Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Social care · Children's home inspection (SCCIF)

Children's Home run by Quality Protects Children Ltd in Liverpool

Inspected 30 Jan 2013 · published 13 Mar 2013 · URN SC025420

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Chris Scully

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection datesingle source

    30 Jan 2013

  • Inspectors verified

    Chris Scully

  • URN verified

    SC025420

Page 1 of 6
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

−34Criticalmore positive than 16% of reports of this type
OutstandingGoodRIInadequate

In line with other reports of this type.

Markers show where typical reports of each grade sit.

Praisegood progresswarmstrengthssafeimprovingindependentclearly
Criticisminadequatefailednot metdeclinedinconsistencieslacknot clearyet to

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsWhat needs to improveAbout the inspection positive critical
  • Findings828w−37
  • What needs to improve131w+20

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
6
Words of findings
954
shorter than usual (typical 1387)
Reading level
Hard
Flesch 48, typical 50
Average sentence
20 words
Next steps
3
typical 4
Hedged sentences
4%
“some”, “not always”, “most”…

Where the words go

Findings 78%What needs to improve 12%About the inspection 9%

Full report text

Unique reference number SC025420 Inspection date 30/01/2013 Inspector Chris Scully Type of inspection Interim Provision subtype Children's home

p.1

Date of last inspection 29/06/2012 Website: www.ofsted.gov.uk

p.1

This document may be reproduced in whole or in part for non-commercial educational purposes, provided that the information quoted is reproduced without adaptation and the source and date of publication are stated.

p.2

Brief description of the service

This is a children's home for six young people of either gender. The home cares for young people with emotional and behavioural difficulties and drug or alcohol dependence, who come from many parts of England and Wales. The home is one of several owned by a private company.

p.3

The inspection judgements and what they mean

Good progress The children’s home has demonstrated continued improvement in quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the large majority of recommendations that were raised at the previous inspection. Satisfactory progress The children’s home has maintained quality of care and outcomes for children and young people and where appropriate has addressed all requirements and the majority of recommendations that were raised at the previous inspection. Inadequate progress The children’s home has failed to address one or more requirements and/or has not met the majority of recommendations and/or the quality of care and outcomes for children and young people have declined since the last full inspection.

p.3

Progress

Since their previous inspection the service is judged to be making satisfactory progress .

p.3

Progress

The home was last inspected on the 29 June 2012. The overall effectiveness was judged to be good. Following the inspection one statutory requirement relating to fire precautions was raised along with five recommendations. These related to maintenance, behaviour management risk assessments, missing from care risk assessments, staff supervision and key worker records.

p.3

Progress

Young people's safety and well-being is enhanced. This is because the home has liaised with the fire authority regarding wedging open the fire doors. Self-closing devices have been fitted to a number of doors, which now close automatically if the fire alarm is activated. Repairs have been carried out to the fire escape and flat roof to ensure they are safe and appropriately maintained. Consequently, any fire would be contained and young people can evacuate the building quickly and safely. Unauthorised persons are not able to gain access to the property because the lock on the front door has been repaired. There remains some damage to the door but this is to be replaced. The home has made appropriate progress in improving the recording practice such as the behaviour and missing from care risk assessments. This means staff have a clearer understanding of the behaviours and vulnerabilities of the young people.

p.3

Progress

They are able to implement the missing from care procedures and alert police and others as to where some young people may be, such as trying to get back to their home area. This means young people are usually quickly located and return home safely.

p.4

Progress

However, inconsistencies remain in the recording of young people's key worker sessions. This includes a lack of clarity within the information such as references to inappropriate language. This does not provide a clear picture of the discussion with the young people or their comments. Young people are not signing the record, which means they are not able to take ownership of the discussion or the targets set. Therefore, this part of the recommendation has not been met.

p.4

Progress

Staff are now afforded regular opportunities for professional supervision with the Registered Manager or other senior staff. This means they are able to discuss what is going well and any areas for development. Staff continue to meet regularly as a team which means they are all aware of the young people's needs and any changes to their circumstances.

p.4

Progress

Monitoring of the home is appropriate and provides an insight into what the home does well and any areas for improvement. However, Ofsted has yet to receive copies of the home’s Regulation 34 reports. This is an oversight by the home and does not impact upon the care provided. Also reports by the independent person do not show how they consult with social workers or the families of young people. Therefore, it is not clear as to how their views influence the improvement and development of the home.

p.4

Progress

Young people say everything is going 'ok' for them. Young people new to the home say everything is fine and that they know they can talk to staff about anything. The home is warm and welcoming and young people say they have had a say in the décor and new art work. Family members say they are pleased with the care provided. The home has initiated a compliments book which demonstrates how they are working well with other professionals. For example, Youth offending teams say, 'staff identify the young people's strengths and attempt to build upon them to increase young people's self-esteem and sense of identity.' Social worker's say staff help young people to set 'realistic boundaries and stick to them.’

p.4

Recommendations

To improve the quality and standards of care further the service should take account of the following recommendation(s):

p.4

Recommendations

 ensure that reports reviewing the quality of care under Regulation 34 are supplied to Ofsted at six monthly intervals within 28 days of completion (Children Act 1989 Guidance and Regulations Volume 5, statutory guidance, paragraph 3.14)  ensure information is recorded clearly and in a way that will be helpful to young people when they access their files now or in the future; with particular reference to their key worker records (NMS 22.5)  ensure the visit of the home carried out under Regulation 33 includes the relevant checks set out in regulations and guidance; with particular reference to ensuring that the young people’s families and social workers are consulted. (NMS 21.7)

p.4

About this inspection

The purpose of this inspection is to assure children and young people, parents, the public, local authorities and government of the quality and standard of the service provided. The inspection was carried out under the Care Standards Act 2000 to assess the effectiveness of the service and to consider how well it complies with the relevant regulations and meets the national minimum standards.

p.6

About this inspection

The report details the progress made by the provider since the last full inspection, identifies any further strengths, any areas for improvement and makes judgements as outlined in the Inspection of children’s homes – framework for inspection.

p.6

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion