositivesafeseriousfailureseffectivelysupportiveconfident
Criticismnot yetnot alwaysrequires improvementnot consistentlylacklimitedweaknessesconcerns

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1238w−55
  • What needs to improve341w+33

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
9
Words of findings
1,550
about usual (typical 1899)
Reading level
Fairly hard
Flesch 53, typical 50
Average sentence
14 words
Next steps
6
typical 8
Hedged sentences
9%
“some”, “not always”, “most”…

Where the words go

Findings 65%What needs to improve 18%About the inspection 18%

Full report text

Inspection report for children’s home: SC476289 1 SC476289 Registered provider: Cambian Childcare Limited Full inspection Inspected under the social care common inspection framework

p.1

Information about this children’s home

The home is privately owned and provides care for up to four children who may have social and emotional needs.

p.1

Information about this children’s home

Three children were being cared for at the point of inspection.

p.1

Overall experiences and progress of

children and young people, taking into account

p.1

requires improvement to be good

How well children and young people are helped and protected requires improvement to be good

p.1

requires improvement to be good

The effectiveness of leaders and managers requires improvement to be good

p.1

requires improvement to be good

The children’s home is not yet delivering good help and care for children and young people. However, there are no serious or widespread failures that result in their welfare not being safeguarded or promoted.

p.1

requires improvement to be good

Overall judgement at last inspection: requires improvement to be good

p.1

requires improvement to be good

Enforcement action since last inspection: none Inspection report for children’s home: SC476289 2

p.1

Inspection date Inspection type Inspection judgement

04/10/2022 Full Requires improvement to be good 16/11/2021 Full Good 07/01/2020 Interim Sustained effectiveness 20/08/2019 Full Requires improvement to be good Inspection report for children’s home: SC476289 3

p.2

improvement to be good

The children live in a large, comfortable home where they have access to an enclosed garden. The children enjoy using the trampoline and large pool. They have lots of fun spending time with staff in the garden. The children’s bedrooms are decorated to a high standard. Before the bedrooms were decorated, staff spent time with the children exploring how they wanted their rooms to look. The children’s choices were listened to, and now their bedrooms reflect their personalities and current interests.

p.3

improvement to be good

The progress that children are making in relation to their education is variable. Two children attend school on a full-time basis. Another child has a bespoke timetable of education being delivered in school and at home. While staff recognise the importance of education and attempt to deliver education in the home, the child’s participation in this is limited.

p.3

improvement to be good

Staff work hard to provide routines and boundaries for children. However, at times, staff do not work together, which means that responses to children are not always consistent. This leaves children not knowing what to expect from staff. When they feel this way, their behaviours can escalate.

p.3

improvement to be good

Staff plan regular focused discussions with children. However, staff rarely follow the planner, nor do they coordinate with their colleagues. Instead, staff undertake sessions of their choice with the children. Therefore, opportunities for child-specific discussions are being missed, and children’s identified needs are not consistently being supported. Consequently, one child found these discussions repetitive and no longer wishes to engage.

p.3

improvement to be good

The children have recently been on holiday together, which they all enjoyed. Staff planned activities for all the children, taking into account their ages and what they are interested in. Generally, the two younger children, who have similar needs, did activities together, and the older child chose to do something else. All children’s choices were accommodated. This led to all children having a nice time.

p.3

improvement to be good

Staff are not always equipped with the necessary information to protect children and keep them safe. This is because although children’s risk assessments are up to date, staff are not consistently reading them. This presents a risk because staff are not taking children’s current risk-taking behaviours into consideration when planning care for children.

p.3

improvement to be good

There have been some recent incidents where one child was missing from the Inspection report for children’s home: SC476289 4 home. When the child was missing, staff worked closely with external agencies to facilitate the safe return of the child. The child was welcomed back into the home, and staff explored the reasons why the child went missing. This is good practice.

p.3

improvement to be good

There have been some allegations made against staff. When these have been made, the manager has been proactive in their response, and there has been good collaboration with external agencies. However, the manager has not always fully understood the wider implications of safeguarding processes. For example, a member of staff was on shift yet was unaware that a safeguarding issue had been made about them. The manager had not communicated effectively or taken the necessary action to safeguard children. This lack of management action led to children and staff being placed in vulnerable situations with the potential for further allegations.

p.4

improvement to be good

Physical interventions by staff are used as a last resort, and the interventions are minimal. Afterwards, children are given the opportunity to explore their feelings and worries. Staff receive a management debrief, and their role in the intervention is reflected on. The de-escalation attempts are not yet well recorded. Therefore, it is unclear how well staff can use de-escalation strategies with children.

p.4

improvement to be good

Staff understand online risks for children. Children enjoy accessing online material through the home’s TV and computer. Younger children are supported by staff to find what they want to watch. The older child has regular checks of their phone. When concerns have arisen, staff have taken necessary action to safeguard the child.

p.4

good

Staff and children have experienced a period of change and challenge. Although an acting manager is in role, they are not yet registered with Ofsted. The previous manager remains working for the company. This manager is supporting the acting manager through their induction period. The changes in management have led to some staff being confused about who they should escalate information to.

p.4

good

The staff team has experienced some changes, and there are several staff vacancies. Although some new staff have started, core staff are needed to complete extra shifts. This has been necessary to ensure that the correct staffing ratios are maintained. When staff have left, the children have felt the impact of relationships ending with staff. This has caused an element of sadness for one child who has experienced this loss.

p.4

good

The acting manager does not yet have established systems in place to support their quality assurance of the home. Management oversight of staff’s understanding of key documents is not yet effective. Key documents are stored in different places, and this can cause staff to be confused about which form is the most current and what they need to refer to. This can be frustrating for staff. Equally, staff are not Inspection report for children’s home: SC476289 5 equipped with the current knowledge required to meet the needs of the children effectively.

p.4

good

The previous manager had taken steps to address the requirements and recommendations following preceding inspections. Managers have striven to improve communication among the staff group. For example, managers have led training sessions on various topics. However, these measures have not yet achieved the required impact. There continues to be a lack of consistency regarding communication within the staff group and with other professionals. Feedback from external agencies has confirmed this too.

p.5

good

The leadership team has a clear vision for the home. It wants to secure good outcomes for children. However, these aspirations are yet to be realised. Feedback from professionals and records suggest that some staff do not always understand children’s behaviour in accordance with their past trauma and individual circumstances. Managers have provided learning opportunities to explore staff’s use of language; however, this remains a work in progress.

p.5

good

Staff describe the acting manager as supportive and approachable. In turn, staff want to support the acting manager in her new role. Staff say they are confident to express their views and opinions with managers. This is done through regular team meetings.

p.5

good

The leadership team has begun auditing within the home. Alongside this, a peer review has been completed regarding the quality of staff supervision. The acting manager is implementing systems to gain a better understanding of the strengths and weaknesses of the service. This process is ongoing. Inspection report for children’s home: SC476289 6

p.5

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.

p.6

Requirement Due date

The positive relationships standard is that children are helped to develop, and to benefit from, relationships based on—

p.6

Requirement Due date

an understanding about acceptable behaviour; and

p.6

Requirement Due date

positive responses to other children and adults.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.6

Requirement Due date

meet each child’s behavioural and emotional needs, as set out in the child’s relevant plans;

p.6

Requirement Due date

communicate to each child expectations about the child’s behaviour and ensure that the child understands those expectations in accordance with the child’s age and understanding;

p.6

Requirement Due date

are provided with supervision and support to enable them to understand and manage their own feelings and responses to the behaviour and emotions of children, and to help children to do the same. (Regulation 11 (1)(a)(b)(c) (2)(a)(i)(v)(x))

p.6

Requirement Due date

This particularly relates to staff being consistent when addressing children’s behaviour. Staff supervision should further reflect on children’s care. Staff should provide care for children as outlined in the statement of purpose. 2 October 2023

p.6

Requirement Due date

The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that—

p.6

Requirement Due date

helps children aspire to fulfil their potential; and 2 October 2023 Inspection report for children’s home: SC476289 7 promotes their welfare.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.7

Requirement Due date

ensure that the home has sufficient staff to provide care for each child. (Regulation 13 (1)(a)(b) (2)(d))

p.7

Requirement Due date

This specifically refers to safe staffing levels being in place for children. This is dependent on the risks that children present with at any given time.

p.7

Recommendation

 The registered person should ensure that staff record information in a non- stigmatising way and in a way that will be helpful to the children. (‘Guide to the Children’s Homes Regulations, including the quality standards’, page 62, paragraph 14.4)

p.7

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people, using the social care common inspection framework. This inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with The Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Inspection report for children’s home: SC476289 8

p.7

Children’s home details

Registered provider: Cambian Childcare Limited

p.8

Children’s home details

Registered provider address: Metropolitan House, 3 Darkes Lane, Potters Bar EN6 1AG

p.8

Inspectors

Lizette Watts, Social Care Inspector Helen Gronhaug, Social Care Inspector Inspection report for children’s home: SC476289 9 and inspects to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection.

p.8

Inspectors

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.9

Inspectors

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.9

Inspectors

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.9

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion