Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Social care interim inspection

Children's Home run by Potton Homes Limited in Thurrock

Inspected 2 Dec 2016 · published 4 Jan 2017 · URN 1226757

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Joanna Heller

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    2 Dec 2016

  • Inspectors verified

    Joanna Heller

  • Postcode verified

    SE3 9RD

  • URN verified

    1226757

Page 1 of 9
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+6Mostly positivemore positive than 25% of reports of this type

In line with other reports of this type.

Praiseeffectivelyimprovedpositivesafeeffectiveenjoycaringrobust
Criticismconcernsyet togapsnot alwaysdeclinedharmnot warmnot strengths

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings1264w+16
  • What needs to improve624w−17

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
9
Words of findings
1,884
longer than usual (typical 904)
Reading level
Hard
Flesch 45, typical 48
Average sentence
18 words
Next steps
8
typical 4
Hedged sentences
5%
“some”, “not always”, “most”…

Where the words go

Findings 53%What needs to improve 26%About the inspection 21%

Full report text

Inspection date 02/12/2016 Unique reference number 1226757 Type of inspection Interim Provision subtype Children’s home Registered provider Potton Homes Ltd

p.1

Registered provider address 1 Cresswell Park, Blackheath, London SE3 9RD

p.1

Responsible individual Susan Potton Registered manager Claire Sowden Inspector Joanna Heller

p.1

children and young people since the most recent full inspection

This home was judged good at the full inspection. At this interim inspection, Ofsted judges that it has sustained effectiveness .

p.2

children and young people since the most recent full inspection

At the last inspection, four requirements and five recommendations were set. The manager has made improvement in the vast majority of the shortfalls, but some have yet to be fully met. The children are effectively safeguarded. The care and support that they receive are child focused and individualised.

p.2

children and young people since the most recent full inspection

Staff vetting procedures, on occasion, fall below the level of good practice. Checks on an applicant’s identity and potential criminal history are undertaken. However, the records maintained do not always evidence that two suitable references have been obtained and verified, or that gaps in employment have been effectively identified and scrutinised. These shortfalls mean that information which potentially impacts on suitability may not be identified.

p.2

children and young people since the most recent full inspection

At the last inspection, the manager was asked to ensure that all staff undertake training in all relevant key areas. There has been some improvement. For example, all staff have completed training against child sexual exploitation and in first aid. However, some staff still require training in key areas, such as safeguarding, self- harm and food hygiene, in order to ensure that they are fully equipped to support children’s diverse needs.

p.2

children and young people since the most recent full inspection

All the staff are trained in the safe application of physical restraint and breakaway techniques, which are used only to keep the child or others safe. The manager reviews all incidents to ensure that their application is appropriate and to identify any patterns and trends. The staff develop effective, individualised de-escalation methods for particular children, for example hand massage, and these helpful tips are incorporated into the child’s individual management plan.

p.2

children and young people since the most recent full inspection

Medication arrangements in the home have improved since the last inspection. There are home remedy protocols in place that enable staff to administer emergency pain relief. However, they require further improvement to comply with good practice. Medication is securely stored in a room which can, in summer, become hot. This has the potential to impact on the efficacy of the medication. On occasion, staff who have yet to have their competence assessed have administered medication. However, the potential risk is reduced as the staff have undertaken basic medication training. Since the last inspection, a night-time drill has taken place. All the children now receive instruction on fire procedures upon admission. The building is generally well maintained. However, there are some specific aspects which require repair. For example, the fire door of one vacant bedroom requires repair, as do the french doors in the lounge and the door to the cabin. Furthermore, loose cabling and a

p.2

children and young people since the most recent full inspection

broken first-floor window restrictor present potential health and safety concerns. However, these specific shortfalls do not detract from the warm and homely environment. The children enjoy decorating the house ready for Christmas and planning their forthcoming birthday festivities.

p.3

children and young people since the most recent full inspection

The focus of the home is to provide short-term stability for children and identify and facilitate future care plans. Therefore, placements last from two weeks to two months. The children’s individual needs are well met and their outcomes promoted. They are encouraged to be fully involved in their future plans and transitions to new placements. Good placement planning and high staff supervision levels mean that no placement breakdowns have occurred. One social worker described how their child has experienced an ‘amazing transformation’ due to staff ‘providing wraparound support’. They described how a child had moved from being a very high-risk child, going missing several times a day, to one who has barely been out of the sight of the staff. One child reflected on their progress and how the staff have helped them mature and be safer, as a result. They said: ‘This place is so nice, it’s really lovely. The staff are lovely, and it has helped me to make changes. I

p.3

children and young people since the most recent full inspection

used to be so naughty – go missing, doing drugs and stuff – but now I don’t do any of it.’

p.3

children and young people since the most recent full inspection

The children develop really positive relationships with the staff, particularly given the short time that they stay at the home. One social worker said, ‘She was very choked up when she left.’ The children feel nurtured, safe and secure. One said: ‘Staff are lovely, bubbly, caring, and really listen to me and try to understand me. They’re there to comfort you, give you a hug, and give you everything you need.’

p.3

children and young people since the most recent full inspection

During their stay, the children are supported educationally by the staff from the organisation’s school. The majority begin to improve their engagement and attendance in education from their starting point. For example, one child described how their stay had been a turning point, re-engaging them in education after four years of disaffection and introducing them to the idea that learning is a joy. Staff are committed to making each child’s stay fun, giving them memorable moments to treasure. They are always on the go, doing plenty of activities such as trips to theme and amusement parks, the cinema and ice-cream parlours, and quieter activities such as walks or shopping.

p.3

children and young people since the most recent full inspection

Quality monitoring arrangements in the home have improved. Feedback from children and partner agencies is effectively sought. As a result, the manager has a greater insight into the areas for development. The standard of file management and case recording has improved. The children’s case files contain the required information and consents. This means that records are now sufficiently accurate and reliable to demonstrate the actions which staff take to support individual children, both on a day-to-day basis and in respect of specific incidents. The children’s individual risk assessments are detailed. They guide the staff effectively on the child’s needs and the actions to be taken to protect them better. Staff, in practice, provide a robust response to any incidents of missing from care or concerns around potential child sexual exploitation. The local police 'missing from care liaison officer described the service as ‘absolutely responsive’.

p.3

children and young people since the most recent full inspection

The home’s location risk assessment does not review the potential strengths and concerns of local community relationships and the potential impact upon children’s well-being. The assessment contains details of the railway station and crossing. However, the children’s individual risk assessments do not robustly link to it. For example, while it is referred to in the children’s missing from care risk assessments, the initial global assessment of risk developed at the time of placement does not examine the potential risks of a specific child in relation to their personal history. This means that potential risk may not be effectively identified and suitable management plans established. The impact is reduced, due to the high levels of supervision and the positive relationships established with the local train station and transport police, which have, in practice, ensured that any risky situations have been well managed.

p.4

children and young people since the most recent full inspection

While a number of requirements and recommendations have either been set at this inspection or remain from the previous inspection, this has not had a significant impact on the outcomes and experiences of the children. The home continues to make a positive difference. For example, one social worker described how, for one child, within the short placement time the staff have been able to identify ‘not just what their needs are, but exactly how to support them’. One child summed up their experience as: ‘I wouldn’t change a thing. The best thing about it is everyone who is here. This place is life-changing, for good.’

p.4

Information about this children’s home

The home is one of three children’s homes and a school that are privately owned by this company. It is registered to look after a maximum of three young people with emotional and behavioural difficulties or learning disabilities. This is a task-focused unit whose purpose is to assess the needs of the young people and identify what types of long-term placement and support services that are required.

p.5

Recent inspection history

Inspection date Inspection type Inspection judgement 20/07/2016 Full Good

p.5

Statutory requirements

This section sets out the actions which must be taken so that the registered person(s) meets the Care Standards Act 2000, Children’s Homes (England) Regulations 2015 and the ‘Guide to the children’s homes regulations including the quality standards’. The registered person(s) must comply within the given timescales.

p.6

Requirement Due date

The registered person must only employ an individual to work at the children’s home if the individual is mentally and physically fit for the purposes of the work that the individual is to perform; and full and satisfactory information is available in relation to the individual in respect of each of the matters in schedule 2. (Regulation 32(3)(c)(d))

p.6

Requirement Due date

In particular, ensure that suitable references are obtained and verified, and identify and explore gaps in employment. 28/01/2017

p.6

Requirement Due date

The registered person must ensure that all employees undertake appropriate continuing professional development. (Regulation 33(4)(a))

p.6

Requirement Due date

In particular, they must ensure that all staff undertake suitable training in safeguarding, food hygiene, countering self-harm and any other training that reflects the needs of the children placed. 02/01/2017

p.6

Requirement Due date

In order to meet the protection of children standard, with particular reference to health and safety, the registered person must ensure that: (2)(d) the premises used for the purposes of the home are designed, furnished and maintained so as to protect each child from avoidable hazards to the child’s health. (Regulation 12(2)(d))

p.6

Requirement Due date

In particular, ensure that all fire doors are maintained to make sure that their integrity is not compromised, that all windows above the ground floor to which children have access have suitable working window restrictors and that all cables are well secured. Furthermore, ensure that doors exiting the lounge and accessing the garden cabin both open and close effectively. 02/01/2017

p.6

Recommendations

To improve the quality and standards of care further, the service should take account of the following recommendation(s):  Make suitable arrangements to manage, administer and dispose of any medication. These are fundamentally the same sorts of arrangements as a good parent would make, but are subject to additional safeguards. (‘Guide to the children’s homes regulations including the quality standards’, page 35, paragraph 7.15) In particular, staff should ensure that medication is stored at a suitable temperature and that staff administer medication only when their competency to so has been assessed.  Continually and actively assess the risks to each child and the arrangements in place to protect them. When there are safeguarding concerns for a child, their placement plan, agreed between the home and their placing authority, must include details of the steps the home will take to manage any assessed

p.7

Recommendations

risks on a day-to-day basis. (‘Guide to the children’s homes regulations including the quality standards’, page 42, paragraph 9.5) In particular, staff should ensure that individual risk assessments for each child are sufficiently clear on the risk and actions to be taken to reduce risk, specifically in relation to the railway line.  When establishing the home, the registered person must ensure that it is suitably located so that children are effectively safeguarded and can access services to meet needs identified in their relevant plans (see regulations 12(2)(c)). Under regulation 46, the registered person should review the appropriateness and suitability of the location and premises of the home at least once a year. The review should include the identification of any risks and opportunities presented by the home’s location and strategies for managing these. (‘Guide to the children’s homes regulations including the

p.7

Recommendations

quality standards’, page 64, paragraph 15.1) In particular, review the potential strengths and impact upon children of local community relationships.

p.7

What the inspection judgements mean

At the interim inspection we make a judgement on whether the home has improved in effectiveness, sustained effectiveness, or declined in effectiveness since the previous full inspection. This is in line with the ‘Inspection of children’s homes: framework for inspection’.

p.8

Information about this inspection

Inspectors have looked closely at the experiences and progress of children and young people living in the children’s home. Inspectors considered the quality of work and the difference adults make to the lives of children and young people. They read case files, watched how professional staff work with children, young people and each other and discussed the effectiveness of help and care given to children and young people. Wherever possible, they talked to children, young people and their families. In addition the inspectors have tried to understand what the children’s home knows about how well it is performing, how well it is doing and what difference it is making for the children and young people who it is trying to help, protect and look after. This inspection focused on the effectiveness of the home and the progress and experiences of children and young people since the most recent full inspection.

p.8

Information about this inspection

This inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the Children’s Homes (England) Regulations 2015 and the ‘Guide to the children’s homes regulations including the quality standards’. the guidance, ‘Raising concerns and making complaints about Ofsted’, which is available from Ofsted’s website: www.gov.uk/government/organisations/ofsted . If you would like Ofsted to send you a copy of the guidance, please telephone 0300 123 4234, or email enquiries@ofsted.gov.uk .

p.8

Information about this inspection

achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children’s social care, and inspects the Children and Family Court Advisory and Support Service (Cafcass), schools, colleges, initial teacher training, work- based learning and skills training, adult and community learning, and education and training in prisons and other secure establishments. It inspects services for looked after children and child protection. If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 4234, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence , write to the Information Policy Team,

p.9

Information about this inspection

The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.9

Information about this inspection

Interested in our work? You can subscribe to our monthly newsletter for more information and updates: http://eepurl.com/iTrDn .

p.9

Information about this inspection

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.gov.uk/government/organisations/ofsted

p.9

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion