Skip to content

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Other · Ofsted report

Setting

Inspected — · published 15 Mar 2011

Help us get it right

Sign in (free) to send feedback, so we can tell you when it's fixed.

Original PDF ↗

Summary

No overall grade in this framework

Robert Lovett

What we read, and from where

Click a reading to see it highlighted in the report.

  • Inspectorssingle source

    Robert Lovett

  • Postcode verified

    UB5 4HB

Page 1 of 3
Page 1 of the report

Deep dive

What this report says

In plain English

Join free to get a short, plain-English summary of any report.

Tone of the report

How positive or critical the inspectors' language is, from the words they chose. No AI involved.

+52Positivemore positive than 52% of reports of this type

In line with other reports of this type.

Praiseoutstandinghigh expectationsimprovedenthusiasticconsistentlyenthusiasmvery welleffective
Criticismnot alwaysnot consistentlyfalling behindlowslownot clearly

How the report reads, start to finish

Every paragraph in order, sized by length. Tap one to see it on the page.

Findings positive critical

Strengths

Quoted from the report. Tap to see it on the page.

Concerns

Quoted from the report. Tap to see it on the page.

No strong criticism found.

Next steps

Quoted from the report. Tap to see it on the page.

What the report dwells on

Topics by how often they come up, coloured by how they are described. Open one for an example.

Anatomy of the report

How the report is built, against others of the same type and grade.

Pages
3
Words of findings
924
about usual (typical 1049)
Reading level
Hard
Flesch 43, typical 45
Average sentence
22 words
Next steps
2
typical 5
Hedged sentences
12%
“some”, “not always”, “most”…

Where the words go

Findings 100%

Full report text

Miss V Upton Headteacher Petts Hill Primary School Newmarket Avenue Northolt UB5 4HB

p.1

Primary School

Thank you for the help which you and your staff gave when I inspected your school on 17 February 2011, for the time you gave to our phone discussions and for the information which you provided before and during the inspection. Please pass on my particular thanks to those members of the senior leadership team with whom I met and to those Year 6 pupils who gave up some time to talk to me. Please also let Year 2 know how much I enjoyed their assembly.

p.1

Primary School

Since the school was last inspected an on-site children’s centre, managed by the school’s governing body, has opened. The school is currently receiving support from City Challenge intended to accelerate pupils’ progress and raise standards. The school is part of the ‘Place2Be’, a national project intended to help meet the emotional and social needs of pupils whose circumstances may make them vulnerable. Staffing is now relatively stable.

p.1

Primary School

As a result of the inspection on 25 November 2009, the school was asked to address the most important areas for improvement, which are set out in the annex to this letter. Having considered all the evidence I am of the opinion that at this time the school has made satisfactory progress in making improvements, and satisfactory progress in demonstrating a better capacity for sustained improvement.

p.1

Primary School

The attainment of pupils at the end of Key Stage 2 fell in 2010 and was low in both English and mathematics. This is in part a reflection of the low starting points of the particular group of pupils but is also due to the slow progress they made from the time they entered. Since then the quality of teaching throughout the school has improved so that most is now good and some is outstanding. In consequence almost all pupils are now doing better, progress is accelerating and standards are beginning to rise. In lessons observed pupils made good progress. They are enthusiastic learners with positive attitudes to work. They settle quickly, listen carefully and work Tribal 1–4 Portland Square BRISTOL BS2 8RR T 0300 123 1231 Text Phone: 0161 6188524 enquiries@ofsted.gov.uk www.ofsted.gov.uk Direct T 0845 123 6001 Direct F 0117 315 0430 email :sarah.cartlidge@tribalgroup.com Page 2 with sustained concentration. Teachers have high expectations about what pupils

p.1

Primary School

are able to do and how they should behave. Pupils share these expectations and behaviour is consistently good; they say that learning is fun and ‘in this school nothing is boring’. Since the school was last inspected the creative curriculum has had time to develop and pupils and teachers talk about it with huge enthusiasm. Cross-curricular links are increasingly evident and pupils are fulsome in their praise for the opportunities it provides to apply their writing skills in other subjects. The creative curriculum is having a significant impact on pupils’ confidence, enthusiasm for learning, and achievement. It is also building on the already good partnership with parents and carers and involving them directly in their children’s learning through the projects completed at home.

p.2

Primary School

Pupils’ progress is carefully monitored through the twice-termly progress meetings, where the achievement of each pupil is discussed and targets for improvement set. Procedures for tracking pupils’ progress are now well established and are used effectively to provide individualised support. Pupils spoken to were very enthusiastic about the 1:1 support in English and mathematics and certain about the impact it has in respect of their achievement. All of the pupils spoken to said it had improved their National Curriculum levels. Pupils know what their targets for improvement are and welcome the opportunity to be involved in assessing their progress against these. While marking is good at celebrating pupils’ achievements and giving praise, it does not consistently tell pupils clearly what they need to do to improve. Even where this does happen it is not always referred to in subsequent marking. This is a lost

p.2

Primary School

opportunity as marking is used very well to promote dialogue with pupils.

p.2

Primary School

The headteacher and senior leadership team have a clear focus on improving outcomes for pupils and are well placed to ensure the current rate of improvement is sustained. The school plan identifies appropriate areas for improvement and a range of measurable success criteria, many linked to raising achievement, but opportunities to benchmark progress along the way are not always grasped as firmly as they might be. Safeguarding arrangements comply fully with statutory requirements.

p.2

Primary School

The local authority improvement partner, together with advisors from City Challenge, has provided effective support for improving teaching and learning through joint collaborative reviews. The link with an outstanding school, facilitated by City Challenge, has made a significant contribution to supporting and validating the work of the school and the improvements it is making.

p.2

Primary School

I hope that you have found the inspection helpful in promoting improvement in your school. This letter will be posted on the Ofsted website.

p.2

Primary School

Robert Lovett, Her Majesty’s Inspector Page 3

p.2

place in November 2009

 Improve achievement in Years 1 to 6 in writing and mathematics by:  ensuring that all teachers have high expectations of what pupils can do  making effective use of the new creative curriculum to provide exciting opportunities for writing in other subjects  providing a wide range of practical, realistic mathematical tasks, including enterprise opportunities for older pupils.

p.3

place in November 2009

 Help pupils to make better progress in their work by:  ensuring that marking consistently helps them to improve  tracking their achievements regularly to identify any pupils falling behind  involving all pupils more fully in assessing how well they are doing.

p.3

Discuss this inspection

Members compare notes on inspectors and inspections here. Join free to read and post.

Join the discussion