Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected —

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Catherine Anwar

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Catherine Anwar

  • Postcode verified

    SW1P 4QP

Page 1 of 7
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−40Criticalmore positive than 9% of reports of this type

Reads more critically than most reports of this type.

Praisestrongimprovedeffectiveoutstandingrobustpositiverapid progressambitious
Criticismnot yetpoorlacklimitedinadequatetoo manyweakshortcomings

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improve positive critical
  • Findings1473w−45
  • What needs to improve646w−27

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
7
Words of findings
2,029
longer than usual (typical 1049)
Reading level
Hard
Flesch 35, typical 45
Average sentence
18 words
Next steps
8
typical 5
Hedged sentences
6%
“some”, “not always”, “most”…

Where the words go

Findings 70%What needs to improve 30%

Full report text

Ofsted is proud to use recycled paper 11 March 2015

p.1

Mr John Murphy Chief Executive Officer Oasis Community Learning Trust Millbank Tower 21–24 Millbank London SW1P 4QP

p.1

Focused inspection of Oasis Multi-Academy Trust

Following the focused inspection of a number of Oasis academies and the subsequent follow-up visit by Her Majesty’s Inspectors Catherine Anwar, Julie Winyard and Brian Blake, I am writing on behalf of Her Majesty’s Chief Inspector of Education, Children’s Services and Skills to confirm the inspection findings.

p.1

Focused inspection of Oasis Multi-Academy Trust

Thank you for your cooperation and that of all the staff whom we met during our visit on 9 and 10 March 2015. We particularly appreciate the time and care taken to prepare the programme for us. Please pass on our thanks to your staff and other stakeholders who kindly gave up their time to meet us.

p.1

Evidence

Ten academies were inspected as part of the focused inspection between 2 and 5 March 2015. Eight of these inspections were section 5 inspections and two were section 8 monitoring inspections. Telephone discussions were held with the principals of 20 other academies on 3 and 4 March 2015. During our follow-up visit to Oasis national office, discussions were held with senior and operational staff from the trust, principals, governors, strategic partners and other stakeholders. Inspectors also scrutinised a range of relevant documentation.

p.1

Context

Oasis Community Learning Trust (OCL) was established in 2004. There are now 44 academies in the trust. These include 16 secondary academies, two all-through academies and 26 primary academies. The academy trust has grown rapidly, taking on 30 new academies in the last three years; 17 of these have joined in the last two years. There is one teaching school in the trust. Academies are now organised into regions, each led by a Regional Academy Director. Aviation House 125 Kingsway London WC2B 6SE T 0300 123 1231 Textphone 0161 618 8524 enquiries@ofsted.gov.uk www.gov.uk/Ofsted You took up the post of Chief Executive Officer of OCL in September 2014. The National Director of Academy Improvement was appointed in September 2014. OCL leaders and the OCL board carry out the statutory functions of governance, while each academy has an academy council to oversee its links with the local community.

p.1

Summary findings

The trust’s academies have a variable record of improvement. While some have improved or sustained effective performance, too many academies have not improved quickly enough. A legacy of weak challenge and insufficiently systematic or rigorous improvement work has resulted in slow or little improvement for nearly half the academies. The record of improvement is much stronger in some regions than in others. You recognise the need to accelerate the pace of improvement in individual academies and you have taken action to increase rigour in your monitoring since September 2014. Regional Academy Directors now have targets for improving academies more quickly: the new and more ambitious target is to move an academy from ‘requires improvement’ to outstanding within five years.

p.2

Summary findings

Across the trust, some groups of pupils do not achieve well. Disadvantaged pupils, particularly boys, make significantly less progress than their peers nationally. Although in some academies this gap is closing, in too many it is not and, overall, it remains a concern. Recently introduced systems and processes show, as yet, limited impact on improved outcomes for pupils. The trust’s leaders have prioritised specific areas of improvement, including the poor achievement of disadvantaged boys. However, there is no evidence of an overall strategy or plan that focuses on these particular issues.

p.2

Summary findings

The trust has good systems to collect and review a range of data about its academies’ performance. Academies submit data every seven weeks, providing the trust’s leaders with a detailed and regular overview of their performance. Most Regional Academy Directors make appropriate use of this information to monitor academies’ performance and they undertake regular visits to follow up any issues.

p.2

Summary findings

All academies are subject to formal annual reviews by the trust’s leaders. In addition to the ongoing scrutiny of data about pupils’ achievement, the review process includes lesson observations, examination of pupils’ work, observation of pupils’ behaviour, discussions with pupils and analysis of the quality of teaching and leadership. Primary headteachers say that they find these review visits helpful. However, the quality of these review reports at primary level is poor. The reports lack detailed analysis, are not evaluative and do not identify precise areas for improvement. In addition, they do not make it clear when and how any improvement points will be reviewed. Reports do not therefore provide the trust’s leaders with enough information to track improvement or spot decline sharply or rapidly enough. While the trust’s leaders acknowledge this significant shortcoming, they have only just begun to address it: even recent primary reviews are poor. Since September,

p.2

Summary findings

reviews of secondary academies have become more robust. Recent secondary review reports provide stronger challenge and thorough evaluation and identify clear points for improvement.

p.2

Summary findings

Information from regional academy directors’ visits to academies is provided to the National Director of Academy Improvement and is now better used to inform the appropriate provision of support and training. Academy leaders report that data are used particularly well to identify the precise support needed by new academies. External consultants are brokered by the trust to provide individual academies with specific support. Although leaders say that they welcome this support, there is limited evidence of its impact on standards. Several reports written by external consultants lack detail, demonstrate little challenge and do not review the impact of their work with academies. Support is increasingly being provided by skilled practitioners identified from within the stronger academies. Academy leaders are positive about this development and there are signs of early impact on the quality of teaching and leadership.

p.3

Summary findings

The work of the teaching school is beginning to have a positive impact on the work of other academies. In particular, the leadership programme is helping to improve the quality of senior and middle leadership in a number of academies. The teaching school is situated in the north west and as such is not able to reach all the academies in the trust. The trust’s leaders have recognised this and, as a result, regional lead academies are being set up in other regions so that good practice can be shared and implemented more widely.

p.3

Summary findings

The trust makes good use of its strongest leaders. However, there is limited leadership capacity within the trust and this slows progress, when, for example, a Regional Academy Director has to act as an Executive Principal in addition to their other role. There is also potential confusion between the role of the National Director of Academy Improvement and that of the Regional Academy Directors. There is lack of clarity about the extent of each person’s responsibility and accountability for the direct improvement of an academy or for the quality assurance of any improvement work and its impact. This inefficiency is slowing progress in some academies. Line management of OCL leaders has, until recently, not been sufficiently rigorous and this has led to inadequate communication in some areas.

p.3

Summary findings

Regional and national conferences provide beneficial opportunities for the sharing of good practice and leadership development and support. However, trust leaders acknowledge that there is currently limited capacity to offer strong subject-level support across the trust and this needs improvement.

p.3

Summary findings

The trust’s model of governance is clear and well-understood by all. Regional Academy Directors attend each academy council in their region on a regular basis. This links the trust’s central governance with the work of local governing bodies. The responsibility for performance management of academy principals lies with the Regional Academy Director. The chair of the academy council contributes to this process. While the trust provides overarching national policies, each academy council may adapt these according to local need. Nevertheless, until very recently, governance has not been effective enough to support the rapid improvement required in many OCL academies.

p.3

Summary findings

The trust’s strong and distinctive community ethos is communicated very effectively to all academies. Rightly, the trust links its school improvement and community development work, recognising that the one supports the other. Principals speak enthusiastically of being part of the Oasis ‘family’ and the benefits of collaboration and support that this brings.

p.4

Summary findings

Responsibility for the trust’s safeguarding and child protection policy has, until now, been held by the human resources department. A lack of robust evaluation and monitoring of the policy by trust leaders has led to shortcomings and omissions. This has contributed to poor safeguarding practice in at least one academy. The trust’s leaders have now begun to improve the policy to ensure that it provides academies with appropriate safeguarding guidance. However, there is still much work to do to ensure that all relevant and recent legislation covering potential risks posed to children is taken fully into account. It is also vital that leaders ensure that the policy is reviewed and updated regularly, as this has not been the case in the past.

p.4

Recommendations

 Ensure that disadvantaged pupils, particularly boys, make more rapid progress across the trust’s academies so that they catch up with their peers.  Evaluate the impact of all work with academies so that it leads to rapid and sustained improvement.  Further develop the work of the trust’s teaching school and other strong practitioners to support rapid improvement for those academies that have remained ‘static’ for too long.  Ensure, through rigorous quality assurance, that reviews of primary academies are as robust and challenging as reviews of secondary academies.  Review and update all of the trust’s policies regularly, particularly the safeguarding and child protection policies, taking into account recent and relevant legislation, especially that relating to the welfare of children.

