Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Cambian Childcare Limited in Manchester

Inspected 6 Mar 2013 · published 18 Apr 2013 · URN SC043972

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Louise Redfern

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    6 Mar 2013

  • Inspectors verified

    Louise Redfern

  • URN verified

    SC043972

Page 1 of 5
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+33Mostly positivemore positive than 55% of reports of this type
OutstandingGoodRIInadequate

In line with other reports of this type.

Markers show where typical reports of each grade sit.

Praisegood progresseffectivethriveextremelypositivefeel safewarmenjoy
Criticisminadequatefailednot metdeclined

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspection positive critical

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
5
Words of findings
639
shorter than usual (typical 1387)
Reading level
Hard
Flesch 39, typical 50
Average sentence
24 words
Next steps
0
typical 4
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 87%About the inspection 13%

Full report text

Unique reference number SC043972 Inspection date 06/03/2013 Inspector Louise Redfern Type of inspection Interim Provision subtype Children's home

p.1

Date of last inspection 28/11/2012 Website: www.ofsted.gov.uk

p.1

This document may be reproduced in whole or in part for non-commercial educational purposes, provided that the information quoted is reproduced without adaptation and the source and date of publication are stated.

p.2

Brief description of the service

This children's home is registered to provide care and accommodation for five young people with emotional and/or behavioural difficulties. The home is privately owned.

p.3

The inspection judgements and what they mean

Good progress The children’s home has demonstrated continued improvement in quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the large majority of recommendations that were raised at the previous inspection. Satisfactory progress The children’s home has maintained quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the majority of recommendations that were raised at the previous inspection. Inadequate progress The children’s home has failed to address one or more requirements and/or has not met the majority of recommendations and/or the quality of care and outcomes for children and young people have declined since the last full inspection.

p.3

Progress

Since their previous inspection the service is judged to be making good progress .

p.3

Progress

The home was judged as good at the last full inspection which took place in November 2012. There were two statutory requirements and one recommendation made as a result of the last inspection. All have been met.

p.3

Progress

Since the last inspection, the Registered Manager has ensured that all young people’s statutory looked after review minutes are held on their individual files in the home. The Registered Manager has also introduced a document, which is completed and signed by all parties at the time of the review which clearly states the recommendations from each statutory review. As a result, young people and the staff team are aware of the recommendations raised at the review. This ensures there is no delay in the action taken on recommendations raised at a review.

p.3

Progress

Since the last inspection, the Registered Manager has developed the home’s monitoring systems. This has ensured he has a stronger overview of the home and is able to identify and triggers or trends in behaviours of young people and put in place effective support.

p.3

Progress

The Registered Manager has ensured that the whole staff team receive regular supervision and has made improvements to the recording of supervisions. This means that individual staff members receive effective support. One staff member commented ‘I can go to the managers at any time and I get lots of support through supervisions.’

p.3

Progress

Young people continue to be extremely positive about the quality of care at the home. One young person commented, ‘I would score it 9 out of 10, I feel safe here and I know that the staff really care for me.’ Young people have made good progress in developing and sustaining appropriate relationships with their peers in the community, enjoying agreed overnight stays at their friends’ houses. As a result, they are developing and sustaining community links, which increases their confidence, self-esteem and broadens their horizons.

p.4

Progress

The accommodation continues to provide a pleasant, warm and comfortable home that young people enjoy living in, one young person commented ‘ever since I moved in I have felt like this is my home. The best thing about being here is feeling like someone cares about me.’ Recent renovations in the lounge area, including re- decoration and new sofas have improved the décor of the home.

p.4

Progress

The manager has, through meeting the requirements and recommendation raised at the last inspection, demonstrated good progress and an on-going commitment to improving the quality of care provided for the young people. Young people continue to thrive in the placement are engaged in education and maintaining good levels of attendance in their individual educational placements.

p.4

About this inspection

The purpose of this inspection is to assure children and young people, parents, the public, local authorities and government of the quality and standard of the service provided. The inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the relevant regulations and meets the national minimum standards.

p.5

About this inspection

The report details the progress made by the provider since the last full inspection, identifies any further strengths, any areas for improvement and makes judgements as outlined in the Inspection of children’s homes – framework for inspection.

p.5

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion