Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Sunderland Care and Support Limited in Sunderland

Inspected 21 Jun 2022 · published 9 Aug 2022 · URN 1183826

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

RI to be good

Paula Shepherd

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Sunderland Care And Support Limited

  • Inspection date verified

    21 Jun 2022

  • Inspectors verified

    Paula Shepherd

  • Helped and protected verified

    Requires improvement to be good

  • Leadership and management verified

    Requires improvement to be good

  • Overall effectiveness verified

    Requires improvement to be good

  • Name on report verified

    1183826

  • URN verified

    1183826

Page 1 of 11
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Grade profile

Hollow rings show the previous inspection, 2022.

  • OverallRI to be good
  • Helped and protectedRI to be good
  • Leadership and managementRI to be good

13% of comparable inspections in the last three years were graded Requires improvement to be good (12,716 inspections).

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−47Criticalmore positive than 19% of reports of this type graded Requires improvement to be good
OutstandingGoodRIInadequate

In line with other reports of this type graded Requires improvement to be good.

Markers show where typical reports of each grade sit.

Praiseenjoypositivegood progresssafefailuresimprovedeffectivelypromptly
Criticismseriousrequires improvementnot alwaysharmrisk of harmvariablefailureat risk

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1213w−35
  • What needs to improve813w−73

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
11
Words of findings
2,000
about usual (typical 1899)
Reading level
Fairly hard
Flesch 51, typical 50
Average sentence
17 words
Next steps
8
typical 8
Hedged sentences
10%
“some”, “not always”, “most”…

Where the words go

Findings 51%What needs to improve 34%About the inspection 16%

Full report text

Inspection report for children’s home: 1183826 1 Registered provider: Sunderland Care And Support Limited Full inspection Inspected under the social care common inspection framework

p.1

Information about this children’s home

This home is owned and managed by a private provider. The home provides care for up to seven children under short-break arrangements and one named child for an extended period.

p.1

Information about this children’s home

There is one child currently living in the home. Two children were on short-break stays during the inspection. The inspector was able to observe interactions with all three children.

p.1

Information about this children’s home

The manager registered with Ofsted in October 2018

p.1

Overall experiences and progress of

children and young people, taking into account

p.1

requires improvement to be good

How well children and young people are helped and protected requires improvement to be good

p.1

requires improvement to be good

The effectiveness of leaders and managers requires improvement to be good

p.1

requires improvement to be good

The children’s home is not yet delivering good help and care for children and young people. However, there are no serious or widespread failures that result in their welfare not being safeguarded or promoted.

p.1

requires improvement to be good

Date of last inspection: 8 February 2022

p.1

requires improvement to be good

Overall judgement at last inspection: requires improvement to be good

p.1

requires improvement to be good

Enforcement action since last inspection: none Inspection report for children’s home: 1183826 2

p.1

Inspection date Inspection type Inspection judgement

08/02/2022 Full Requires improvement to be good 03/09/2019 Full Good 27/11/2018 Full Good 10/10/2017 Full Good Inspection report for children’s home: 1183826 3

p.2

improvement to be good

Children enjoy their short-break stays and have built trusted relationships with the staff. Feedback received from parents and professionals is positive. However, the progress that the children make is variable. While the child that is living in the home is making good progress, the progress and experiences of other children remain less clear.

p.3

improvement to be good

Pictures of the children participating in activities with the staff adorn the walls of the home alongside colourful noticeboards. However, the home is looking tired and worn in places, and previously raised shortfalls of the garden being overgrown and in need of some attention remain. A cupboard door containing sharp tools was left unlocked while children were in the home. This was immediately locked when brought to the manager’s attention; however, it could have resulted in a significant injury if one of the children had accessed this cupboard.

p.3

improvement to be good

Previously identified shortfalls regarding the setting of targets remain. Not all children have relevant and specific targets in place and, for some children, they are significantly out of date. The monitoring by the staff of these targets, and the recording of when children achieve their targets, is also variable. This means that not all children are consistently helped and supported to achieve their targets during their short-break stays.

p.3

improvement to be good

When complaints are made, the manager responds to them promptly. While there are clear actions taken forward from each complaint, the manager does not formally respond to the complainant informing them of the outcome. This does not give the complainant the opportunity to express their opinion on the outcome of the complaint.

p.3

improvement to be good

Children enjoy a range of home-based activities with the staff that meet their individual needs and interests. Staff take the children on outings in the community. This provides the children with opportunities to socialise in their wider community and to broaden their experiences.

p.3

improvement to be good

Staff use a range of forums, including young people’s meetings and one-to-one sessions, to listen to the children’s views. Staff are proactive in responding to requests. They include purchasing specific toys, booking tickets for events, and developing a graffiti wall at the children’s request to showcase their achievements. This provides the children with the knowledge that their views are important and that the staff are keen to listen to what they have to say.

p.3

improvement to be good

Children are safe living in this home, and are cared for by staff who know them well and understand their complex needs. For the children that are non-verbal, the staff Inspection report for children’s home: 1183826 4 recognise their individual methods of communication including facial expressions and what these mean. Staff then respond accordingly to meet the children’s needs. The positive relationships between the staff and the children have resulted in minimal physical interventions required, no missing from care incidents, and no sanctions.

p.3

improvement to be good

The physical intervention log has been revised following previous shortfalls being identified. However, as there have been no holds used in the home since the last inspection, the effectiveness of the document cannot be evaluated. Therefore, the requirement has been restated.

p.4

improvement to be good

Progress has been made on the quality of some documents, including the children’s risk assessments and ‘All About Me Care Plans’. However, this is not consistent for all children. Some documents contain conflicting information, some have out-of-date information, and one child’s risk assessment does not contain all the known risks. This means that the staff do not have the most up-to-date information when providing care for the children.

p.4

improvement to be good

Work has been undertaken to improve the quality of the impact risk assessments that the manager completes prior to children coming into the home. However, the most recent impact risk assessment completed does not include a manager’s evaluation of the impact of the risks, or a decision on whether the home can meet the child’s needs. This means that shortfalls remain in the matching process.

p.4

improvement to be good

Recording of accidents is not consistent. There is an accident log in place; however, the registered manager was not assured of the accuracy of the document. Accident reports are not always on file, which means that the manager does not know whether they have been responded to appropriately.

p.4

improvement to be good

Some children’s files continue to lack the required information. This includes up-to- date personal education plans, education and health care plans, children’s health assessments, and cared for review minutes. This affects the quality of information that the staff have available to meet the children’s needs. This was raised at the last inspection, but has not been effectively addressed.

p.4

good

The home is managed by a suitable, qualified and experienced manager. She is supported by two deputy managers. Significant staffing issues remain, which is having a considerable impact on the ability of the manager to provide short-break stays and to welcome new children into the home. These staffing pressures mean that the management team regularly covers shifts on the rota, which affects the quality of management oversight and the pace of the improvement work.

p.4

good

The supervision template has been revised and the quality of supervision has improved. However, the frequency of supervision does not always take place in accordance with the statement of purpose. This means that the staff are not provided with consistent opportunities to reflect on their practice. Inspection report for children’s home: 1183826 5 Staff have completed the provider’s mandatory training courses and those specific to the individual needs of the children. However, the training matrix is not up to date. Some staff have completed training that is not recorded, and the recorded frequency of other training is not correct. This shortfall makes it difficult for the manager to effectively monitor the staff’s training and development needs.

p.4

good

There continues to be shortfalls in notifying Ofsted of serious incidents. There is sometimes a delay in notifying and some incidents are not notified at all. This means that Ofsted is unable to review the information to ensure that the provider has taken appropriate action to keep children safe. This leaves children vulnerable to the risk of harm.

p.5

good

The most recent statement of purpose has not been forwarded to Ofsted within the required timescales. This means that parents, Ofsted and other professionals do not have the correct information to scrutinise to ensure that children are cared for in line with the statement of purpose.

p.5

good

A failure to meet the previously issued requirements under regulations 12, 13, 16, 35 and 40 demonstrates shortfalls relating to the leadership and management of the home. Inspection report for children’s home: 1183826 6

p.5

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.

p.6

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.6

Requirement Due date

assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child; and

p.6

Requirement Due date

that the premises used for the purposes of the home are designed, furnished and maintained so as to protect each child from avoidable hazards to the child’s health. (Regulation 12 (1) (2)(a)(i)(d))

p.6

Requirement Due date

This specifically relates to risk assessments and impact risk assessments. 21 July 2022

p.6

Requirement Due date

The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that—

p.6

Requirement Due date

helps children aspire to fulfil their potential; and

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.6

Requirement Due date

lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose;

p.6

Requirement Due date

ensure that the home has sufficient staff to provide care for each child; 21 July 2022 Inspection report for children’s home: 1183826 7 and use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1)(a)(b) (2)(a)(d)(h))

p.6

Requirement Due date

The registered person must compile in relation to the children’s home a statement ("the statement of purpose") which covers the matters listed in Schedule 1.

p.7

Requirement Due date

keep the statement of purpose under review and, where appropriate, revise it; and

p.7

Requirement Due date

notify HMCI of any revisions and send HMCI a copy of the revised statement within 28 days of the revision. (Regulation 16 (1) (3)(a)(b)) 21 July 2022

p.7

Requirement Due date

The registered person must prepare and implement a policy ("the behaviour management policy") which sets out—

p.7

Requirement Due date

how appropriate behaviour is to be promoted in the children’s home; and the measures of control, discipline and restraint which may be used in relation to children in the home.

p.7

Requirement Due date

The registered person must keep the behaviour management policy under review and, where appropriate, revise it.

p.7

Requirement Due date

within 48 hours of the use of the measure, the registered person, or a person who is authorised by the registered person to do so ("the authorised person")—

p.7

Requirement Due date

has spoken to the user about the measure; and

p.7

Requirement Due date

has signed the record to confirm it is accurate; and

p.7

Requirement Due date

within 5 days of the use of the measure, the registered person or the authorised person adds to the record confirmation that they have spoken to the child about the measure. (Regulation 35 (1)(a)(b) (2) (3)(b)(i)(ii)(c))

p.7

Requirement Due date

This specifically relates to physical intervention records. 21 July 2022

p.7

Requirement Due date

The registered person must maintain records ("case records") for each child which— 21 July 2022 Inspection report for children’s home: 1183826 8 include the information and documents listed in Schedule 3 in relation to each child; and

p.7

Requirement Due date

are kept up to date. (Regulation 36 (1)(a)(b))

p.8

Requirement Due date

This specifically relates to looked after children’s documents being on file and the accident log, children’s baselines, targets and care plans being kept updated.

p.8

Requirement Due date

The registered person must notify HMCI and each other relevant person without delay if—

p.8

Requirement Due date

a child is involved in or subject to, or is suspected of being involved in or subject to, sexual exploitation;

p.8

Requirement Due date

an incident requiring police involvement occurs in relation to a child which the registered person considers to be serious;

p.8

Requirement Due date

there is an allegation of abuse against the home or a person working there;

p.8

Requirement Due date

a child protection enquiry involving a child —

p.8

Requirement Due date

concludes (in which case, the notification must include the outcome of the child protection enquiry); or

p.8

Requirement Due date

there is any other incident relating to a child which the registered person considers to be serious. (Regulation 40 (4)(a)(b)(c)(d)(i)(ii)(e)) 21 July 2022

p.8

Recommendations

 The registered person should ensure that the children, and other complainants, are informed in writing of the outcome of any complaints they make. (‘Guide to the Children’s Homes Regulations, including the quality standards,’ page 22, paragraph 4.13)  The registered person should ensure that training records are kept up to date and staff receive training specific to the individual needs of the children. (‘Guide to the Children’s Homes Regulations, including the quality standards,’ page 53, paragraph 10.8)  The registered person should ensure that systems are in place so that all staff, including the manager, receive regular supervision so that they can reflect on their practice and the needs of the children assigned to their care. (‘Guide to the Children’s Homes Regulations, including the quality standards,’ page 61, paragraph 13.2) Inspection report for children’s home: 1183826 9

p.8

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people, using the social care common inspection framework.’ This inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with the Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. Inspection report for children’s home: 1183826 10

p.9

Children’s home details

Registered provider: Sunderland Care And Support Limited

p.10

Children’s home details

Registered provider address: Civic Centre, Burdon Road, Sunderland, Tyne & Wear SR2 7DN

p.10

Inspector

Paula Shepherd, Social Care Inspector Inspection report for children’s home: 1183826 11 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.

p.10

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.11

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.11

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.11

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion