Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Simian Risk Management Limited

Inspected 28 Nov 2019 · published 20 Dec 2019 · URN 1236917

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    28 Nov 2019

  • Postcode verified

    WA3 6FW

  • Name on report verified

    SIMIAN Risk Management Limited

  • URN verified

    1236917

Page 1 of 5
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−14Mixedmore positive than 17% of reports of this type

In line with other reports of this type.

Praiseindependent
Criticismlimited

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspection positive critical

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
5
Words of findings
14
shorter than usual (typical 1049)
Reading level
—
Average sentence
7 words
Next steps
0
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 1%About the inspection 99%

Full report text

SIMIAN Risk Management Limited Re-inspection monitoring visit report

p.1

Type of provider: Independent learning provider

p.1

Address:

Wallis House 409 The Quadrant Birchwood Park Warrington WA3 6FW Monitoring visit: Simian Risk Management Limited, 27–28 November 2019

p.1

Context and focus of visit

SIMIAN Risk Management Limited (SIMIAN) was inspected in March 2019. At that time, inspectors judged the overall effectiveness of the provision as requires improvement.

p.2

Context and focus of visit

The focus of this monitoring visit was to evaluate the progress that leaders and managers have made in addressing the main areas for improvement identified at the previous inspection.

p.2

Context and focus of visit

SIMIAN is an independent training provider based in Warrington. There is an additional training site in the London borough of Waltham Forest. SIMIAN offers apprenticeships in scaffolding at level 2. At the time of the monitoring visit there were 31 apprentices, 29 on standards-based apprenticeship programmes and two on apprenticeship frameworks.

p.2

Reasonable progress

Leaders and managers have introduced a comprehensive foundation to the scaffolding industry. This means that apprentices fully understand the role and the expectations of the apprenticeship.

p.2

Reasonable progress

Assessors test thoroughly apprentices’ skills and abilities before they are introduced to scaffolding equipment. For example, apprentices, on their first day at SIMIAN, are required to undergo a height confidence test, by walking on an open mesh steel platform, to introduce them to the concept of working at height and to adopt safe working practices. The induction period prepares apprentices well for their apprenticeship and their future career.

p.2

Reasonable progress

Off-the-job training is planned well. Apprentices experience a two-week block of training followed by 12 to 16 weeks in the workplace. This allows them to practise and hone their new skills. Apprentices build their knowledge, skills and behaviours for the workplace throughout the programme. For example, apprentices develop the skills to erect and dismantle complex structures by learning to read drawings and by practising with roof saddles on simulated roof structures.

p.2

Reasonable progress

Apprentices are well supported both in the training centre and through site visits. The planning and coordination of the on-the-job training is less well planned. A few employers do not have a detailed understanding of what skills the apprentice needs to practice or any knowledge deficits that need addressing. The link between the Monitoring visit: Simian Risk Management Limited, 27–28 November 2019 apprentices mentor and assessor is underdeveloped. Therefore, these employers do not know how to underpin and reinforce the apprentices’ off-the-job training. Consequently, the pace of progress of a few apprentices is slow.

p.2

Reasonable progress

Leaders have made improvements in the design and implementation of the mathematics and English curriculums. There is a logical order to the development of apprentices’ skills and a useful range of activities to link learning to the workplace. However, due to the length of time between off-the-job training sessions, coupled with a lack of opportunity to practise the new skills in mathematics and English in the workplace, apprentices forget what they have learned because the skills are not embedded in their long-term memory.

p.3

Reasonable progress

Leaders have ensured that the ordering of the curriculum supports apprentices to develop substantial new knowledge, skills and behaviours. Initially apprentices develop key understanding in safety before embarking on working at height using fall protection equipment, including harnesses. As a result, learners return to the workplace with more confidence and greater understanding of the role of a scaffolder. Employers value the training their apprentices receive at the training centre as apprentices are more productive and work better as part of a team.

p.3

Reasonable progress

Leaders are improving the quality of education throughout the organisation. Since the last inspection they have completed a full review resulting in a staffing restructure and have reviewed roles, responsibilities and remuneration. This has led to greater accountability and improved performance management.

p.3

Reasonable progress

Leaders have ensured that the board has a clear understanding of the weaknesses and actions needed to bring about improvements. They have improved the rigour of reporting to the board by establishing a reporting cycle and range of reports that help board members understand the business better. As a result, leaders have initiated actions that have reduced the number of apprentices at risk of leaving or failing their apprenticeship.

p.3

Reasonable progress

Leaders have established excellent partnerships and links in the scaffolding industry. They work with leading employers and statutory authorities. Leaders use these links to develop and enhance the curriculum. For example, employers use the training base for development and testing of new products. As a result, staff use and test the latest safety equipment and kit. This maintains their skills, knowledge and currency in the industry and helps them in planning and ordering the curriculum. Monitoring visit: Simian Risk Management Limited, 27–28 November 2019 Leaders have a clear vision and business plan for the future of the organisation. This is based on the needs of the industry. Leaders undertake thorough research. They have identified a national shortage of skilled and qualified scaffolders. They rightly recognise their niche position in the industry to address these gaps. Monitoring visit: Simian Risk Management Limited, 27–28 November 2019

p.3

Reasonable progress

regulates and inspects to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.

p.5

Reasonable progress

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk .

p.5

Reasonable progress

You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.5

Reasonable progress

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.5

Reasonable progress

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.5

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion