Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 18 Jul 2012

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Mark Phillips

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Mark Phillips

  • Postcode verified

    B21 9AR

Page 1 of 2
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

0Mixedmore positive than 24% of reports of this type

In line with other reports of this type.

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspection positive critical

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
2
Words of findings
34
shorter than usual (typical 1049)
Reading level
—
Average sentence
17 words
Next steps
0
typical 5
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 5%About the inspection 95%

Full report text

Aviation House 125 Kingsway London WC2B 6SE T 0300 123 1231 F 020 7421 6855 enquiries@ofsted.gov.uk www.ofsted.gov.uk

p.1

Dr EV Insch OBE Headteacher King Edward VI Handsworth School Rose Hill Road Handsworth Birmingham B21 9AR

p.1

Ofsted 2012–13 good practice survey inspection programme: music

Thank you for your hospitality and cooperation, and that of your staff and students, during my visit on 7 July 2012 to look at work in music and particularly the impact of your partnership work with Birmingham Contemporary Music Group (BCMG).

p.1

Ofsted 2012–13 good practice survey inspection programme: music

The visit provided valuable information which will contribute to our national evaluation and reporting, including the forthcoming report on music education partnerships (commissioned as part of the National Plan for Music Education). Published reports are likely to list the names of the contributing institutions but individual institutions will not be identified in the main text without their consent.

p.1

Ofsted 2012–13 good practice survey inspection programme: music

The evidence used to inform the judgements included: interviews with staff and students; scrutiny of relevant documentation; analysis of students’ work; a discussion with music professionals from BCMG and Birmingham City University (BCU); and observation of two class music lessons and a group instrumental lesson.

p.1

Features of good practice

 The school has been involved in partnership working with BCMG since 2005. A series of composition projects has involved BCMG performers, renowned composers, A level and GCSE students, and school teachers working together. Further partnership has involved academics from BCU in supporting and evaluating the projects.  Fundamental to the success of the partnership has been the meticulous manner in which the projects have been planned and evaluated by all parties. In the latest project, Listen, Compose, Perform, one third of the project time was devoted to the learning needs and professional development of the participating adults. Consequently, this partnership has played a significant part in improving the musical and educational understanding of professional musicians, teachers and academics. As a direct consequence of the Electro-Sequenza project, your head of music has developed a unit of work that is taught solely by school staff as part of

p.1

Features of good practice

the GCSE music course.  Teaching composition through the study and performance of contemporary music styles has brought huge benefits to the breadth and depth of students’ musical understanding. With nearly one in every four girls taking GCSE music, standards in composing have improved over the past six years. The average mark for the composing paper has risen from 80% when the partnership started to 93% in 2011. The quality of students’ preparatory work, as well as their final compositions, is excellent. At A level, students’ understanding of contemporary music styles has extended through participation in regular young composers’ workshops out of school.  It is important to note that these projects have not stood alone, divorced from other aspects of the school’s work in music. Teaching and learning seen during the visit, such as in the dhol drumming group, reveal a highly musical approach with excellent modelling, emphasis on aural

p.2

Features of good practice

development, and attention to detail. In the Year 10 GCSE lesson, a series of short practical activities helped students to deconstruct and memorise the complexities of a Schoenberg tone-row so well that when they returned to their desks to complete written tasks, they had thoroughly internalised the music and were able to recall it in excellent detail.  While partnerships with BCMG and other organisations have brought many benefits, the success of music at King Edward VI Handsworth School is underpinned by a well-organised and generous curriculum entitlement for all students. The Key Stage 3 scheme of work covers a good range of styles, traditions and genres, and individual units show clearly the range of skills and knowledge that teachers are expected to cover. There is, however, less consideration given to the standards and progress expected by the end of Year 9, particularly given girls’ high attainment overall when

p.2

Features of good practice

they join in Year 7. At present, too much emphasis is on national expectations for students across all schools.

p.2

Areas for further development, which we discussed, include:

 making clearer the high standards and progress expected of students by the end of Year 9  continuing to share the school’s good practice in music with other schools locally, and making partnerships with other good practice schools nationally.

p.2

Areas for further development, which we discussed, include:

I hope that these observations are useful as you continue to develop music in the school.

p.2

Areas for further development, which we discussed, include:

As I explained previously, a copy of this letter will be published on the Ofsted website.

p.2

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion