Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Schools & FE · Independent school inspection

Ayesha Siddiqa Girls School

Inspected 12 Sept 2011 · published 3 Oct 2011 · URN 135155

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspection date verified

    12 Sept 2011

  • Name on report verified

    Ayesha Siddiqa Girls’ School

  • URN verified

    135155

Page 1 of 6
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+64Positivemore positive than 40% of reports of this type

In line with other reports of this type.

Praiseindependentgood progresssecure

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

FindingsAbout the inspectionWhat needs to improve positive critical
  • Findings226w+43
  • What needs to improve18w+50

Strengths

Quoted from the report. Tap to see it on the page.

No standout praise found.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
6
Words of findings
244
shorter than usual (typical 2265)
Reading level
Hard
Flesch 33, typical 38
Average sentence
20 words
Next steps
2
typical 4
Hedged sentences
0%
“some”, “not always”, “most”…

Where the words go

Findings 16%What needs to improve 1%About the inspection 83%

Full report text

Ayesha Siddiqa Girls’ School Independent school progress monitoring inspection report

p.1

DfE registration number 307/6388 Unique Reference Number (URN) 135155 Inspection number 384825 Inspection date 12 September 2011 Reporting inspector Michèle Messaoudi achieve excellence in the care of children and young people, and in education and skills for learners of all ages. It regulates and inspects childcare and children's social care, and inspects the Children and Family Court Advisory Support Service (Cafcass), schools, colleges, initial teacher training, work-based learning and skills training, adult and community learning, and education and training in prisons and other secure establishments. It assesses council children’s services, and inspects services for looked after children, safeguarding and child protection. If you would like a copy of this document in a different format, such as large print or Braille, please telephone 0300 123 1231, or email enquiries@ofsted.gov.uk . You may copy all or parts of this document for non-commercial educational purposes, as long as you

p.1

give details of the source and date of publication and do not alter the information in any way. To receive regular email alerts about new publications, including survey reports and school inspection reports, please visit our website and go to ‘Subscribe’. Royal Exchange Buildings St Ann’s Square Manchester M2 7LA

p.2

T: 0300 123 1231 Textphone: 0161 618 8524 E: enquiries@ofsted.gov.uk W: www.ofsted.gov.uk No. 090137 Independent school progress monitoring inspection report

p.2

Purpose and scope of the inspection

This inspection was carried out by Ofsted under Section 162A of the Education Act 2002, as amended by schedule 8 of the Education Act 2005.

p.3

Purpose and scope of the inspection

The inspection was conducted at the request of the Registration Authority for independent schools in order to monitor the progress the school has made in implementing its action plan following the previous inspection.

p.3

Information about the school

Ayesha Siddiqa Girls’ School is an independent secondary school for Muslim girls. The school opened in April 2007 and is registered to admit up to 200 pupils between the ages of 11 and 16 years. The school has expanded since its first inspection in 2008 to admit pupils in Years 10 and 11. There are currently 119 pupils on roll. The pupils are of diverse heritages and come from various parts of London. The vast majority are either bilingual or are at an advanced stage of learning English as an additional language. None has a statement of special educational needs. The school is situated in the centre of Southall, in the London Borough of Ealing, and normally occupies two floors of an Islamic Centre. An extensive building and refurbishment programme for the entire building meant that the school operated from a reduced number of rooms on one floor during the academic year 2010 to 2011. From September 2011,

p.3

Information about the school

the school will occupy the second and third floors of the building. The proprietors run the school as a charitable trust with a governing body and aim to provide an education that is well balanced between National Curriculum subjects and religious teachings according to Islam.

p.3

Context of the inspection

The school had an inspection in March 2011 when it was judged to provide a satisfactory quality of education despite shortcomings in curriculum planning. However, its provision for safeguarding pupils’ welfare, health and safety was found to be inadequate and the school did not meet a number of the regulations for independent schools relating to the quality of provision for education, welfare and safety of the pupils, arrangements for safeguarding the pupils, suitability of the premises and accommodation and quality of information provided for parents and others. The school submitted an action plan on 26 May 2011 that was accepted by Ofsted on 22 June 2011. This is the first visit to the school to follow up its progress in implementing its action plan.

p.3

action plan

The inspection of March 2011 reported that the scheme of work for physical education (PE) was in place but the programme was not well planned or sufficiently regular for Key Stage 4 pupils. The school planned to revise the scheme of work for Independent school progress monitoring inspection report PE in Key Stage 4 to provide a wider range of physical activities, to increase the time allocated to PE in Key Stage 4, to make arrangements to use a local sports centre and to purchase additional PE equipment. As a result of implementing the plan, the school provides a suitably planned and varied programme of PE in Key Stage 4. The schemes of work clearly indicate how pupils will progress in their understanding and skills. Key Stage 4 pupils now have two weekly sessions of PE in a local sports centre pending the imminent completion of a new on-site PE hall. An adequate range of resources has been purchased to support pupils’ physical development. This

p.3

action plan

The last inspection reported that there was no planned provision for history in Key Stage 4. The school planned to prepare long-, medium- and short-term plans for history in Key Stage 4 and to order appropriate resources to support pupils’ learning. As a result of these improvements, the provision for history is suitably planned in Key Stage 4, based on commercial schemes of work that indicate continuity of study from Year 10 to Year 11. Teaching is supported by a suitable range of printed and audiovisual resources. This requirement is now met.

p.4

action plan

In the last inspection, the school was judged to make inadequate provision for safeguarding pupils’ welfare, health and safety owing to a lack of rigour in recruitment procedures and insufficient regard to the current guidance on health and safety in schools. Checks on the suitability of some staff had not been undertaken, or not soon enough. Hazards included unrestrained windows on the upper floors, trailing wires and unchecked portable appliances. The school planned to review its recruitment procedures and all the personnel files, as well as its procedures for minimising risks. As a result of implementing its action plan, the school has suitable risk assessments of the premises and practical activities, and robust recruitment procedures. It has remedied all of the hazards and deficiencies mentioned in the last report.

p.4

action plan

The last inspection reported that the school did not have a written accessibility plan to comply with the requirements of the Equality Act 2010. The school has prepared a three-year plan that indicates how it will ensure that all pupils, staff and visitors have access to the premises, curriculum and information. This requirement is now met.

p.4

action plan

The last inspection found that suitability checks had not been carried out on a number of staff and that some checks had not been undertaken soon enough. It also found that although the school had a single central register, it was incomplete because not all staff and governors were included in it. The school planned to review its recruitment procedures, the wording of the employment contract and the layout of the central register to ensure that correct recruitment procedures would be followed. It also planned to update the single central register. As a result of implementing its action plan, the school has rectified all the deficiencies reported in the last inspection. It can now demonstrate that no employment is confirmed until all the required checks have been satisfied. Independent school progress monitoring inspection report In the last inspection, the school did not meet all the regulations in respect of the

p.4

action plan

premises. It did not have suitable washroom facilities for staff. Some areas of the building were not suitably clean or tidy. There were no arrangements for safe outside play. The school planned to provide the missing washing facilities as part of the refurbishment programme, to recruit additional cleaners and to have the premises cleaned twice a day. The school planned to timetable longer lunch breaks and to employ additional lunchtime supervisors so that pupils could be taken to the local park to play and have their lunch. Through implementation of the plan, there are now separate washrooms for staff. Classrooms and other parts of the building are tidy and clean and pupils are taken to the park four days a week to play outdoors under proper supervision. The requirements are now met.

p.5

action plan

The last inspection report indicated that parents and carers were not made aware that some information was available on request. The school website has been appropriately updated to provide the missing details.

p.5

Compliance with regulatory requirements

The school has made good progress and now meets all regulatory requirements. Independent school progress monitoring inspection report

p.5

School details

Type of school Muslim day secondary school

p.6

School details

Number of pupils with a statement of special educational needs

p.6

School details

Address of school 165–169 The Broadway Southall Middlesex UB1 1LS Telephone number 020 8867 9284

p.6

School details

Proprietor Islamic Educational and Recreational Institute

p.6

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion