Social care · Children's home inspection (SCCIF)
Children's Home run by CareTech Community Services Limited in Staffordshire
Summary
What we read, and from where
Click a reading to see it highlighted in the report.
- Inspectors verified
Sandra King
- Previous overall verified
Good
- Postcode verified
EN6 1AG
- URN verified
SC005041
Deep dive
What this report says
In plain English
Join free to get a short, plain-English summary of any report.
Tone of the report
How positive or critical the inspectors' language is, from the words they chose. No AI involved.
In line with other reports of this type.
Markers show where typical reports of each grade sit.
How the report reads, start to finish
Every paragraph in order, sized by length. Tap one to see it on the page.
Strengths
Quoted from the report. Tap to see it on the page.
No standout praise found.
Concerns
Quoted from the report. Tap to see it on the page.
No strong criticism found.
Next steps
Quoted from the report. Tap to see it on the page.
No next steps set out.
Anatomy of the report
How the report is built, against others of the same type and grade.
- Pages
- 5
- Words of findings
- 62
- shorter than usual (typical 1387)
- Reading level
- —
- Average sentence
- 21 words
- Next steps
- 0
- typical 4
- Hedged sentences
- 0%
- “some”, “not always”, “most”…
Where the words go
Full report text
Unique reference number SC005041 Inspector Sandra King Type of inspection Interim Provision subtype Children's home
p.1
Registered person Daisybrook Limited Registered person address 5th Floor, Metropolitan House 3 Darkes Lane POTTERS BAR Hertfordshire EN6 1AG Responsible individual Mark O'Donnell Registered manager Ann Pritchard Date of last inspection 28/01/2015 2 of 5 Inspection date 27/03/2015
p.1
Previous inspection good Enforcement action since last inspection none
p.2
This inspection
This home was judged good at the last full inspection. At this interim inspection Ofsted judge that it has sustained effectiveness .
p.2
This inspection
Children and young people, with a range of disabilities and complex health needs, benefit from a sustained level of care during their time at the home. This is reflected in a parents comment: ‘The entire place has been absolutely fantastic. Home is amazing, I trust this place with (young person) more than I trust my own family with him.’ Children and young people seemed relaxed, safe and content during their stay.
p.2
This inspection
Since the last inspection, the group of young people has remained the same and they benefit from the stability of this home with its structures and routines. Observations and records demonstrate that the staff team are aware of the differing needs of young people and respond to these well. A social worker reported: ‘My working relationship with the home is a very positive one. They are very helpful and forthcoming with information and seek advice where this is necessary. They have a very good knowledge of the young person and appear to have a very good relationship with her’.
p.2
This inspection
The Registered Manager has responded promptly to the previous requirements and recommendations of the last inspection. She has worked hard to establish an improved evaluation of all the training and is more proactive in obtaining feedback from other professional and parents. She has introduced a new monitoring audit of missing local authority paperwork to ensure staff are able to meet the holistic needs of young people in accordance with their care plans.
p.2
This inspection
The home provides a safe and secure environment to vulnerable young people. Effective health and safety procedures are integral to the daily running of the home. Regular fire drills ensure both staff and young people are familiar with evacuation procedures. All of which ensures the home is a safe place for young people to live. 3 of 5 Young people continue to receive support from a staff group who know each young person well. Stable placements continue to exist because of the effective relationships staff have with young people. This ensures young people’s needs are met. 4 of 5
p.2
Information about this children’s home
This home is operated by a private organisation. It is registered to accommodate up to 10 young people with a range of disabilities, including physical disability, learning disability, and complex needs. It offers long term care and short-breaks.
p.4
Inspection date Inspection type Inspection judgement
28/01/2015 Full good 29/03/2014 Interim good progress 12/12/2013 Full outstanding 04/02/2013 Interim good progress Website: www.ofsted.gov.uk
p.4
Inspection date Inspection type Inspection judgement
This document may be reproduced in whole or in part for non-commercial educational purposes, provided that the information quoted is reproduced without adaptation and the source and date of publication are stated.
p.5
What inspection judgements mean
At the interim inspections we make a judgement on whether the home has improved in effectiveness, sustained effectiveness, or declined in effectiveness since the previous full inspection. This is in line with the Inspection of children’s homes: framework for inspection.
p.5
Information about this inspection
The purpose of this inspection is to assure children and young people, parents, the public, local authorities and government of the quality and standard of the service provided. The inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the relevant regulations and meets the national minimum standards.
p.5
Information about this inspection
The report details the main strengths, any areas for improvement, including any breaches of regulation, and any failure to meet national minimum standards. The judgements included in the report are made against the framework of inspection for children's homes.
p.5
Discuss this inspection
Members compare notes on inspectors and inspections here. Join free to read and post.
Join the discussion