p.4

March 2015

Oasis Academy Aspinal North West Manchester 09/2013 Not previously inspected as an academy Oasis Academy Coulsdon London Croydon 09/2008 2 (2011) 2

p.5

March 2015

Oasis Academy Hobmoor West Midlands Birmingham 09/2013 Not previously inspected as an academy Oasis Academy Isle of Sheppey South East Kent 01/2014 3 (2013) (under previous sponsorship arrangements) Oasis Academy Johanna London Lambeth 09/2011 Not previously inspected as an academy Oasis Academy Skinner Street South East Medway 09/2013 Not previously inspected as an academy 4 (special measures)

p.5

March 2015

Oasis Academy Boulton West Midlands Birmingham 05/2013 Not previously inspected as an academy Oasis Academy Longmeadow South West Wiltshire 04/2012 Not previously inspected as an academy

p.5

March 2015

Oasis Academy Mayfield South East Southampton 09/2008 3 (2014) Taking effective action Oasis Academy MediaCityUK North West Salford 09/2008 4 (special measures) (2014) Reasonable progress

p.5

and date

Oasis Academy Bank Leaze South West City of Bristol 09/2012 3 (2014)

p.6

and date

Oasis Academy Blakenhale Infants West Midlands Birmingham 03/2013 3 (2014)

p.6

and date

Oasis Academy Blakenhale Junior West Midlands Birmingham 03/2013 3 (2014)

p.6

and date

Oasis Academy Brightstowe South West City of Bristol 09/2008 2 (2015)

p.6

and date

Oasis Academy Byron London Croydon 09/2012 Not yet inspected as an academy Oasis Academy Connaught South West City of Bristol 09/2012 3 (2014)

p.6

and date

Oasis Academy Enfield London Enfield 09/2007 2 (2010)

p.6

and date

Oasis Academy Firvale North East, Yorkshire and Humber Sheffield 09/2014 Not yet inspected as an academy

p.6

and date

Oasis Academy Foundry West Midlands Birmingham 02/2014 Not yet inspected as an academy Oasis Academy Hadley London Enfield 09/2009 2 (2012)

p.6

and date

Oasis Academy Harpur Mount North West Manchester 01/2013 2 (2014)

p.6

and date

Oasis Academy Henderson Avenue North East, Yorkshire and Humber North Lincolnshire 01/2013 2 (2014)

p.6

and date

Oasis Academy Hextable South East Kent 09/2013 Not yet inspected as an academy Oasis Academy Immingham North East, Yorkshire and Humber North East Lincolnshire 09/2008 3 (2014)

p.6

and date

Oasis Academy John Williams South West City of Bristol 09/2008 2 (2013)

p.6

and date

Oasis Academy Limeside North West Oldham 09/2011 1 (2013)

p.6

and date

Oasis Academy Lister Park North East, Yorkshire and Humber Bradford 09/2013 Not yet inspected as an academy

p.6

and date

Oasis Academy Long Cross South West City of Bristol 01/2014 Not yet inspected as an academy Oasis Academy Lords Hill South East Southampton 09/2008 3 (2013)

p.6

and date

Oasis Academy New Oak South West City of Bristol 09/2012 2 (2014)

p.6

and date

Oasis Academy Nunsthorpe North East, Yorkshire and Humber North East Lincolnshire 09/2012 3 (2014) Oasis Academy Oldham North West Oldham 09/2010 3 (2014)

p.6

and date

Oasis Academy Parkwood North East, Yorkshire and Humber North Lincolnshire 11/2013 3 (2014)

p.7

and date

Oasis Academy Pinewood London Havering 10/2013 Not yet inspected as an academy Oasis Academy Ryelands London Croydon 05/2014 Not yet inspected as an academy Oasis Academy Shirley Park London Croydon 09/2009 1 (2013)

p.7

and date

Oasis Academy Short Heath West Midlands Birmingham 03/2014 2 (2014)

p.7

and date

Oasis Academy Silvertown London Newham 09/2014 Not yet inspected as an academy Oasis Academy South Bank London Lambeth 09/2013 Not yet inspected as an academy Oasis Academy Warndon West Midlands Worcestershire 10/2013 Not yet inspected as an academy Oasis Academy Watermead North East, Yorkshire and Humber Sheffield 09/2014 Not yet inspected as an academy

p.7

and date

Oasis Academy Wintringham North East, Yorkshire and Humber North East Lincolnshire 09/2007 3 (2014)

p.7

and date

Oasis Academy Woodview West Midlands Birmingham 03/2013 2 (2014)

p.7

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion