Social care · Social care monitoring visit
Children's Home run by Cambian Childcare Limited in Cambridgeshire
Summary
Natalie Burton (lead), Clive Lucas
What we read, and from where
Click a reading to see it highlighted in the report.
- Group verified
Cambian Childcare Limited
- Inspection date verified
21 Feb 2018
- Inspectorssingle source
Clive Lucas, Natalie Burton
- Name on report verified
1257796
- URN verified
1257796
Deep dive
What this report says
In plain English
Join free to get a short, plain-English summary of any report.
Tone of the report
How positive or critical the inspectors' language is, from the words they chose. No AI involved.
Reads more critically than most reports of this type.
How the report reads, start to finish
Every paragraph in order, sized by length. Tap one to see it on the page.
Strengths
Quoted from the report. Tap to see it on the page.
No standout praise found.
Concerns
Quoted from the report. Tap to see it on the page.
No strong criticism found.
Next steps
Quoted from the report. Tap to see it on the page.
- The registered person must ensure that the requirements of the Regulatory Reform (Fire Safety) Order 2005 and any regulations made under it are complied with in respect of the home. p.4
- The registered person must ensure that within 48 hours of the use of a measure of control, discipline or restraint in relation to a child in the home, the registered person, or a person who is authorised by the registered person to do so has spoken to the user about the measure and has signed the record to confirm it is accurate. p.4
- The registered person must ensure that no measure of control is excessive, unreasonable or contrary to The Children’s Homes (England) Regulations. p.4
- This is with particular regard to taking effective action and identifying new strategies to reduce the risk of recurrences following incidents. p.5
- The procedure to be followed in the event of an allegation of abuse or neglect must, in particular, provide for the prompt referral of an allegation about current or ongoing abuse or neglect in relation to the child to the placing authority and, if different, the local authority in whose area the home is located. p.5
What the report dwells on
Topics by how often they come up, coloured by how they are described. Open one for an example.
Anatomy of the report
How the report is built, against others of the same type and grade.
- Pages
- 7
- Words of findings
- 657
- about usual (typical 566)
- Reading level
- Hard
- Flesch 39, typical 46
- Average sentence
- 25 words
- Next steps
- 5
- typical 5
- Hedged sentences
- 0%
- “some”, “not always”, “most”…
Where the words go
Full report text
Inspection report for children’s home - monitoring visit: 1257796 1
p.1
Cambian Childcare Limited
Monitoring visit Inspected under the social care common inspection framework
p.1
Information about this children’s home
This home is registered for up to 16 children who have mental disorders. It is privately owned and has a separately registered school on-site.
p.1
This monitoring visit
On 28 and 29 November 2017, an inspector carried out a monitoring inspection of the home. At the inspection, the inspector found that there were not enough qualified and experienced staff at the home to manage effectively the challenging behaviour of the children. There was significant damage to the furniture of the home, and the management’s monitoring of the home had not identified a number of errors in recording. Ofsted served a notice restricting accommodation and a compliance notice relating to the leadership and management on 6 December 2017. On 9 January 2018, an inspector undertook a monitoring inspection to evaluate the progress made in meeting the compliance notice. The organisation had made some progress. However, it had not yet met the compliance notice. Due to the progress made, Ofsted served a further compliance notice, rather than escalating to a higher level of intervention.
p.1
This monitoring visit
On 20 February 2018, two inspectors carried out a monitoring inspection of the home to evaluate compliance with the notice in place restricting accommodation. At this inspection, the inspectors found:
p.1
This monitoring visit
The provider has not admitted any further children to the home since the notice restricting accommodation was served on 7 December 2017.
p.1
This monitoring visit
There was a lack of sufficient action taken to ensure the safety of children and staff while the electric gate to the home was not working.
p.1
This monitoring visit
An alleged failure by the registered manager to implement the safeguarding policy following concerns raised regarding staff practice. An internal Inspection report for children’s home - monitoring visit: 1257796 2 investigation is ongoing in relation to this matter.
p.1
This monitoring visit
Insufficient action taken following a child stating that she felt bullied by a teacher.
p.2
This monitoring visit
A lack of clear guidance regarding implementation of some children’s behaviour management risk plans.
p.2
This monitoring visit
A lack of effective strategies to reduce the risk of recurrences following some incidents of children’s self-harm.
p.2
This monitoring visit
The senior management has suspended the registered manager following an alleged failure to follow the organisation’s safeguarding policy on 1 January 2018. This failure does not sufficiently safeguard children. An internal investigation is underway. The interim management arrangements have been defined and the assistant manager is acting as manager, with four senior managers providing separate daily support to the acting manager during the week. However, due to these being very recent arrangements, this may have the potential to lead to a lack of consistency in the daily support of the acting manager and senior managers’ oversight of all day- to-day operational matters. It is unclear what the impact of these management arrangements will be on the children and the staff.
p.2
This monitoring visit
The electric gate to the home is part of a strategy identified to reduce the high-risk assessment of the location of the home, to a moderate level of risk. The gate stopped working and as a result has been permanently open since 10 January 2018. This is of significant concern because the location risk assessment, reviewed in January 2018, identified that the local area immediate to the home was assessed as high risk. This is due to the home being located on a road with a national speed limit of 60mph, no street lighting and an intermittent and none maintained pavement with dykes that run along the road and near to significant water hazards, including tidal and none tidal rivers, with little to no lifesaving equipment along the riverbanks. An additional identified strategy to reduce the risk to children was the use of a grab bag which should contain items that the staff require to keep children safer.
p.2
This monitoring visit
However, a mobile phone and a 30 metre rope identified as required were missing from the bag. The management has failed to assess the risk of the broken electric gate and was unaware of the missing items in the grab bag. This failure places children and staff at considerable risk of harm. This serious risk is further evidenced by an incident on 22 January 2018, in which a child had to be physically restrained to prevent them from leaving the home when the fire alarm went off. The child is deemed as at high risk of suicide ideation and had attempted to run into the road with the intention of being hit by a car. In the child’s debrief following the physical intervention the child said that she wanted to run into the road to be killed. The failure of the home’s management to ensure that risk reduction strategies are implemented to reduce such risk places children at serious risk of harm.
p.2
This monitoring visit
The children’s risk management plans identify recent incidents, potential risks to children and contain some guidance for staff on risk reduction. However, some Inspection report for children’s home - monitoring visit: 1257796 3 children’s plans were not up to date and lacking in detail and clarity for staff. For example, some children’s risk assessments lacked clear guidance for staff around having ‘no bathroom privacy’ to keep the identified children safe. In addition, there was a failure to obtain written evidence from placing authorities of their agreement to such a strategy. There was a lack of consideration to alternative strategies or approaches and key-work sessions, identified as a means of risk reduction, are not consistently completed. These shortfalls fail to ensure that the staff are provided with clear guidance, all identified measures to reduce risk are implemented and alternative strategies are considered to keep the children safe and reduce incidents.
p.2
This monitoring visit
The staff do take action during incidents to keep the children safe. Some incidents identify steps to reduce recurrence. However, the inspectors found that there was a failure to consider reflection of the potential cause and a lack of proactive practice. For example, strategies identified to reduce risk include key-work sessions, room searches, staff to ensure that any items that children buy do not contain obvious self-harm objects and placing children on supervised spending. In discussions with the acting manager and the regional manager, it was acknowledged that not all possible strategies to reduce recurrence had been identified. This shortfall fails to ensure that all possible action is taken to keep children safe.
p.3
This monitoring visit
The inspectors identified an incident on 6 February 2018 at 11.30am, when a child alleged that she felt bullied by the teacher. The acting manager stated that she had held a meeting with all the children regarding engaging in education. However, there is no evidence of any documentation that a manager or the staff member has spoken to the specific child about feeling bullied. This failure does not ensure that children are effectively safeguarded.
p.3
This monitoring visit
The progress towards meeting the requirements and compliance notice from the previous inspection were not looked at on this occasion. The home is likely to be subject to further enforcement action.
p.3
Recent inspection history
Inspection date Inspection type Inspection judgement 26/07/2017 Full Requires improvement to be good Inspection report for children’s home - monitoring visit: 1257796 4
p.3
Statutory Requirements
This section sets out the actions that the registered person(s) must take to meet the Care Standards Act 2000, Children’s Homes (England) Regulations 2015 and the ‘Guide to the children’s homes regulations including the quality standards’. The registered person(s) must comply within the given timescales.
p.4
Requirement Due date
The leadership and management standard is that the registered person enables, inspires and leads a culture in relation to the children’s home that helps children to aspire to fulfil their potential and promotes their welfare. In particular, the standard in paragraph (1) requires the registered person to ensure that staff have the experience, qualifications and skills to meet the needs of each child, ensure that the home has sufficient staff to provide care for each child and use monitoring and review systems to make continuous improvements in the quality of care provided in the home. (Regulation 13 (1)(a)(b)(2)(c)(d)(h)) 02/03/2018*
p.4
Requirement Due date
The registered person must ensure that the requirements of the Regulatory Reform (Fire Safety) Order 2005 and any regulations made under it are complied with in respect of the home. (Regulation 25 (2)) 14/02/2018
p.4
Requirement Due date
The registered person must ensure that within 48 hours of the use of a measure of control, discipline or restraint in relation to a child in the home, the registered person, or a person who is authorised by the registered person to do so has spoken to the user about the measure and has signed the record to confirm it is accurate. (Regulation 35 (3)(b)(i)(ii)) 14/02/2018
p.4
Requirement Due date
The registered person must ensure that no measure of control is excessive, unreasonable or contrary to The Children’s Homes (England) Regulations. (Regulation 19 (1)) In particular, the registered person must ensure that children are not routinely deprived of their liberty without a court order, as set out in the ‘Guide to the children’s homes regulations including the quality standards’, page 50, paragraph 9.63. 14/02/2018
p.4
Requirement Due date
The registered person must notify HMCI and each other relevant person without delay if there is any incident relating to a child which the registered person considers to be 14/01/2018 Inspection report for children’s home - monitoring visit: 1257796 5 serious. (Regulation 40 (4)(e)) The registered person must review the appropriateness and suitability of the location of the premises used for the purposes of the children’s home at least once in each calendar year taking into account the requirement in regulation 12 (2)(c) (the protection of children standard). (Regulation 46 (1)) In particular, ensure that in the absence of a working electronic gate to the property a review takes place to identify additional and alternative methods to keep children and staff safe. 28/02/2018
p.4
Requirement Due date
The protection of children standard is that children are protected from harm and enabled to keep themselves safe. In particular, the standard in paragraph (1) requires the registered person to ensure that staff assess whether each child is at risk, taking into account information in the child’s relevant plans, and, if necessary, make arrangements to reduce the risk of any harm to the child. (Regulation 12 (2)(a)(i)) 09/03/2018
p.5
Requirement Due date
The protection of children standard is that children are protected from harm and enabled to keep themselves safe. In particular, the standard in paragraph (1) requires the registered person to ensure that staff take effective action whenever there is a serious concern about a child’s welfare. This is with particular regard to taking effective action and identifying new strategies to reduce the risk of recurrences following incidents. (Regulation 12 (2)(a)(vi)) 23/03/2018
p.5
Requirement Due date
The procedure to be followed in the event of an allegation of abuse or neglect must, in particular, provide for the prompt referral of an allegation about current or ongoing abuse or neglect in relation to the child to the placing authority and, if different, the local authority in whose area the home is located. (Regulation 34 (2)(b)) 09/03/2018
p.5
Requirement Due date
*These requirements are subject to a compliance notice.
p.5
Information about this inspection
The purpose of this visit was to monitor the action taken and the progress made by the children’s home since its last Ofsted inspection.
p.5
Information about this inspection
This inspection was carried out under the Care Standards Act 2000. Inspection report for children’s home - monitoring visit: 1257796 6
p.5
Children’s home details
Registered provider: Cambian Childcare Limited
p.6
Children’s home details
Registered provider address: Cambian Group, 4th Floor Waterfront Building, Chancellors Road, Hammersmith Embankment, London W6 9RU
p.6
Inspector
Natalie Burton, social care regulatory inspector Clive Lucas, social care regulatory inspector Inspection report for children’s home - monitoring visit: 1257796 7 to achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, further education and skills, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection.
p.6
Inspector
If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .
p.7
Inspector
Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .
p.7
Inspector
T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: http://www.gov.uk/ofsted
p.7
Discuss this inspection
Members compare notes on inspectors and inspections here. Join free to read and post.
Join the discussion