Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 16 Feb 2011

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

What we read, and from where

Click a reading to see it highlighted in the report.

  • Postcode verified

    WN8 9TG

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+39Positivemore positive than 44% of reports of this type

In line with other reports of this type.

Praiseexceptionallygood progresspositiveimprovedeffectiveengagingeffectivelyimproving
Criticismweaknessespoorexclusionslow

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

Findings positive critical

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

Next steps

Quoted from the report. Tap to see it on the page.

No next steps set out.

Full report text

CfBT Inspection Services Suite 22 West Lancs Investment Centre Maple View Skelmersdale WN8 9TG T 0300 1231231 enquiries@ofsted.gov.uk www.ofsted.gov.uk Direct T 01695 566934 Direct F 01695 729320 gtunnicliffe@cfbt.com www.cfbt-inspections.com

p.1

Mrs Elaine Kucharski Headteacher Newbridge Learning Community Moss Lane Platt Bridge Wigan Lancashire WN2 3TL

p.1

Learning Community

Thank you for the help which you and your staff gave when I inspected your school on 1 February 2011, for the time you gave to our phone discussion and for the information which you provided before and during the inspection. Please give my particular thanks to the students for their friendly welcome and to the Chair of the Governing Body, the local authority representative and the School Improvement Partner for speaking with me.

p.1

Learning Community

The school’s annexe has closed since the last inspection. All groups of students are now based on the Newbridge site, although some spend time each week off-site, particularly for vocational learning activities.

p.1

Learning Community

As a result of the inspection on 25 and 26 November 2009, the school was asked to address the most important areas for improvement which are set out in the annex to this letter.

p.1

Learning Community

Having considered all the evidence I am of the opinion that at this time the school has made good progress in making improvements and satisfactory progress in demonstrating a better capacity for sustained improvement.

p.1

Learning Community

In lessons, students’ progress is accelerating. This is the result of greater consistency and continued improvement in the quality of teaching. In particular, learning is more rapid when the lesson content captures students’ interest, builds on their experiences and engages them in practical activities. Students are increasingly prepared to participate in discussions, to read aloud to one another and to commit their ideas in writing. This illustrates their improving attitudes to learning. Improvements are most marked in English lessons. However, sometimes improvements in the content of students’ written work are masked by persisting weaknesses in their handwriting and in the presentation of their work. On occasion, individual students continue to find it hard to participate because they are worried or unwell. These students are becoming more able to manage their own behaviour as a result of increasingly positive and sensitive relationships with staff. Consequently, the

p.1

Learning Community

Page2 number of occasions when learning is interrupted and the use of exclusions have both reduced significantly.

p.2

Learning Community

Although attainment remains low, the results for students at the end of Key Stage 4 in 2010 showed improvement compared to 2009. For the first time, a small proportion of students gained 5 A* to C grades at GCSE. In addition, almost all students gained a qualification in English and mathematics, whether at GCSE, Entry Level or in adult literacy and numeracy. The wider range of accreditation gained and the annual increases in students’ average points scores at the end of Key Stage 4 are evidence of better achievement. The accreditation offered is also allowing students to demonstrate better skills for the future, for example, through qualifications gained in citizenship or in preparation for working life. The work-related and vocational courses are also giving students greater opportunities to sample a number of career paths, including hospitality, beauty therapy and motor vehicle engineering. The widening curriculum also allows those students for whom it is appropriate

p.2

Learning Community

to show better attainment in art, music, history or geography, for example.

p.2

Learning Community

The overall attendance of students has improved considerably and at a faster rate than that recommended at the last inspection. This is the result of the school’s concerted efforts. The attendance of some individuals with a past history of exceptionally poor attendance has increased significantly. For students who find coming to school very difficult, flexible programmes which allow attendance in the evenings are proving increasingly effective in re- engaging them in education.

p.2

Learning Community

The school’s work in promoting community cohesion is having a stronger impact on students’ knowledge of different cultures. There are more links with the local community and growing opportunities to participate in cultural events and to meet people from different backgrounds, including through trips abroad. This has resulted in students’ greater understanding and tolerance of differences and in their increased respect for others, both at school, in the immediate community and more widely.

p.2

Learning Community

At the last inspection, the school’s capacity for sustained improvement was judged to be good. The school continues to build on this and to raise the expectations of staff and students as to what can be achieved. As a result, there is an increasingly shared understanding among senior leaders of the improvements made to date and of the priorities for the future.

p.2

Learning Community

The support of the local authority and the School Improvement Partner has challenged the school effectively in helping to raise achievement and to improve attendance.

p.2

Learning Community

I hope that you have found the inspection helpful in promoting improvement in your school. This letter will be posted on the Ofsted website.

p.2

25 and 26 November 2009

 Ensure that attendance improves by two per cent each year to enable more students to benefit from the school's good teaching and support for personal development.  In line with the school's community cohesion plan, ensure that students develop quickly a good understanding of the ethnic and religious context of their community in a local, national and global context.

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion