Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Buckinghamshire County Council in Buckinghamshire

Inspected 18 Mar 2013 · published 16 May 2013 · URN SC032058

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Emeline Evans

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    18 Mar 2013

  • Inspectors verified

    Emeline Evans

  • URN verified

    SC032058

Page 1 of 6
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−9Mixedmore positive than 28% of reports of this type
OutstandingGoodRIInadequate

In line with other reports of this type.

Markers show where typical reports of each grade sit.

Praisepositiveeffectivegood progressrobustenjoycompromisedclearlyindependent
Criticisminadequatefailednot metseriousdeclinedconcernsyet to

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improveAbout the inspection positive critical
  • Findings939w−11
  • What needs to improve88w+13

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
6
Words of findings
1,021
shorter than usual (typical 1387)
Reading level
Hard
Flesch 44, typical 50
Average sentence
20 words
Next steps
4
typical 4
Hedged sentences
4%
“some”, “not always”, “most”…

Where the words go

Findings 83%What needs to improve 8%About the inspection 9%

Full report text

Unique reference number SC032058 Inspection date 18/03/2013 Inspector Emeline Evans Type of inspection Interim Provision subtype Children's home

p.1

Date of last inspection 04/12/2012 Website: www.ofsted.gov.uk

p.1

This document may be reproduced in whole or in part for non-commercial educational purposes, provided that the information quoted is reproduced without adaptation and the source and date of publication are stated.

p.2

Brief description of the service

This is a local authority children's home, providing residential care for up to six young people with emotional and behavioural difficulties.

p.3

The inspection judgements and what they mean

Good progress The children’s home has demonstrated continued improvement in quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the large majority of recommendations that were raised at the previous inspection. Satisfactory progress The children’s home has maintained quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the majority of recommendations that were raised at the previous inspection. Inadequate progress The children’s home has failed to address one or more requirements and/or has not met the majority of recommendations and/or the quality of care and outcomes for children and young people have declined since the last full inspection.

p.3

Progress

Since their previous inspection the service is judged to be making satisfactory progress .

p.3

Progress

The home was judged as good at the last full inspection in December 2012 with five statutory requirements and four recommendations for improvement. The home has maintained the good quality of care and outcomes for children and young people.

p.3

Progress

Since the last inspection, there has been a focus on building and developing the management team. An interim manager is now in post and the home is currently recruiting to fill the manager’s position. Ofsted have been notified of the management arrangements in the home. Staff are embracing recent changes with a positive attitude, and in turn, this is ensuring the home is maintaining its quality of care for the young people. Staff report that they are able to approach senior staff and management. They understand the roles and expectations placed on them and they are clearly passionate about promoting good outcomes for young people.

p.3

Progress

The manager has complied with the requirement made at the last inspection for the Statement of Purpose to be revised and this now includes all the information required by the Regulations. The children’s guide has recently been reviewed. This has resulted in a comprehensive guide that is appropriate to the young people presently accessing the service. The children’s guide now includes information on; how a child can contact Ofsted, the Children’s Rights Director and how to access an independent advocate.

p.3

Progress

The home was asked to improve the recording of any measure of control or restraint. New systems have been introduced to the home, which now ensure that all recording is in line with legislation. The system in place cross-references to all incidents in the home. This is a comprehensive system, of which staff are aware. It enables effective monitoring to take place.

p.4

Progress

Following the last inspection, the interim Manager has introduced a robust system to review records in line with Schedule 6 of the Children’s Homes Regulations 2001 on a regular basis. This results in a strategic overview and awareness of key issues in the home. Young people are fully involved during this monitoring process and their views and concerns are taken into account. The manager is also developing communication with and feedback from parents, this will inform service development and a holistic approach to be maintained.

p.4

Progress

The home has developed links with specialist services such as the Community Adolescent Mental Health Service (CAMHS) in order to meet the young people’s individual mental health needs. The home has started to pursue links with other health agencies such as sexual health services and services offering advice on smoking and alcohol use. However, the home recognises that this is to be explored further and managers are continuing to develop these links with the relevant professionals.

p.4

Progress

The manager is aware of the process of informing Ofsted of notifiable events and how this allows the regulator to engage in effective monitoring. The manager has cascaded this information down to senior staff so they are aware of the process to follow; this ensures that the appropriate people are notified immediately of any serious incident. Since the last inspection, there have not been any incidents which have required Ofsted to be informed.

p.4

Progress

A recommendation was set on the previous inspection in relation to the need to provide a homely environment that is well maintained and decorated. Some repairs are needed and the home is showing signs of wear and tear. Quotes have been obtained and maintenance work is due to commence with the aim of enabling young people to enjoy a safe and pleasant environment. This has yet to be completed; this recommendation has therefore been re-stated.

p.4

Progress

Regular fire drills have taken place to ensure staff and young people are fully aware of the action to take in the event of fire. However the emergency evacuation plan could not be located at the time of inspection, therefore is not easily accessible to staff and visitors. Staff confirm they are aware of the evacuation plan and this is communicated to young people and visitors; this ensures their safety is not compromised.

p.4

Progress

There is a commitment from the new management and all the staff within the home to further improve outcomes for young people and raise the standard of care. Some of the recommendations from the last inspection have not been met these have therefore been re-stated. Young people are positive about the support that they receive and say they have good relationships with staff.

p.4

Recommendations

To improve the quality and standards of care further the service should take account of the following recommendation(s):

p.5

Recommendations

 ensure the home develops good links with specialist health agencies, with particular reference to services providing advice on sexual health, smoking and alcohol use (NMS 6.9)  provide a comfortable and homely environment that is well maintained and decorated (NMS 10.3)  ensure there is an up-to-date emergency escape plan that all staff and children are familiar with (NMS 10.9)  ensure all staff receive annual appraisals. (NMS 19.6)

p.5

About this inspection

The purpose of this inspection is to assure children and young people, parents, the public, local authorities and government of the quality and standard of the service provided. The inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the relevant regulations and meets the national minimum standards.

p.6

About this inspection

The report details the progress made by the provider since the last full inspection, identifies any further strengths, any areas for improvement and makes judgements as outlined in the Inspection of children’s homes – framework for inspection.

p.6

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion