Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Eagle Children’s Home in Wolverhampton

Inspected 13 Jan 2014 · published 13 Mar 2014 · URN SC356565

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Pete Hylton

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    13 Jan 2014

  • Inspectors verified

    Pete Hylton

  • URN verified

    SC356565

Page 1 of 5
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+16Mostly positivemore positive than 42% of reports of this type
OutstandingGoodRIInadequate

In line with other reports of this type.

Markers show where typical reports of each grade sit.

Praisegood progressimprovedknowledgeablepositivefeel saferobuststrengthsafe
Criticisminadequatefailednot metdeclinedharm

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improveAbout the inspection positive critical
  • Findings717w+16
  • What needs to improve49w0

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
5
Words of findings
763
shorter than usual (typical 1387)
Reading level
Hard
Flesch 48, typical 50
Average sentence
18 words
Next steps
1
typical 4
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 83%What needs to improve 6%About the inspection 12%

Full report text

Unique reference number SC356565 Inspection date 13/01/2014 Inspector Pete Hylton Type of inspection Interim Provision subtype Children's home

p.1

Date of last inspection 18/07/2013 Website: www.ofsted.gov.uk

p.1

This document may be reproduced in whole or in part for non-commercial educational purposes, provided that the information quoted is reproduced without adaptation and the source and date of publication are stated.

p.2

Brief description of the service

The children’s home is run by a private organisation and is registered to provide care and accommodation for two young people with emotional or behavioural difficulties.

p.3

The inspection judgements and what they mean

Good progress The children’s home has demonstrated continued improvement in quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the large majority of recommendations that were raised at the previous inspection. Satisfactory progress The children’s home has maintained quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the majority of recommendations that were raised at the previous inspection. Inadequate progress The children’s home has failed to address one or more requirements and/or has not met the majority of recommendations and/or the quality of care and outcomes for children and young people have declined since the last full inspection.

p.3

Progress

Since their previous inspection the service is judged to be making good progress .

p.3

Progress

This home was last inspected in July 2013 and was judged to be good. Four recommendations were made. The Registered Manager has ensured that appropriate actions have been taken to address these recommendations. This means that the quality of care has improved and the home is judged to be making good progress.

p.3

Progress

Since the last inspection, staff have attended refresher training in safeguarding and fire safety. As a result, the staff team are knowledgeable and competent in these areas of care practice. However, planned refresher training for restraint training did not take place within the prescribed timescales. As a result, there exists the potential for staff, who may not be fully up to date with their skills in this area, to restrain young people. Since the last inspection, there have been no incidents of restraint. As a result, there is no demonstrable impact, to date, on the outcomes for young people as a result of this shortfall. However, a recommendation has been made to ensure that all staff are trained in the home’s chosen method of restraint.

p.3

Progress

Where new staff have been employed, the Registered Manager has ensured that safe recruitment practices have been followed. As a result, young people are protected from access to individuals who may wish to cause them harm. Relationships between staff and young people are positive and built on mutual respect. A young person commented that ‘the staff are really nice’ and ‘I can open up to the staff and I feel comfortable being in the home.’ This results in a relaxing, comfortable and friendly atmosphere where young people feel safe.

p.3

Progress

The home continues to be safely maintained and regularly checked for defects. Swift action is taken where shortfalls are identified. The staff team follow clear and robust routines to ensure that the home is maintained to a high standard. A young person commented that ‘I think it is a really nice home.’ This is further enhanced through regular monitoring visits to the home by an independent person. Reports from these visits detail areas for improvement and areas of strength. Since the last inspection, the Registered Manager has ensured that these reports are kept in the home. As a result, young people, the staff team and placing authorities are able to review the monitoring arrangements. This results in a home that is open, transparent and committed to further improvement. Furthermore, the recommendation from the last inspection has been fully addressed.

p.4

Progress

The Registered Manager’s own quality assurance systems have improved. Regular reviews of the home’s operation ensure that all required areas are robustly checked and areas for improvement identified. Furthermore, these reports are sent to Ofsted as required. This ensures that the regulator is able to review the home’s progress and quality of service. As a result, the recommendation from the last inspection has been met. The home’s development plan clearly sets out the key priorities for the home over the coming months. This ensures that all staff know the objectives of the home and work collaboratively to achieve these.

p.4

Recommendations

To improve the quality and standards of care further the service should take account of the following recommendation(s):

p.4

Recommendations

 ensure that where children’s homes use restraint, staff are trained in the use of physical restraint techniques and only use the home’s agreed techniques. Training is regularly refreshed. (NMS 3.15)

p.4

About this inspection

The purpose of this inspection is to assure children and young people, parents, the public, local authorities and government of the quality and standard of the service provided. The inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the relevant regulations and meets the national minimum standards.

p.5

About this inspection

The report details the progress made by the provider since the last full inspection, identifies any further strengths, any areas for improvement and makes judgements as outlined in the Inspection of children’s homes – framework for inspection.

p.5

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion