Summary
What we read, and from where
Click a reading to see it highlighted in the report.
- Inspection date verified
5 Mar 2021
- Inspectors verified
Keith Riley
- Postcode verified
SP11 8TA
- Name on report verified
Grateley House School
- URN verified
116588
Deep dive
What this report says
In plain English
Join free to get a short, plain-English summary of any report.
Tone of the report
How positive or critical the inspectors' language is, from the words they chose. No AI involved.
Reads more critically than most reports of this type.
How the report reads, start to finish
Every paragraph in order, sized by length. Tap one to see it on the page.
Strengths
Quoted from the report. Tap to see it on the page.
Concerns
Quoted from the report. Tap to see it on the page.
- Serious and widespread concerns in relation to the care or protection of young people were still present. p.1
- The lack of clarity could lead to an inconsistent approach. p.1
- This has included addressing the gaps in analysing and following up on safeguarding concerns. p.2
- The purpose of this progress monitoring visit was to assess if the breaches of the national minimum standards have been suitably addressed. p.1
Next steps
Quoted from the report. Tap to see it on the page.
What the report dwells on
Topics by how often they come up, coloured by how they are described. Open one for an example.
Anatomy of the report
How the report is built, against others of the same type and grade.
- Pages
- 6
- Words of findings
- 930
- about usual (typical 1049)
- Reading level
- Hard
- Flesch 45, typical 45
- Average sentence
- 15 words
- Next steps
- 1
- typical 5
- Hedged sentences
- 8%
- “some”, “not always”, “most”…
Where the words go
Full report text
Progress monitoring inspection residential special school report
p.1
Grateley House School Grateley House School, Pond Lane, Grateley, Andover, Hampshire SP11 8TA
p.1
Context of the inspection
A welfare inspection took place on 10 to 12 March 2020, alongside an education inspection. The judgement was inadequate overall.
p.1
Context of the inspection
An assurance visit took place regarding the residential provision on 20 and 21 October 2020. Serious and widespread concerns in relation to the care or protection of young people were still present.
p.1
Context of the inspection
The purpose of this progress monitoring visit was to assess if the breaches of the national minimum standards have been suitably addressed.
p.1
Context of the inspection
During this visit, the inspector met with the head of care, staff and young people on site. Telephone calls and virtual meetings were held with other key staff and stakeholders due to COVID-19 (coronavirus) restrictions.
p.1
Summary of the progress made in implementing the action plan
Senior leaders are working with the host authority on their improvement journey. However, there is no single individual responsible as the designated safeguarding lead. The current arrangement splits responsibilities between care and education. This could result in concerns not being shared across the disciplines. The safeguarding structure is not in accordance with statutory guidance. Despite this, senior leaders have worked with other professionals to keep a young person as safe as possible while supporting the young person to be accountable, take responsibility and develop independence.
p.1
Summary of the progress made in implementing the action plan
While strategies have been implemented in practice to keep young people safe, some of these are not recorded explicitly in the risk management plans. The lack of clarity could lead to an inconsistent approach. The previous concerns about assessing the vulnerability of young people when forming relationships have been addressed. Senior leaders are working with other agencies and parents to keep young people as safe as possible, given their age and level of understanding.
p.1
Summary of the progress made in implementing the action plan
Senior leaders have taken suitable precautions during the COVID-19 pandemic. This has meant that staff are working in ‘bubbles.’ This has improved collaborative working and Inspection Report Grateley House School, 04/03/2021 Page 2 of 6 communication between academic and residential staff. Senior leaders recognise the need to maintain this relationship as restrictions are lifted.
p.1
Summary of the progress made in implementing the action plan
Current staffing arrangements are suitable. There is a mix of experienced staff and newer staff members. The head of care ensures that staff are suitably deployed to meet the needs of the young people in their care. Senior leaders acknowledge the potential for staffing shortages when they admit new young people into the provision again. They have a recruitment strategy to address the potential shortfalls. A headteacher and head of education have recently been appointed with an imminent start date.
p.2
Summary of the progress made in implementing the action plan
Senior leaders have addressed the shortfalls found in the arrangements for accommodation. They have reconfigured some of the buildings to increase the communal space and access to cooking facilities. Accommodation is well presented and has the feel of a domestic environment. The head of care is reviewing all bedroom doors to ensure that there is a ‘thumb-turn’ lock on the inside of each one.
p.2
Summary of the progress made in implementing the action plan
Senior leaders, including the governance board, have put systems in place to monitor the quality of care. This has included addressing the gaps in analysing and following up on safeguarding concerns. The high priority group meets regularly to keep action points on target.
p.2
Summary of the progress made in implementing the action plan
In some respects, care planning has improved. Staff have considered the cultural and identity needs of young people and incorporated these into placement plans. They consider the mental and emotional well-being of young people, for example by considering the underlying reasons for self-injurious behaviour. Staff speak highly of their easy access to the on-site mental health specialist for guidance and advice. The head of care has improved the impact risk assessment and admission process to maximise the chance of a successful placement.
p.2
Summary of the progress made in implementing the action plan
In other respects, care planning needs further consideration. There are conflicting views between the school, a family member and placing authority on the plans for one young person who has not been in the provision for some time. The young person remains on roll at the school but with limited educational provision while they are at home.
p.2
Summary of the progress made in implementing the action plan
The number of incidents requiring physical intervention are low. The plans to install a centralised, school-wide system to monitor incidents and behaviour have been put on hold. This is not currently having a negative impact on young people. Senior leaders have created, and recruited to, a new role of a positive behaviour support lead. Staff have documented significant incidents well and reflected on practice. Their approach, in one incident, has meant that a young person has neither been criminalised or permanently excluded.
p.2
Summary of the progress made in implementing the action plan
Senior leaders have not yet formed a consultative parent group even though they had identified this in the action plan. This is a missed opportunity to consult with, and work collaboratively with, key stakeholders. Some parents were positive about communication and others were negative. One parent said that there are mixed messages due to different staff saying different things. Inspection Report Grateley House School, 04/03/2021 Page 3 of 6 Senior leaders have ensured that the remedial work for fire safety has been completed. The necessary fire safety precautions are in place. Young people in the residential setting know how to evacuate in an emergency.
p.2
National minimum standards
The school must meet the following national minimum standard for residential special schools:
p.3
National minimum standards
Where significant changes are made to the placement plan there is appropriate consultation. (National minimum standard 21.1)
p.3
National minimum standards
ensure that the role of the designated safeguarding lead covers care and education. ensure that the consultative parent group is formed in line with the action plan. ensure that all established risk management strategies are documented.
p.3
Recommendations
Inspection Report Grateley House School, 04/03/2021 Page 4 of 6
p.4
Information about this school
Grateley House is an independent residential special school that is part of the Cambian Group; a national company that specialises in providing residential care and education for young people with autism spectrum disorder. The school provides co-educational termly residential care and education for students aged from nine to 19 with Asperger syndrome and associated difficulties within the autistic spectrum. There are currently 25 residential pupils within the school who are based in residential accommodation provided in six separate areas within the main school site. The seventh area is currently closed for refurbishment. A further 10 residential places are also available within a Care Quality Commission registered home in Salisbury. The school is located in the village of Grateley in Hampshire. The residential provision’s last full inspection was in March 2020. Inspection Report Grateley House School, 04/03/2021 Page 5 of 6
p.4
School details
Unique reference number 116588 Social care unique reference number SC012450 DfE registration number 850 6058
p.5
School details
This inspection was carried out under the Children Act 1989, as amended by the Care Standards Act 2000, having regard to the national minimum standards for boarding schools.
p.5
School details
The inspection was conducted in order to monitor the progress the school has made following the assurance visit in October 2020.
p.5
School details
Type of school Residential special school Number of boarders on roll 25 Gender of boarders Mixed Age range of boarders 9 to 19 Headteacher Post vacant Date of previous boarding inspection 10 to 12 March 2020 Telephone number 01264 889751 Email address Eva.Pereira@cambiangroup.com Inspection Report Grateley House School, 04/03/2021 Page 6 of 6 guidance ‘raising concerns and making complaints about Ofsted’, which is available from Ofsted’s website: www.gov.co.uk/ofsted . If you would like Ofsted to send you a copy of the guidance, please telephone 0300 123 4234, or email enquiries@ofsted.gov.uk .
p.5
School details
You can use Parent View to give Ofsted your opinion on your child’s school. Ofsted will use the information parents and carers provide when deciding which schools to inspect and when and as part of the inspection.
p.6
School details
You can also use Parent View to find out what other parents and carers think about schools in England. You can visit www.parentview.ofsted.gov.uk , or look for the link on the main Ofsted website: www.gov.co.uk/ofsted
p.6
School details
achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, work-based learning and skills training, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.
p.6
School details
Further copies of this report are obtainable from the school. Under the Education Act 2005, the school must provide a copy of this report free of charge to certain categories of people. A charge not exceeding the full cost of reproduction may be made for any other copies supplied.
p.6
School details
If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 4234, or email enquiries@ofsted.gov.uk .
p.6
School details
You may copy all or parts of this document for non-commercial educational purposes, as long as you give details of the source and date of publication and do not alter the information in any way.
p.6
School details
To receive regular email alerts about new publications, including survey reports and school inspection reports, please visit our website and go to ‘Subscribe’.
p.6
School details
T: 0300 123 4234 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.co.uk/ofsted
p.6
Discuss this inspection
Members compare notes on inspectors and inspections here. Join free to read and post.
Join the discussion