Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by After Care (NW) Limited in Sefton

Inspected 13 Jan 2014 · published 15 Apr 2014 · URN SC051947

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Graham Robinson

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    13 Jan 2014

  • Inspectors verified

    Graham Robinson

  • URN verified

    SC051947

Page 1 of 5
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−11Mixedmore positive than 27% of reports of this type
OutstandingGoodRIInadequate

In line with other reports of this type.

Markers show where typical reports of each grade sit.

Praisepositivelygood progressstrongtrusting relationshipspositiveclearconsistent
Criticisminadequatefailednot metseriousdeclinedlack

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improveAbout the inspection positive critical
  • Findings742w−13
  • What needs to improve33w+13

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

Full report text

Unique reference number SC051947 Inspection date 13/01/2014 Inspector Graham Robinson Type of inspection Interim Provision subtype Children's home

p.1

Date of last inspection 13/08/2013 Website: www.ofsted.gov.uk

p.1

This document may be reproduced in whole or in part for non-commercial educational purposes, provided that the information quoted is reproduced without adaptation and the source and date of publication are stated.

p.2

Brief description of the service

The home is owned by a private organisation. It is registered to provide care for up to two young people with emotional and behavioural difficulties.

p.3

The inspection judgements and what they mean

Good progress The children’s home has demonstrated continued improvement in quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the large majority of recommendations that were raised at the previous inspection. Satisfactory progress The children’s home has maintained quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the majority of recommendations that were raised at the previous inspection. Inadequate progress The children’s home has failed to address one or more requirements and/or has not met the majority of recommendations and/or the quality of care and outcomes for children and young people have declined since the last full inspection.

p.3

Progress

Since their previous inspection the service is judged to be making satisfactory progress .

p.3

Progress

At the previous inspection in August 2013, the overall effectiveness of the home was judged to be adequate. Since then, satisfactory progress has been made.

p.3

Progress

The main issue affecting the home has been the lack of a permanent manager since the previous inspection. However, a permanent manager was recently appointed and the registration process has been completed and is due to be ratified.

p.3

Progress

Young people are given clear boundaries to operate within, which gives them a feeling of security. They have a full understanding of consequences should boundaries be broken. Despite challenges by young people, staff manage behaviour management issues well. This is based on good relationships that have been developed with young people, minimising the number of serious behaviour management issues taking place, within and outside the home.

p.3

Progress

The staff team works positively, rather than punitively with young people through difficult times. This develops and promotes strong, trusting relationships, allowing young people to form appropriate attachments to adults who act as good role models. Young people’s social and educational needs are recognised, planned for and being met.

p.3

Progress

Following an admission to the home, the current permanent staff team have had to be supplemented by the using the companies own casual staff along with some agency input. However, the permanent staff team is being increased with experienced staff drafted in from other homes operated by the owning company. This has resulted in a growth of permanent team members that are sufficient to meet the needs of young people.

p.4

Progress

Consultation levels between staff and young people are good with young people invited to contribute positively to certain aspects of daily life within the home. Examples include the choices made for food and activities, which reflect young people’s individual needs and interests. The culture developed within the home as a result of this, helps young people to feel valued and that their views and opinions do matter.

p.4

Progress

The new manager has reintroduced young people’s surveys, where they express their views and thoughts about the care they receive and their experiences of living in the home. Recent responses are positive. This is proving to be a useful addition to the on-going consultation processes within the home.

p.4

Progress

Two recommendations have been carried over from the previous inspection; one has been fully addressed. This has resulted in the reintroduction of a more formalised programme of staff supervision which is on-going.

p.4

Progress

The recommendation to ensure that all areas of the home are well maintained and decorated has not been addressed. This is in part, due to there being no manager on a regular basis. However, the new manager has had a programme of refurbishment agreed with her line manager and it is expected work will commence before the end of this month. This has resulted in the recommendation being repeated.

p.4

Progress

The period since the previous inspection has not been easy due to there being no permanent manager in place for any length of time. However, the care of young people has been consistent and the home is looking at the period until the next inspection as one of consolidation and time for overall improvements to be made. If this achieved, outcomes for young people should improve.

p.4

Recommendations

To improve the quality and standards of care further the service should take account of the following recommendation(s):

p.4

Recommendations

 ensure that all areas of the home are well maintained and decorated. (NMS 10.3)

p.4

About this inspection

The purpose of this inspection is to assure children and young people, parents, the public, local authorities and government of the quality and standard of the service provided. The inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the relevant regulations and meets the national minimum standards.

p.5

About this inspection

The report details the progress made by the provider since the last full inspection, identifies any further strengths, any areas for improvement and makes judgements as outlined in the Inspection of children’s homes – framework for inspection.

p.5

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion