Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Schools & FE · Independent school inspection

Tarbiyyah Primary School

Inspected 15 Oct 2012 · published 12 Nov 2012 · URN 137273

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection date verified

    15 Oct 2012

  • Name on report verified

    Tarbiyyah Primary School

  • URN verified

    137273

Page 1 of 5
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+64Positivemore positive than 40% of reports of this type

In line with other reports of this type.

Praiseindependentgood progresssecure

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings229w+43
  • What needs to improve18w+50

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
5
Words of findings
247
shorter than usual (typical 2265)
Reading level
Very hard
Flesch 25, typical 38
Average sentence
21 words
Next steps
2
typical 4
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 26%What needs to improve 2%About the inspection 72%

Full report text

Tarbiyyah Primary School Independent school progress monitoring inspection report

p.1

DfE registration number 313/6003 Unique Reference Number (URN) 137273 Inspection number 408784 Inspection dates 15 October 2012 Reporting inspector Fatiha Maitland achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children's social care, and inspects the Children and Family Court Advisory Support Service (Cafcass), schools, colleges, initial teacher training, work-based learning and skills training, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection. If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may reuse this information (not including logos) free of charge in any format or medium, under

p.1

the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ , write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk .

p.2

To receive regular email alerts about new publications, including survey reports and school inspection reports, please visit our website and go to ‘Subscribe’.

p.2

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.ofsted.gov.uk No. 090137 Independent school progress monitoring inspection report

p.2

Purpose and scope of the inspection

This inspection was carried out by Ofsted under Section 162A of the Education Act 2002, as amended by schedule 8 of the Education Act 2005.

p.3

Purpose and scope of the inspection

The inspection was conducted at the request of the Registration Authority for independent schools in order to monitor the progress the school has made in implementing its action plan following the previous inspection.

p.3

Information about the school

Tarbiyyah Primary is an independent Islamic school situated in Cranford in the London Borough of Hounslow. It opened in September 2011 and is registered to provide an education for 20 boys and girls aged five to six years. There are currently 24 pupils on roll, including 10 children who are in the Early Years Foundation Stage in the Reception class. None is in receipt of government funding. Most pupils are of Pakistani heritage. None has a statement of special educational needs and very few learn English as an additional language.

p.3

Information about the school

The school is run by the Heathrow Muslim Community Centre. The school’s aim is ‘to cultivate and educate Muslim children with the knowledge and life skills required to become positive contributors and examples of excellence in their communities and the society’.

p.3

Information about the school

The school was first inspected in March 2012 when it was found to provide a good quality of education and all the requirements for registration were met in respect of the group of four pupils in Year 1 then on roll, and in respect of its registration at that time.

p.3

Context of the inspection

The school had applied early in 2012 to the Department for Education for a material change to extend its age range and the number of pupils on roll for which it was registered. The consideration of this proposal was made part of the March 2012 inspection. The school proposed to admit up to 30 pupils, including 10 children in the Early Years Foundation Stage, and to introduce a Year 2 class of six- and seven– year-olds. The material change was not recommended for approval because the school did not have the classroom space and appropriate facilities to meet the regulations should the additional pupils have been admitted.

p.3

Context of the inspection

The school drew up an action plan for improvement in response to the report. This was evaluated in August 2012 and judged to be satisfactory, subject to satisfactory implementation.

p.3

Context of the inspection

This is the report of the first progress monitoring visit undertaken in order to evaluate the progress made by the school in implementing its action plan. Independent school progress monitoring inspection report

p.3

action plan

The inspection of March 2012 found that the intended Early Years Foundation Stage classroom was not large enough for the proposed number of children. Furthermore, if the proposed additional number were to be admitted, staff and pupils would not have had access to separate washroom facilities as required.

p.4

action plan

In response, the school planned to extend the classroom accommodation and to provide additional washrooms. As a result of implementing its plan, the school now occupies a further part of the ground floor of the building in which it operates. The proprietor has refurbished this provision so that it is suitable for use. The classroom provision now suitably accommodates 10 children in Reception Year in addition to accommodating the proposed 20 Key Stage 1 pupils. Standards of decoration, ventilation, heating, lighting and flooring all meet requirements. Risk assessments on the premises, activities and resources are thorough, ensuring that pupils, including children in the Early Years Foundation Stage, are safe and secure. The washroom facilities have been extended and are now sufficient for the staff and the proposed number of pupils including children in the Early Years Foundation Stage. The learning

p.4

action plan

environment is well organised and conducive to learning.

p.4

Compliance with regulatory requirements

The school has made good progress and now meets all regulatory requirements. Independent school progress monitoring inspection report

p.4

School details

Number on roll (full-time pupils) Boys: 8 Girls: 16 Total: 24

p.5

School details

Number on roll (part-time pupils) Boys: 0 Girls: 0 Total: 0

p.5

Address of school

654 Bath Road Cranford Middlesex TW5 9TN

p.5

Address of school

Email address schooloffice@tarbiyyah.co.uk

p.5

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion