Schools & FE · Independent school inspection
Brookland School
Summary
What we read, and from where
Click a reading to see it highlighted in the report.
- Inspection date verified
9 Nov 2011
- Name on report verified
Elland House School
- URN verified
131751
Deep dive
What this report says
In plain English
Join free to get a short, plain-English summary of any report.
Tone of the report
How positive or critical the inspectors' language is, from the words they chose. No AI involved.
In line with other reports of this type.
How the report reads, start to finish
Every paragraph in order, sized by length. Tap one to see it on the page.
Strengths
Quoted from the report. Tap to see it on the page.
No standout praise found.
Concerns
Quoted from the report. Tap to see it on the page.
No strong criticism found.
Next steps
Quoted from the report. Tap to see it on the page.
What the report dwells on
Topics by how often they come up, coloured by how they are described. Open one for an example.
Anatomy of the report
How the report is built, against others of the same type and grade.
- Pages
- 5
- Words of findings
- 243
- shorter than usual (typical 2265)
- Reading level
- Hard
- Flesch 35, typical 38
- Average sentence
- 20 words
- Next steps
- 2
- typical 4
- Hedged sentences
- 0%
- “some”, “not always”, “most”…
Where the words go
Full report text
Elland House School Independent school progress monitoring inspection report
p.1
DfE registration number 353/6013 Unique Reference Number (URN) 131751 Inspection number 385629 Inspection dates 9 November 2011 Reporting inspector Peter Toft achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children's social care, and inspects the Children and Family Court Advisory Support Service (Cafcass), schools, colleges, initial teacher training, work-based learning and skills training, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection. If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may copy all or parts of this document for non-commercial educational purposes, as long as you
p.1
give details of the source and date of publication and do not alter the information in any way. To receive regular email alerts about new publications, including survey reports and school inspection reports, please visit our website and go to ‘Subscribe’. Royal Exchange Buildings St Ann’s Square Manchester M2 7LA
p.2
T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.ofsted.gov.uk No. 090137 Independent school progress monitoring inspection report
p.2
Purpose and scope of the inspection
This inspection was carried out by Ofsted under Section 162A of the Education Act 2002, as amended by schedule 8 of the Education Act 2005. 1,2
p.3
Purpose and scope of the inspection
The inspection was conducted at the request of the Registration Authority for independent schools in order to monitor the progress the school has made in implementing its action plan following the previous inspection.
p.3
Information about the school
Elland House School is part of the`Timeout’ company which provides care in a number of children’s homes in England. Most of the school’s pupils live in the company’s children’s homes; some are placed at the school by local authorities. The school is located in a two-storey building on a small industrial estate in a residential area of Oldham; it was relocated in September 2009 from its previous site in Ripponden. All pupils have emotional, social and behavioural difficulties and two have statements of special educational needs. Most have experienced gaps in their education caused by absence and/or exclusion from their previous schools. The school is registered for up to 15 pupils aged 11 to 16 years. It has applied to the Department for Education to increase this number to 20 pupils. Currently, four pupils are on the school’s roll full time; a further three, who are over 16 years old, are taught part time.
p.3
Context of the inspection
The school was last inspected in November 2010 to monitor the progress in implementing the post-inspection action plan which had been accepted in June 2010 and was written following the previous full inspection of January 2010. The November 2010 inspection also evaluated the request for a material change to increase the school’s registration capacity to admit up to 20 pupils. Three of the four regulatory failures had been rectified by the time of the November monitoring inspection but the school had not improved the washroom facilities as required. The Department was advised that approval of the school’s application for the material change to increase its registration capacity was recommended once the proprietor was able supply firm evidence that the washroom improvements had been carried out satisfactorily, the school having satisfied all other conditions for recommendation of the material change. This is the second monitoring visit to evaluate progress in
p.3
Context of the inspection
implementing the action plan; it also completes the evaluation of the school’s application for the material change.
p.3
Context of the inspection
1 www.opsi.gov.uk/acts/acts2002/ukpga_20020032_en_14#pt10-ch1-pb4-l1g162 2 www.opsi.gov.uk/ACTS/acts2005/ukpga_20050018_en_15#sch8 Independent school progress monitoring inspection report
p.3
action plan
The progress monitoring inspection of November 2010 found that washroom facilities had not been upgraded in line with the school’s action plan. They were insufficient to meet the needs of 20 pupils as proposed in the application to increase the school’s registration capacity and staff and pupils did not have the required separate facilities. The school had identified a location for new facilities and had secured funding to have them built. The owner of the premises had agreed to this building work, providing that the school funded it in full; however, the building work had not begun.
p.4
action plan
Since the inspection of November 2010, the building work has been completed to a satisfactory standard and is kept clean and hygienic. The completion is within the time-scale set out in the school’s action plan. The school now has separate washroom provision for boys and girls, separate provision for staff and visitors and appropriate facilities for those with disabilities. The washroom provision is now sufficient for up to 20 pupils. The proposed material change to accept this number of pupils can now be recommended.
p.4
Compliance with regulatory requirements
The school has made good progress and now meets all regulatory requirements. Independent school progress monitoring inspection report
p.4
Type of school
Special day school for pupils with social, emotional and behavioural difficulties
p.5
Type of school
Number on roll (full-time pupils) Boys: 2 Girls: 2 Total: 4
p.5
Type of school
Number on roll (part-time pupils) Boys: 2 Girls: 1 Total: 3
p.5
special educational needs
Number of pupils who are looked after Boys: 3 Girls: 4 Total: 7
p.5
Address of school
Unit 7 Roman Road Royton Oldham OL2 5PJ Telephone number 0161 628 3600
p.5
Discuss this inspection
Members compare notes on inspectors and inspections here. Join free to read and post.
Join the discussion