Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected —

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Jeff Banham

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Jeff Banham

  • Postcode verified

    SG17 5TQ

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+16Mostly positivemore positive than 33% of reports of this type

In line with other reports of this type.

Praiseeffectivestrengthclearclearlywell supportedimprovedtimelydelay
Criticismcompromisednot alwaysconcernsvariablenot effective

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improve positive critical
  • Findings648w+83
  • What needs to improve230w−77

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
878
about usual (typical 1049)
Reading level
Hard
Flesch 34, typical 45
Average sentence
19 words
Next steps
8
typical 5
Hedged sentences
9%
“some”, “not always”, “most”…

Where the words go

Findings 74%What needs to improve 26%

Full report text

Mrs Edwina Grant Central Bedfordshire Council Priory House Monks Walk Chicksands Shefford Central Bedfordshire SG17 5TQ

p.1

arrangements within Central Bedfordshire Council children’s services

This letter summarises the findings of the recent unannounced inspection of contact, referral and assessment arrangements within local authority children’s services in Central Bedfordshire Council which was conducted on 16 and 17 March 2011. The inspection was carried out under section 138 of the Education and Inspections Act 2006. It will contribute to the annual review of the performance of the authority’s children’s services, for which Ofsted will award a rating later in the year. I would like to thank all of the staff we met for their assistance in undertaking this inspection.

p.1

arrangements within Central Bedfordshire Council children’s services

The inspection sampled the quality and effectiveness of contact, referral and assessment arrangements and their impact on minimising any child abuse and neglect. Inspectors considered a range of evidence, including: electronic case records; supervision files and notes; observation of social workers and senior practitioners undertaking referral and assessment duties; and other information provided by staff and managers. Inspectors also spoke to a range of staff including managers, social workers, other practitioners and administrative staff.

p.1

arrangements within Central Bedfordshire Council children’s services

The inspection identified one area of strength and areas of practice that met requirements, with some areas for development.

p.1

arrangements within Central Bedfordshire Council children’s services

The areas of development identified at the previous inspection of contact, referral and assessment arrangements in May 2010 have been met. The council has worked diligently to address the issues that were identified and can demonstrate significant improvement in these areas.

p.1

arrangements within Central Bedfordshire Council children’s services

From the evidence gathered, the following features of the service were identified:

p.1

Strengths

ƒ Arrangements for the transfer of cases between teams are undertaken Freshford House Redcliffe Way Bristol BS1 6NL T 0300 1231231 enquiries@ofsted.gov.uk www.ofsted.gov.uk Direct T 03000 130570

p.1

Strengths

Safeguarding.lookedafterchildren@ofsted.gov.uk efficiently and without delay. The transfer is underpinned by a two-stage process that ensures that all tasks are completed and that plans and ensuing actions are fully understood and promptly implemented in order to safeguard children.

p.1

following areas

ƒ Most assessments are comprehensive, clear and offer sound analysis on which further plans are based. There is a good understanding of risk and protective factors. Research is widely used and referred to within assessments and informs conclusions and decision making.

p.2

following areas

ƒ Children and family members are routinely involved in assessments and in planning. Views and opinions are demonstrably taken into account and clearly recorded. Management oversight of cases is well embedded and underpins effective casework and decision-making. This ensures that work is appropriately undertaken and that staff are well supported.

p.2

following areas

ƒ Case supervision is regularly provided and is in accordance with the council’s procedures. It is reflective and case-specific and is valued by staff through supporting their decision-making and professional development.

p.2

following areas

ƒ The understanding and use of the common assessment framework (CAF) by partner agencies has improved and is leading to an increased number of children being supported through early intervention services. The council is continuing its work to ensure the use of CAF is fully integrated into the practice of partner agencies.

p.2

following areas

ƒ Section 47 child protection enquiries are carried out by suitably qualified and experienced workers and are effective in supporting the safeguarding of children. Decision making is appropriate and timely and leads to suitable intervention where this is required.

p.2

following areas

ƒ The recently introduced independent audit process provides objective critical scrutiny of work undertaken including the quality of case recording. This process provides managers and staff with clear information on social workers’ practice.

p.2

following areas

ƒ Staff workloads have reduced over the past year and as a result are more manageable. This supports staff in responding to children’s needs in a timely way and has greatly increased social workers’ capacity to undertake direct work with children and families.

p.2

following areas

ƒ The diverse needs of children are taken into account when assessing their needs and clearly recorded within case files. Safeguarding plans demonstrate a good level of respect for ethnicity, age, culture and religious needs of children and their families.

p.2

Areas for development

ƒ The electronic record-keeping system does not provide effective support to staff and managers. Record-keeping, data retrieval and analysis and the efficient use of social worker time are all compromised by the inadequacies of the current system.

p.3

Areas for development

ƒ Performance management systems do not provide an overview of the work of the intake and referral team. The council is not easily able to provide information on the amount or nature of duty work being undertaken at any given time.

p.3

Areas for development

ƒ Unqualified staff undertake both initial and core assessments as part of supervised staff development. This is contrary to the guidance in ‘Working Together’. Whilst there is no evidence that outcomes for children have so far been affected by work being carried out by unqualified staff, risks are increased by this arrangement.

p.3

Areas for development

ƒ Work undertaken at the point of contact does not always meet the guidance in ‘Working Together’. In some cases seen by inspectors decisions had been made to close contacts before full information had been gathered.

p.3

Areas for development

ƒ Referrals from the police are variable in timeliness and the detail of information provided. This can impact on the council’s ability to provide appropriate responses to safeguarding concerns.

p.3

Areas for development

Any areas for development identified above will be specifically considered in any future inspection of services to safeguard children within your area.

p.3

Her Majesty’s Inspector

Copy: Richard Carr, Chief Executive, Central Bedfordshire Council Andrew Spencer, Department for Education

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion