Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's home run by Together For Children Sunderland

Inspected 5 Dec 2018 · URN 1254837

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

RI to be good

Jacqueline Tate

What we read, and from where

Click a reading to see it highlighted in the report.

  • Group verified

    Together for Children Sunderland Limited

  • Inspection date verified

    5 Dec 2018

  • Inspectorssingle source

    Jacqueline Tate

  • Helped and protected verified

    Requires improvement to be good

  • Leadership and management verified

    Requires improvement to be good

  • Overall effectiveness verified

    Requires improvement to be good

  • Name on report verified

    1254837

  • URN verified

    1254837

Page 1 of 10
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Grade profile

Hollow rings show the previous inspection, 2018.

  • OverallRI to be good
  • Helped and protectedRI to be good
  • Leadership and managementRI to be good

13% of comparable inspections in the last three years were graded Requires improvement to be good (12,716 inspections).

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−32Criticalmore positive than 48% of reports of this type graded Requires improvement to be good
OutstandingGoodRIInadequate

In line with other reports of this type graded Requires improvement to be good.

Markers show where typical reports of each grade sit.

Praisepositivecleareffectivelysafeimprovedseriousfailuresconsistent
Criticismpoornot yetharmconcernat riskrequires improvementdeclinedrisk of harm

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1238w−38
  • What needs to improve758w−14

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
10
Words of findings
1,968
about usual (typical 1899)
Reading level
Hard
Flesch 48, typical 50
Average sentence
19 words
Next steps
7
typical 8
Hedged sentences
7%
“some”, “not always”, “most”…

Where the words go

Findings 51%What needs to improve 31%About the inspection 18%

Full report text

Inspection report children’s home: 1254837 1 Registered provider: Together for Children Sunderland Limited

p.1

Full inspection Inspected under the social care common inspection framework

p.1

Information about this children’s home

This home provides care and accommodation for up to six children and young people who have emotional and/or behavioural difficulties. It is operated by a limited company. Since the last inspection, the registered manager has been absent from the home.

p.1

Overall experiences and progress of

children and young people, taking into account

p.1

requires improvement to be good

How well children and young people are helped and protected requires improvement to be good

p.1

requires improvement to be good

The effectiveness of leaders and managers requires improvement to be good

p.1

requires improvement to be good

The children’s home is not yet delivering good help and care for children and young people. However, there are no serious or widespread failures that result in their welfare not being safeguarded or promoted.

p.1

requires improvement to be good

Date of last inspection: 31 October 2018

p.1

requires improvement to be good

Overall judgement at last inspection: declined in effectiveness

p.1

Enforcement action since last inspection:

Following the interim inspection in October 2018, three compliance notices were issued. At this full inspection, the inspector found evidence that all three compliance notices have been met. Inspection report children’s home: 1254837 2

p.1

Inspection date Inspection type Inspection judgement

31/10/2018 Interim Declined in effectiveness 19/06/2018 Full Requires improvement to be good 02/05/2018 Interim Declined in effectiveness 15/01/2018 Full Good Inspection report children’s home: 1254837 3

p.2

Statutory requirements

This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, Children’s Homes (England) Regulations 2015 and the ‘Guide to the children’ homes regulations including the quality standards’. The registered person(s) must comply within the given timescales.

p.3

Requirement Due date

The quality and purpose of care standard is that children receive care from staff who— understand the children’s home’s overall aims and the outcomes it seeks to achieve for children; use this understanding to deliver care that meets children’s needs and supports them to fulfil their potential. In particular, the standard in paragraph (1) requires the registered person to— understand and apply the home’s statement of purpose; ensure that staff— understand and apply the home’s statement of purpose; protect and promote each child’s welfare; treat each child with dignity and respect; provide personalised care that meets each child’s needs, as recorded in the child’s relevant plans, taking account of the child’s background; help each child to understand and manage the impact of any experience of abuse or neglect. (Regulation 6 (1)(a)(b)(2)(a)(b)(i)(ii)(iii)(iv)(v)) 06/01/2019

p.3

Requirement Due date

The positive relationships standard is that children are helped to develop, and to benefit from, relationships based on— mutual respect and trust; and an understanding about acceptable behaviour; and positive responses to other children and adults. In particular, the standard in paragraph (1) requires the registered person to ensure that staff

p.3

Requirement Due date

-meet each child’s behavioural and emotional needs, as set out 06/01/2019 Inspection report children’s home: 1254837 4 in the child’s relevant plans; and understand how children’s previous experiences and present emotions can be communicated through behaviour and have the competence and skills to interpret these and develop positive relationships with children. (Regulation 11 (1)(2)(a)(ix)) The protection of children standard is that children are protected from harm and enabled to keep themselves safe. In particular, the standard in paragraph (1) requires the registered person to ensure— that staff assess whether each child is at risk of harm, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child; help each child to understand how to keep safe; have the skills to identify and act upon signs that a child is at risk of harm;

p.3

Requirement Due date

manage relationships between children to prevent them from harming each other. that the home’s day-to-day care is arranged and delivered so as to keep each child safe and to protect each child effectively from harm; (Regulation 12 (1)(2)(a)(i)(ii)(iii)(iv)(b)) 06/01/2019

p.4

Requirement Due date

T he leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that— helps children aspire to fulfil their potential; and promotes their welfare. In particular, the standard in paragraph (1) requires the registered person to— lead and manage the home in a way that is consistent with the approach and ethos, and delivers the outcomes, set out in the home’s statement of purpose; ensure that staff work as a team where appropriate; ensure that staff have the experience, qualifications and skills to meet the needs of each child; ensure that the home has sufficient staff to provide care for each child; ensure that the home’s workforce provides continuity of care to each child; demonstrate that practice in the home is informed and improved 06/01/2019 Inspection report children’s home: 1254837 5 by taking into account and acting on— research and developments in relation to the ways in which the

p.4

Requirement Due date

needs of children are best met; and feedback on the experiences of children, including complaints received. (Regulation 13 (1)(a)(b)(2)(a)(b)(c)(d)(g)) The care planning standard is that children— receive effectively planned care in or through the children’s home. (Regulation 14 (1)(a)) 06/01/2019

p.5

Recommendations

 Children must be consulted regularly on their views about the home’s care, to inform and support continued improvement in the quality of care provided. Due consideration should be given to the child’s cognitive ability in the development and implementation of any consultation processes. Children should be able to see the results of their views being listened to and acted upon. (‘Guide to the children’s homes regulations including the quality standards’, page 22, paragraph 4.11)  Staff should be familiar with the home’s policies on record keeping and understand the importance of careful, objective, and clear recording. Staff should record information on individual children in a non-stigmatising way that distinguishes between fact, opinion and third-party information. Information about the child must always be recorded in a way that will be helpful to the child. (‘Guide to the children’s homes regulations including the quality standards’, page

p.5

improvement to be good

There is clear evidence that all three compliance notices issued at the last inspection have been met. The experiences of children and young people in this home continue to be mixed. However, there are now clear plans in place to address the shortfalls in practice.

p.5

improvement to be good

Educational attendance and attainment have been an ongoing issue of concern and raised in previous inspections. There are some improvements to address this. Each child and young person now has an individual educational plan to be followed should they refuse education. The effectiveness of such plans is not yet known, as there has been little time to integrate this into practice since the last inspection.

p.5

improvement to be good

The children and young people are happy living at the home. New incentive schemes Inspection report children’s home: 1254837 6 have led to one young person being rewarded with a mobile phone. Activities are offered regularly, and children and young people take part on a regular basis. The activities enhance the experiences of children and young people as well as supporting and building positive relationships with the adults who care for them. Since the last inspection, some children and young people have been supported by the staff team to access services that they previously declined to engage with. This will support children and young people to make progress.

p.5

improvement to be good

Key-worker sessions are carried out and recorded. In the main, they still tend to be reactive to situations that arise rather than as a part of planned, individual work. Staff are beginning to link the residential placement plans and risk assessments. The staff team has received training and good practice examples shared of what good key-worker sessions should look like. There was clear evidence of the senior staff team driving improvements forward in this area.

p.6

improvement to be good

Some practices within the home continue to be poor and require improvements to be good. For example, the inspector found evidence in one case of misleading information being shared in a key-worker session. Poor advice and guidance provided to children and young people are likely to hinder progress.

p.6

improvement to be good

The use of language in records is not always helpful for children and young people to read. The recording of opinions, judgements and the use of stigmatising language remain common features of daily practice with some members of staff. Recording issues remain an area for improvement.

p.6

improvement to be good

One young person was recently supported to deliver a presentation at a large public event. This type of experience provides opportunities for children and young people to feel valued about what they have to say and what they have to contribute. Further progress is required around ascertaining children and young people’s views. In particular, the use of house meetings is necessary. There is not yet a plan in place to ensure that they occur on a regular basis. Neither is there a clear process in place for the staff team to respond to and support children’s and young people’s views.

p.6

improvement to be good

Improvements have been made to the quality of risk assessments and risk management processes since the interim inspection. The inspector found evidence of the staff team following some risk assessments and effectively recording the steps they have taken to mitigate risk of harm.

p.6

improvement to be good

Missing from home episodes have reduced in the five weeks since the interim inspection. When children and young people have been missing from the home, the appropriate protocols have been followed.

p.6

improvement to be good

There have been no incidents that have required the use of physical intervention. Refresher training in the ‘Therapeutic Crisis Intervention’ model is scheduled. Inspection report children’s home: 1254837 7 The staff have received training linked to self-harming behaviours and safeguarding. Further training is scheduled. Self-harming behaviours have reduced in the period since the interim inspection.

p.6

improvement to be good

To develop the home’s practice around crisis intervention, the key-workers plan to consult with children and young people on how they would like to be supported during crisis situations. This is part of the home’s improvement plan. Such steps would provide children and young people with a consistent and safe approach to managing harmful behaviours.

p.7

improvement to be good

The home has improved its safeguarding culture. Safeguarding is now added as a stand- alone agenda item in team meetings and individual supervisions. The home has introduced a new template for supervisions that supports a more qualitative approach to facilitating supervision sessions. The effectiveness is not yet known, as this is a new development that the senior staff team have introduced.

p.7

improvement to be good

Bullying is a current issue of concern. Some responses to incidents have not been effectively managed to ensure the safeguarding of all children and young people involved. Improvements in this area are required.

p.7

The effectiveness of leaders and managers: requires improvement to be good

Since the interim inspection, the registered manager has been absent. The deputy manager is currently on fazed return to duties following a period of sickness. Staffing issues have been an ongoing issue of concern. There are plans in place to address this. Supervision records reflect where poor practice is being challenged. There is an ongoing recruitment process to appoint additional staff.

p.7

The effectiveness of leaders and managers: requires improvement to be good

The absence of a registered manager has not prevented improvements and progress being made. The senior staff team, with the support of the senior management team, has taken reasonable steps to meet the requirements in the compliance notices. There is a plan and clear system in place to drive improvements forward and address shortfalls in practice. The effectiveness of implementing such strategies is not yet known, given the short period of time that has elapsed since the interim inspection.

p.7

The effectiveness of leaders and managers: requires improvement to be good

The staff team recognises areas that require further improvements. The aspirations and motivation of the senior staff team have had positive effects. The improvements made have lifted staff morale, motivating them to continue their improvement journey. Comments such as, ‘They lead us by example’ and ‘I feel supported and have clear direction of where we need to be to be good’, are phrases used by those staff members spoken with.

p.7

The effectiveness of leaders and managers: requires improvement to be good

The registered manager has not ensured that all mandatory training is in date. Since the interim inspection, staff have received training around safeguarding in the digital world and self-harm. The deputy manager has taken steps to ensure that all staff, including relief staff, complete mandatory training. Inspection report children’s home: 1254837 8 The senior staff team has ensured that there has been an audit of each child or young person’s file. Previous inspections have highlighted that the efficiency of monitoring and auditing systems in place have fluctuated. The new systems in place have been effective at identifying shortfalls.

p.7

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people. Inspectors considered the quality of work and the differences made to the lives of children and young people. They watched how professional staff work with children and young people and each other and discussed the effectiveness of help and care provided. Wherever possible, they talked to children and young people and their families. In addition, the inspectors have tried to understand what the children’s home knows about how well it is performing, how well it is doing and what difference it is making for the children and young people whom it is trying to help, protect and look after.

p.8

Information about this inspection

Using the ‘Social care common inspection framework’, this inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service, how it meets the core functions of the service as set out in legislation, and to consider how well it complies with the Children’s Homes (England) Regulations 2015 and the ‘Guide to the children’s homes regulations including the quality standards’. Inspection report children’s home: 1254837 9

p.8

Children’s home details

Registered provider: Together for Children Sunderland Limited

p.9

Children’s home details

Registered provider address: Civic Centre, Burdon Road, Sunderland, Tyne and Wear SR2 7DN

p.9

Inspector

Jacqueline Tate, social care inspector Inspection report children’s home: 1254837 10 achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for children looked after, safeguarding and child protection.

p.9

Inspector

If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.10

Inspector

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.10

Inspector

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/ofsted

p.10

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion