Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Sandcastle Care Limited in Lancashire

Inspected 20 May 2021 · published 24 Jun 2021 · URN 1223681

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

RI to be good

Charlie Bamber

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Sandcastle Care Ltd

  • Inspection date verified

    20 May 2021

  • Inspectors verified

    Charlie Bamber

  • Helped and protected verified

    Requires improvement to be good

  • Leadership and management verified

    Requires improvement to be good

  • Overall effectiveness verified

    Requires improvement to be good

  • Name on report verified

    1223681

  • URN verified

    1223681

Page 1 of 9
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Grade profile

Hollow rings show the previous inspection, 2019.

  • OverallRI to be good
  • Helped and protectedRI to be good
  • Leadership and managementRI to be good

13% of comparable inspections in the last three years were graded Requires improvement to be good (12,716 inspections).

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−22Mixedmore positive than 65% of reports of this type graded Requires improvement to be good
OutstandingGoodRIInadequate

In line with other reports of this type graded Requires improvement to be good.

Markers show where typical reports of each grade sit.

Praisepositivesafeoutstandinggood progressfailuresengagingsuccessfulimproved
Criticismat riskharmrequires improvementconcernsunsafenot clearineffectivenot positive

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1253w−25
  • What needs to improve293w0

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
9
Words of findings
1,527
about usual (typical 1899)
Reading level
Fairly hard
Flesch 59, typical 50
Average sentence
14 words
Next steps
4
typical 8
Hedged sentences
7%
“some”, “not always”, “most”…

Where the words go

Findings 65%What needs to improve 15%About the inspection 19%

Full report text

Inspection report children's home: 1223681 1 Registered provider: Sandcastle Care Ltd Full inspection Inspected under the social care common inspection framework

p.1

Information about this children's home

This home provides care for up to four children of the same gender (female). The manager has been in post since January 2021.

p.1

Information about this children's home

Due to COVID-19 (coronavirus), at the request of the secretary of state, we suspended all routine inspections of social care providers on 17 March 2020.

p.1

Information about this children's home

We last visited this setting on 2 December 2020 to carry out an assurance visit. The report is published on our website.

p.1

Overall experiences and progress of

children and young people, taking into account

p.1

requires improvement to be good

How well children and young people are helped and protected requires improvement to be good

p.1

requires improvement to be good

The effectiveness of leaders and managers requires improvement to be good

p.1

requires improvement to be good

The children's home is not yet delivering good help and care for children and young people. However, there are no serious or widespread failures that result in their welfare not being safeguarded or promoted.

p.1

requires improvement to be good

Overall judgement at last inspection: Outstanding

p.1

requires improvement to be good

Enforcement action since last inspection: none Inspection report children's home: 1223681 2

p.1

Inspection date Inspection type Inspection judgement

08/10/2019 Full Outstanding 04/12/2018 Full Good 06/03/2018 Interim Improved effectiveness 08/05/2017 Full Good Inspection report children's home: 1223681 3

p.2

improvement to be good

Children are not currently having a positive experience living at this home. All four children were spoken to as part of this inspection. They all shared concerns about their day-to-day life in the home. They said that they often did not have positive relationships with each other. This was causing them to feel anxious and unhappy sometimes.

p.3

improvement to be good

Children can, at times, have a negative influence upon each other. There have been occasions when they have conspired together to go missing from the home. They can also be negative and hurtful towards each other. This causes them distress.

p.3

improvement to be good

The home has been damaged by children on several occasions. This has occurred during incidents when children’s behaviour has been destructive. Staff have been unable to prevent them from pulling light fittings down and causing damage to the walls. One child’s bedroom had two large holes in the wall. The home does not currently provide a homely environment. Some children reported that it did not feel like a home to them.

p.3

improvement to be good

Children reported that there was always ‘drama’ in the home. There had been an increase in the number of incidents. These left children feeling unsettled and wanting other children to leave the home.

p.3

improvement to be good

All children at this home smoke cigarettes. One child started smoking while living at the home and another’s smoking has increased. None of the children are engaging in smoking cessation support despite this being offered. This does not show that children are helped to make changes resulting in positive health and lifestyle choices.

p.3

improvement to be good

Two children have had successful transitions out of the home. They have had planned moves into semi-independent accommodation. They had a good experience of living at the home and progressed well.

p.3

improvement to be good

Staff support children to attend education. Children who were not in education prior to coming to live at the home now attend. One child returned to education on a reduced timetable which is now increasing. Children’s life chances are improved as a result of their engagement in education.

p.3

improvement to be good

Social workers and one parent spoken to as part of this inspection gave positive feedback. They said that good progress had been made in some areas and that children had positive relationships with staff.

p.3

improvement to be good

Children have also made progress in reducing their self-harm. This is due to the positive relationships they have with staff. They feel able to trust and confide in Inspection report children's home: 1223681 4 them. Children engage with the home’s therapist and benefit from the therapeutic support she offers.

p.3

improvement to be good

One child has progressed well in developing independence skills and now has several skills that will help her live independently as an adult.

p.4

improvement to be good

Although there are concerns about the children’s current impact on each other, matching considerations are detailed and well thought through. Managers have made the decision to reduce the number of children in the home down to three. This is because they feel that matching a fourth child into the home always results in difficult relationship dynamics. It is pleasing that managers have recognised this and intend to take action to reduce the likelihood of similar difficulties in the future.

p.4

improvement to be good

A serious safeguarding incident has occurred which put all children at risk of harm. All four children took a class A drug which was supplied by one or two of them to the others. Drug use is a known risk for one child, but actions taken to mitigate against this were ineffective on this occasion. Staff acted appropriately to support children once they were aware of their drug use.

p.4

improvement to be good

Risks for one child are escalating due to negative peer influence. She is involved in regular heightened incidents in the home and is also putting herself at risk of harm in the community. She has become criminalised due to unsafe behaviours in the community. Staff have not been able to keep her safe.

p.4

improvement to be good

Relationships between children are a cause for concern. Staff reported that children do not feel safe and have been intimidated by others. Children reported that others in the home sent them threatening messages over social media. Children also reported that they were directed by staff to remain in their bedrooms while staff attempted to manage incidents of heightened behaviour. This does not promote an environment where children feel, and are, safe.

p.4

improvement to be good

Staff are familiar with children’s risks and understand what they should do to manage and mitigate those risks. When children go missing, staff follow their missing from home protocols.

p.4

improvement to be good

The risk of self-harm has reduced for some children. Although they stated that sometimes they felt like harming themselves, they had strategies in place to manage these feelings, and felt that staff were a good source of support.

p.4

improvement to be good

Staff understand contextual safeguarding and how external factors have an impact on children’s safety. One member of staff has taken a lead and trained others in this area. Peer mapping has also been introduced so that staff have better understanding of children’s peers and the influence they may have on their safety. Inspection report children's home: 1223681 5 Safe recruitment practice ensures that all staff employed to work with children are safe and suitable to do so.

p.4

good

Managers have developed good relationships with external professionals and with children’s families. This helps to ensure that every aspect of children’s care, safety and welfare is considered.

p.5

good

Managers have acted on the requirements made at the home’s assurance visit, and these requirements are now met.

p.5

good

The home’s records are generally in good order, although a few shortfalls were identified. One child’s healthcare plan and placement plan did not contain important information relating to medication. Tracking the number of incidents was difficult due to no clear log of incidents being in place. This hinders incident monitoring.

p.5

good

The complaints process is not clear. Where children have made complaints, there is no audit trail of actions or outcomes, so children are not clear what has happened after they have complained. This has the potential to leave them feeling that they have not been listened to.

p.5

good

Some staff felt that a fourth child should not have been admitted to the home. They reported that the current difficult situation may have been avoided had the admission not taken place. They felt that the addition of a fourth child had had a significant detrimental impact on the three children already living at the home.

p.5

good

Staff report that they feel well supported by the manager, deputy manager and responsible individual. The deputy manager takes the role of ‘well-being practitioner’ which staff feel supports their mental health and overall well-being.

p.5

good

Managers understand when children are not making good progress. They take effective action to end placements while being mindful of the impact of a placement disruption and supporting a planned move out of the home. Inspection report children's home: 1223681 6

p.5

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, Children's Homes (England) Regulations 2015 and the 'Guide to the children's homes regulations including the quality standards'. The registered person(s) must comply within the given timescales.

p.6

Requirement Due date

The quality and purpose of care standard is that children receive care from staff who—

p.6

Requirement Due date

understand the children's home's overall aims and the outcomes it seeks to achieve for children;

p.6

Requirement Due date

use this understanding to deliver care that meets children's needs and supports them to fulfil their potential.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to—

p.6

Requirement Due date

ensure that the premises used for the purposes of the home are designed and furnished so as to—

p.6

Requirement Due date

meet the needs of each child. (Regulation 6 (1)(a)(b) and (2)(c)(i)) 30/06/2021

p.6

Requirement Due date

The positive relationships standard is that children are helped to develop, and to benefit from, relationships based on—

p.6

Requirement Due date

an understanding about acceptable behaviour; and

p.6

Requirement Due date

positive responses to other children and adults. (Regulation 11(1)(a)(b)(c)) 30/06/2021

p.6

Requirement Due date

The protection of children standard is that children are protected from harm and enabled to keep themselves safe.

p.6

Requirement Due date

In particular, the standard in paragraph (1) requires the registered person to ensure—

p.6

Requirement Due date

that staff manage relationships between children to prevent them from harming each other 30/06/2021 Inspection report children's home: 1223681 7 that the home's day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm. (Regulation 12 (1)(2)(a)(iv)(b)) The registered person must maintain records ("case records") for each child which—

p.6

Requirement Due date

are kept up to date. (Regulation 36(1)(b)) 30/06/2021

p.7

Requirement Due date

The registered person must ensure that a record is made of any complaint, the action taken in response, and the outcome of any investigation. (Regulation 39(3)) 30/06/2021

p.7

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people, using the 'Social care common inspection framework'. This inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with the Children's Homes (England) Regulations 2015 and the 'Guide to the children's homes regulations including the quality standards'. Inspection report children's home: 1223681 8

p.7

Children's home details

Registered provider: Sandcastle Care Ltd

p.8

Children's home details

Registered provider address: Sandcastle Care Ltd, 49 Whitegate Drive, Blackpool FY3 9DG

p.8

Inspector

Charlie Bamber, Social Care Inspector Inspection report children's home: 1223681 9 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children's social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children's services, and inspects services for children looked after, safeguarding and child protection.

p.8

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.9

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.9

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: http://www.gov.uk/ofsted

p.9

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion