Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Social care monitoring visit

Children's Home run by Cambian Childcare Limited in Dorset

Inspected 7 Jun 2022 · published 12 Jul 2022 · URN 1159868

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Justine Hosking

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Cambian Childcare Limited

  • Inspection date verified

    7 Jun 2022

  • Inspectors verified

    Justine Hosking

  • Name on report verified

    1159868

  • URN verified

    1159868

Page 1 of 10
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−33Criticalmore positive than 44% of reports of this type

In line with other reports of this type.

Praiseeffectivelysafeseriouseffectiveconsistentrobust
Criticismharmat riskconcernlimited

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings23w−33
  • What needs to improve986w−29

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
10
Words of findings
1,009
longer than usual (typical 566)
Reading level
Fairly hard
Flesch 51, typical 46
Average sentence
17 words
Next steps
8
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 1%What needs to improve 58%About the inspection 41%

Full report text

Inspection report for children's home - monitoring visit: 1159868 1 Registered provider: Cambian Childcare Limited

p.1

Inspected under the social care common inspection framework

p.1

Information about this children’s home

This children’s home provides care for up to three children who may have social, emotional and behavioural difficulties. At the time of the inspection, there were two children living at the home and a third child had recently left.

p.1

Information about this children’s home

A manager is in post but has not swiftly submitted a complete application to register with Ofsted as required.

p.1

This monitoring visit

This visit was undertaken to review the progress of the home since the full inspection in April 2022, when the home was judged inadequate. Two compliance notices were issued relating to leadership and the quality of care. Sufficient action has been taken to address the points on the two compliance notices, however, the progress identified has yet to be embedded and all requirements remain in place to be reviewed at the next full inspection.

p.1

This monitoring visit

There are two children living in the home; a third child moved out at the end of May. Staff keep in daily contact with this child. The manager has contacted the local authority to propose that a staff member provides mentoring support to the child as he reaches young adulthood.

p.1

This monitoring visit

There have been no new safeguarding incidents or episodes of children going missing since the third child left the home. There is no plan to introduce any other child at the current time, to allow the remaining children to settle. Inspection report for children's home - monitoring visit: 1159868 2 Leaders and the manager have put in place an action plan to address the requirements. While processes have been put in place, it is too early to test the full effectiveness of the plan and how it helps the children in the home.

p.1

This monitoring visit

Progress is being made, which is likely to be sustainable due to the way it is implemented by leaders and the manager. For example, the manager has reviewed the children’s care plans to reflect best practice from other children’s homes. Staff supervision has been adapted to meet the manager and staff’s learning and working style. The manager is comfortable to take ownership of each part of the action plan to make the necessary changes within the home. The staff team is stable and willing to work together to improve outcomes for the children.

p.2

This monitoring visit

Ofsted will continue to monitor the home’s progress. An additional full inspection will be carried out within 16 weeks of the last full inspection. Inspection report for children's home - monitoring visit: 1159868 3

p.2

Inspection date Inspection type Inspection judgement

27/04/2022 Full Inadequate 06/07/2021 Full Requires improvement to be good 20/04/2021 Full Inadequate 05/12/2019 Interim Sustained effectiveness Inspection report for children's home - monitoring visit: 1159868 4

p.3

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, Children’s Homes (England) Regulations 2015 and the ‘Guide to the Children’s Homes Regulations, including the quality standards’. The registered person(s) must comply within the given timescales.

p.4

Requirement Due date

The quality and purpose of care standard is that children receive care from staff who—

p.4

Requirement Due date

understand the children’s home’s overall aims and the outcomes it seeks to achieve for children;

p.4

Requirement Due date

use this understanding to deliver care that meets children’s needs and supports them to fulfil their potential.

p.4

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.4

Requirement Due date

understand and apply the home’s statement of purpose;

p.4

Requirement Due date

understand and apply the home’s statement of purpose;

p.4

Requirement Due date

protect and promote each child’s welfare;

p.4

Requirement Due date

treat each child with dignity and respect;

p.4

Requirement Due date

provide personalised care that meets each child’s needs, as recorded in the child’s relevant plans, taking account of the child’s background;

p.4

Requirement Due date

help each child to develop resilience and skills that prepare the child to return home, to live in a new placement or to live independently as an adult;

p.4

Requirement Due date

provide to children living in the home the physical necessities they need in order to live there comfortably;

p.4

Requirement Due date

provide to children personal items that are appropriate for their age and understanding; and

p.4

Requirement Due date

make decisions about the day-to-day arrangements for each child, in accordance with the child’s relevant plans, which 3 June 2022 Inspection report for children's home - monitoring visit: 1159868 5 give the child an appropriate degree of freedom and choice; and

p.4

Requirement Due date

ensure that the premises used for the purposes of the home are designed and furnished so as to—

p.5

Requirement Due date

enable each child to participate in the daily life of the home. (Regulation 6 (1)(a)(b) (2)(a)(b)(i)(ii)(iii)(iv)(vi)(vii)(viii)(ix)(c)(i)(ii))

p.5

Requirement Due date

In particular, ensure that children are provided with the appropriate level of care and guidance to prepare them safely for independence. Also, ensure that the home environment is made comfortable and reflects the children who live there.

p.5

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.5

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.5

Requirement Due date

assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child;

p.5

Requirement Due date

help each child to understand how to keep safe;

p.5

Requirement Due date

have the skills to identify and act upon signs that a child is at risk of harm;

p.5

Requirement Due date

understand the roles and responsibilities in relation to protecting children that are assigned to them by the registered person;

p.5

Requirement Due date

take effective action whenever there is a serious concern about a child’s welfare; and

p.5

Requirement Due date

are familiar with, and act in accordance with, the home’s child protection policies; and 3 June 2022 Inspection report for children's home - monitoring visit: 1159868 6 that the home’s day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm. (Regulation 12 (1) (2)(a)(i)(ii)(iii)(v)(vi)(vii)(b))

p.5

Requirement Due date

In particular, ensure that protocols are followed in response to episodes of children going missing, that staff show professional curiosity and that learning informs future responses.

p.6

Requirement Due date

The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that—

p.6

Requirement Due date

helps children aspire to fulfil their potential; and

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.6

Requirement Due date

lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose;

p.6

Requirement Due date

ensure that staff work as a team where appropriate;

p.6

Requirement Due date

ensure that staff have the experience, qualifications and skills to meet the needs of each child;

p.6

Requirement Due date

ensure that the home’s workforce provides continuity of care to each child; and

p.6

Requirement Due date

use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1)(a)(b) (2)(a)(b)(c)(e)(h))

p.6

Requirement Due date

In particular, ensure robust management oversight of practice in the home, to improve children’s experiences. Also, ensure staff receive debriefs and opportunities for reflection so learning can be applied. 3 June 2022

p.6

Requirement Due date

The care planning standard is that children—

p.6

Requirement Due date

receive effectively planned care in or through the children’s home. 3 June 2022 Inspection report for children's home - monitoring visit: 1159868 7 In particular, the standard in paragraph (1) requires the registered person to ensure—

p.6

Requirement Due date

manage and review the placement of each child in the home; and

p.7

Requirement Due date

plan for, and help, each child to prepare to leave the home or to move into adult care in a way that is consistent with arrangements agreed with the child’s placing authority;

p.7

Requirement Due date

that each child’s relevant plans are followed;

p.7

Requirement Due date

that staff help each child to access and contribute to the records kept by the registered person in relation to the child. (Regulation 14 (1)(a) (2)(b)(ii) and (iii)(c)(f))

p.7

Requirement Due date

In particular, ensure that children’s records contain sufficient detail for staff to follow and to support children according to their individual plans. Also, ensure children are supported to move from the home to independence in a well-timed and structured way.

p.7

Requirement Due date

After consultation with the fire and rescue authority, the registered person must—

p.7

Requirement Due date

take adequate precautions against the risk of fire, including the provision of suitable fire equipment in the children’s home. (Regulation 25 (1)(a))

p.7

Requirement Due date

In particular, ensure that risks assessments are reviewed in light of potential smoking in the house. 3 June 2022

p.7

Requirement Due date

The education standard is that children make measurable progress towards achieving their educational potential and are helped to do so.

p.7

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.7

Requirement Due date

that staff help each child who is above compulsory school age to participate in further education, training or employment and to prepare for future care, education or employment. (Regulation 8 (1) (2)(a)(ix)) 3 June 2022 Inspection report for children's home - monitoring visit: 1159868 8

p.7

Information about this inspection

The purpose of this visit was to monitor the action taken and the progress made by the children’s home since its last Ofsted inspection.

p.8

Information about this inspection

This inspection was carried out under the Care Standards Act 2000. Inspection report for children's home - monitoring visit: 1159868 9

p.8

Children’s home details

Registered provider: Cambian Childcare Limited

p.9

Children’s home details

Registered provider address: Metropolitan House, 3 Darkes Lane, Potters Bar EN6 1AG

p.9

Children’s home details

Responsible individual: Nicola McClements

p.9

Inspector

Justine Hosking, Social Care Inspector Inspection report for children's home - monitoring visit: 1159868 10 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.

p.9

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.10

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.10

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.10

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion